Tolu Minerals Limited · ASX:TOK

Tolu Minerals — Investor Presentation (October 2024)

26 slides from Tolu Minerals's investor presentation, Oct 29, 2024

  1. Slide 1: Corporate Presentation

    Tolu Minerals Limited PNG CR Company Camp, Baruni Road, National Capital District, Papua New Guinea Company Registration No.: 1-125888 Level 2, 52 Merivale Street, South Brisbane, QLD 4101, Australia www.toluminerals.com ARBN: 657 300 359 29 October 2024 Corporate Presentation The Directors of Tolu

  2. Slide 2: Tolukuma Project

    For personal use only ASX:TOK, OTCQX:TOLUF ARBN 657 300 359 1-125888 Tolukuma Project Iain Macpherson 29 Oct 2024 This document is not a prospectus and does not contain all of the information that an investor may require in order to make an informed investment. All geological data presented in this

  3. Slide 3: Tolu Minerals Strategic Pillars

    TOLU MINERALS STRATEGIC PILLARS For personal use only World Class Explorer Optimized Operations The Right People Enriching Lives Investment of Choice 2

  4. Slide 4: Gold Mine: Papua New Guinea

    Tolukuma Gold Mine: Papua New Guinea ➢ PNG is located on the Pacific Ring of Fire. It is host to: For personal use only ➢ Prolific gold/copper mineralisation ➢ Many operating mines ➢ 100km as the crow flies from Port Moresby ➢ 60 km as the crow flies from the main North- South Hiritano Highway ➢ 35

  5. Slide 5: Gold Mine

    Tolukuma Gold Mine ➢ Fully self-contained mine with 20 years’ high-grade gold & silver operating history – circa 1 moz produced at 15g/t Au recovered ➢ Significant Mineral Resource Estimate in place ➢ Huge exploration upside both on and adjacent to the mine and also on the broader Tolukuma Structure

  6. Slide 6: Exploration Upside: Tolukuma Structure c. 1,500km2

    Tolukuma Structure – c. 1,500km2 Exploration Upside 7 exploration licenses on strike and parallel mineralised structures to Tolukuma gold mine For personal use only Additional EL application underway and a number of further targets Building a material mineral resource pipeline around Tolukuma Potent

  7. Slide 7: Mineral Resource Estimate

    Tolukuma Mineral Resource Estimate AMC reported an Inferred Mineral Resource as of 18 August 2022:1 ➢ 1.6 M tonnes @ 10 g/t Au and 38 g/t Ag For personal use only ➢ Contained metal 503 Koz Au and 1.9 Moz Ag ➢ Cut – off grade 3 g/t Domain Tonnes (t) Au (g/t) Ag (g/t) Au (oz) Ag (oz) Zine 488,000 9 43

  8. Slide 8: Near Tolukuma Mine: Gold Prospects

    Near Tolukuma Mine: Gold Prospects Based on the MRE tonnes and grades, extension of the Tolukuma vein system 2km to the SSE, grades of the Miliahamba prospect drilling, grades from drilling at Taula, Sisimonda and Kimono, grades and tonnage of the Saki Inferred Resource and trench sampling grades fr

  9. Slide 9: Gold Mine – Airborne MT Survey

    Tolukuma Gold Mine – Airborne MT Survey For personal use only ➢ State of the art geophysics ➢ Electrical resistivity imaging of the top 1 to 1.5km with complementary VLF data providing near surface conductivity information to define geological structures related to gold mineralisation, as well as ma

  10. Slide 10: Gold Mine – Airborne MT Survey

    Tolukuma Gold Mine – Airborne MT Survey ➢ Phase 1 of the Airborne MT survey completed over the Tolukuma and Ipi River area including a higher resolution over the ML area Results at Tolukuma show advanced copper-gold For personal use only ➢ porphyry and gold epithermal mineralising targets ➢ Signific

  11. Slide 11: Gold Mine – Access Road

    Tolukuma Gold Mine – Access Road ➢ Complete the remainder of the 70 km access road connecting the mine to the Tapini road and Port Moresby; ➢ Strong community and government support Work commenced in December 2023 after the completion of For personal use only ➢ the IPO; ➢ The contractor is an experi

  12. Slide 12: Issues and Solutions

    ISSUES AND SOLUTIONS The previous failure of the Tolukuma Gold Mine was underpinned by four key factors – Tolu is addressing all four factors For personal use only ➢ High historical logistics costs – Access road construction The Mine was 100% supported by helicopter logistics because the access road

