Alara Resources Limited · ASX:AUQ

Alara Resources — Alara Uranium — Shareholder Meeting (November 2007)

10 slides from Alara Resources's shareholder meeting presentation, Nov 30, 2007

  1. Slide 1: Annual General Meeting Perth 2007 - Exploration Update

    For personal use only Annual General Meeting Perth 2007 Exploration Update Shanker Madan Managing Director 30th November 2007 Directors Presentation 2007 Alara Uranium Limited An international energy and resources company VICTOR HO - COMPANY SECRETARY Strategic mineral assets and acquisitions Advanc

  2. Slide 2: Excellent Management Team; Project Location - Australia

    Directors Presentation 2007 Excellent Management Team For personal use only Experienced Directors VICTOR HO - COMPANY SECRETARY • Shanker Madan – Managing Director • John Stephenson – Chairman • Farooq Khan – Executive Director Exploration Managers • Jerko Zuvela – Australia • Guido Arroyo ‐ Peru Di

  3. Slide 3: Project Location - Peru; 2007 Completed Programmes

    Directors Presentation 2007 For personal use only Project Location ‐ Peru VICTOR HO - COMPANY SECRETARY • Crucero • Pampacolca • Santa Rosa • Coasa Directors Presentation 2007 2007 completed programmes Acquisitions: • Acquisition of Crucero, Crucero Santa Rosa & Coasa uranium projects in Peru VICTOR

  4. Slide 4: Mt James

    Directors Presentation 2007 Mt James For personal use only • 4 granted tenements (427km²) • Airborne geophysical survey completed – >100 U‐channel anomalies selected. VICTOR HO¾- COMPANY Several SECRETARY anomalies larger than 1km long have recently been mapped through radiometric survey • Photo‐geo

  5. Slide 5: Bigrlyi South and Mt Lawrence

    Bigrlyi South Directors Presentation 2007 For personal use only • 5 tenements (1666km²) ‐ 4 ggranted. VICTOR HO - COMPANY SECRETARY • Airborne geophysical survey in progress. • Photo‐interpretation completed. • Primary mineralisation along favourable stratigraphy, possibly repeated by thrust faults.

  6. Slide 6: Canning Well and King Sound

    Canning Well Directors Presentation 2007 For personal use only • 2 tenements (280km²) – 1 granted; (awaiting grant of E46/585 – which contains the historically anomalous uranium, gold and base metal assay VICTORresults) HO - COMPANY SECRETARY • Mag/lag grid sampling completed – 1250 samples collecte

  7. Slide 7: Crucero

    Crucero Directors Presentation 2007 For personal use only • 3 concessions (2600Ha) • The project targets rhyolitic ignimbrites and ash flows of the Picotani Formation of Miocene‐Pliocene age, which formation and lithologies host se eral known several kno n uranium rani m occurrences occ rrences in t

  8. Slide 8: Pampacolca and Santa Rosa

    Pampacolca Directors Presentation 2007 For personal use only • 8 concessions (5300Ha) • Historical sampling reported 0.82% uranium oxide (U3O8) VICTOR HO - COMPANY SECRETARY • Reconnaissance sampling conducted – 81 samples collected. • Three anomalous samples; sample MD38 recovered 0.38% U SAMPLE U

  9. Slide 9: Coasa; 2008 1st Semester Programme

    Coasa Directors Presentation 2007 For personal use only • Large tenement holding ‐ 11 concessions (9600Ha) • Permian age Coasa Granite is associated with the Hercinian tectonic event of southern Peru, where it is well exposed • Historical IPEN sample returned 1900ppm Uranium • Veins and dykes in Per

  10. Slide 10: Thank You

    Directors Presentation 2007 For personal use only Thank You VICTOR HO - COMPANY SECRETARY The information in this presentation that relates to exploration results has been compiled by Mr Hem Shanker Madan who is a Member of The Australian Institute of Mining and Metallurgy. Mr Madan is the Managing

Alara Uranium — Shareholder Meeting (November 2007) on 6ix