  13. Slide 13: Development Strategy

    Tolukuma Development Strategy Dec 2023 Dec 2024 Near Mine Exploration For personal use only Exploration MT Survey Strategy Regional Exploration Access Road development Base Line Study Planning Engineer, Procure, Construct full scale Tailings, HV reticulation, Resource Targets, Process Plant Mine pla

  14. Slide 14: Development Strategy: Progress

    Tolukuma Development Strategy: Progress For personal use only ➢ Near mine exploration: ➢ Phase 1 airborne MT: flying complete over Tolukuma regional and Ipi River, c. 900 km2 completed, en route to Mt. Penck ➢ Analysis underway – 80% ➢ Taula drill campaign completed assays outstanding – 95% ➢ Drilli

  15. Slide 15: Development Strategy: Progress

    Tolukuma Development Strategy: Progress For personal use only ➢ Site mobilisation: ➢ Accommodation: 100 beds, clinic completed, community clinic completed, mess, office – 80% ➢ Fuel storage – tank refurbishment completed, reticulation piping underway ➢ Assay laboratory: commissioned, calibration und

  16. Slide 16: Gold Plant Optimisation

    Gold Plant Optimisation ➢ Low opex start up ➢ Modular and expandible For personal use only ➢ Recovery enhancement opportunities Early return to production and revenue contribution 15

  17. Slide 17: Gold Mine – Gold Plant

    Tolukuma Gold Mine – Gold Plant For personal use only ➢ Site preparation 90% ➢ Plant fabrication 100% complete, expected to arrive in POM on 3 November ➢ Commissioning and first production: December First production December 2024 16

  18. Slide 18: Dewatering

    Dewatering ➢ Early start through innovative siphoning For personal use only ➢ Reduced the pumping load (and cost) by an estimated +30% ➢ Pumping now commissioned to accelerate dewatering ➢ Will extend siphoning system to maintain levels once the Phase 1 dewatering objective is met Dewatering well ad

  19. Slide 19: Dewatering

    Dewatering For personal use only ➢ Upper-level dewatering to enable commencement of production and underground diamond drilling exploration reached 1550 level ➢ Pumps being relocated to final position for dewatering of Fundoot Production areas accessed 18

  20. Slide 20: Mine planning

    Mine planning ➢ Accessing upper workings ➢ Face and stockpile sampling completed For personal use only ➢ Refurbishment of rockdrills underway ➢ Establishing crews ➢ Mobile equipment refurbishment underway, supplemented by new orders ➢ Ventilation survey completed ➢ First production Q4, 2024 Measured

  21. Slide 21: Since IPO

    ASX:TOK, OTCQX:TOLUF Since IPO, Nov 23 For personal use only 26 Oct 24 ➢ Tolu have raised circa AU$67 million: ➢ OTC quotation, which: ➢ AU$11.3 pre-IPO @ AU$0.37 ➢ Broadens market exposure ➢ AU$17.3 IPO @ AU$0.50 ➢ Increases US participation ➢ AU$2.2 – stock component of road contract on ➢ Broadens

  22. Slide 22: Contacts

    Contacts For personal use only Iain Macpherson +27 76 238 4461, + 61 428 912 245, +675 7202 7320 MD & CEO iain.macpherson@toluminerals.com Vern Wills +61 418 912 664 Strategic Corporate Advisor vern.wills@enhance.net.au 21

  23. Slide 23: Disclaimer and Important Information

    Disclaimer and Important Information Important notice These presentation slides (the “Slides”) have been issued by Tolu Minerals Limited (the “Company” or “Tolu”) in relation to an update on activities by the Company. These Slides do not comprise an admission document, listing particulars or a prosp

  24. Slide 24: Disclaimer and Important Information

    Disclaimer and Important Information Investment risks All investments in securities are subject to known and unknown risks, including an investment in Tolu shares. Some of these risks are beyond the control of Tolu and its directors and officers, and Tolu does not guarantee any particular rate of re

  25. Slide 25: Disclaimer and Important Information

    Disclaimer and Important Information Disclaimer To the maximum extent permitted by law, the Company each of its respective related bodies corporate, shareholders and affiliates, and each of their respective officers, directors, partners, employees, representatives, affiliates, agents, consultants an

  26. Slide 26: Disclaimer and Important Information

    Disclaimer and Important Information Competent Persons Statement The information in this presentation that relates to Exploration Results, Mineral Resources and Ore Reserves were last reported by the Company in compliance with the 2012 Edition of the JORC Australasian Code for Reporting of Explorati

Tolu Minerals — Investor Presentation (October 2024) on 6ix