  1. Slide 1: Delivering Clean Energy for the Mid West

    Delivering Clean Energy for the Mid West Chairman’s General Meeting Presentation 19 August 2022 PILOT ENERGY LIMITED ASX:PGY

  2. Slide 2: Compliance statements

    Compliance statements Disclaimer Competent Persons Statement This investor presentation has been prepared by Pilot Energy Limited ABN 86 115 229 984 (Pilot or the Company). This announcement contains information on conventional petroleum and carbon storage resources which is based on and fairly Any

  3. Slide 3: Vision

    Vision Transform existing assets and infrastructure delivering an integrated cost competitive clean energy solution Western Current Operations Integrated Clean Energy Portfolio Australia Wind / Solar Carbon Capture & Cliff Head Oil Storage (CCS) Field Clean Energy Clean Resource hub H2 / Ammonia & T

  4. Slide 4: Mid West Clean Energy Project

    Mid West Clean Energy Project Staged development of blue hydrogen and ammonia production starting with CCS Stage 1 – Carbon Capture & Storage Stage 2 - Blue H2 Production Stage 3 H2 Expansion to Export Ammonia Timing: ~2025 CCS Timing: 2025 - 2027 Timing: 2027 - 2030 • Conversion of Cliff Head Offsh

  5. Slide 5: Cliff Head CCS – Project Overview

    Cliff Head CCS – Project Overview Key enabler of low cost clean hydrogen and ammonia production for the Mid West Clean Energy Project • Stage I of the Mid West Clean Energy Project is the development of a carbon capture and storage project located on the Mid West Coast located 270km north of Perth I

  6. Slide 6: Global CCS Facilities In Operation

    Global CCS Facilities In Operation Cliff Head CCS is a Global Top 10 CO2 Injection Capacity Project Carbon Dioxide Capture Capacity in million metric tons per year, 2021 Shute Creek Gas Processing Plant (United States) 7.0 Century Plant (United States) 5.0 Petrobras Santos Basin Pre-Salt Oil Field C

  7. Slide 7: Social Impact

    Cliff Head CCS Social Impact 0.5 35,000 57 million p.a. million tpa p.a. Initial planned annual Cliff Equivalent hectares of Equivalent number Head CCS CO2 agroforestry planting per of tree plantings per sequestration annum(1) annum(2) Sources 1. Source: The FLR Carbon Storage Calculator applies dat

  8. Slide 8: Enabling technology

    Enabling technology Unique opportunity to integrate CCS, hydrogen, ammonia and renewables using proprietary 8 Rivers technology 8 Rivers 8RH2 technology • Proven technology which is currently deployed at scale Renewables & Electrolysers H2 • High hydrogen production efficiency while LOX requiring mi

  9. Slide 9: Stage II – Blue Hydrogen

    Stage II – Blue Hydrogen Cliff Head CCS will enable cost competitive industrial scale blue hydrogen production Blue hydrogen production with direct/integrated Cliff Head CCS Levelized cost of hydrogen (LCOH) in the range of • Feasibility studies indicate production capacity of 43,000 tpa of blue hyd

  10. Slide 10: Mid West Renewables provides growth platform

    Mid West Renewables provides growth platform Large cost-competitive renewable energy resources identified in the vicinity of the Mid West Clean Energy Project • Over 18 GW of renewable resource potential in the area identified from feasibility studies Mid West Clean Energy Project Total Identified R

  11. Slide 11: Stage III – Clean Ammonia Production

    Stage III – Clean Ammonia Production Ammonia from blue hydrogen is both a low cost and clean energy source and supply vector for hydrogen Clean ammonia emerging as a cost competitive LNG Levelized cost of ammonia (LCOA) in the range of A$370 replacement to A$400 per tonne, leveraging CCS and renewab

  12. Slide 12: Mid West Clean Energy Project − bringing it all together

    Mid West Clean Energy Project − bringing it all together Stage II Blue Hydrogen • Hydrogen production integrated with Cliff Head C02 Hub CCS utilising 8 Rivers 8RH2 technology Blue Hydrogen C02 to CSS Production • Ability to accept C02 rich raw gas with ≥97% direct carbon capture of CO2 already at p

  13. Slide 13: Key next steps

    Key next steps Over the next 12-months Pilot (as operator) together with JV Partner Triangle Energy will be focused on the activities to deliver the Cliff Head CCS Project Corporate • Analyse & implement feasibility studies • Commence engagement with prospective project partners Next 12-months aimed

  14. Slide 14: Contact details

    Contact details Pilot Energy Limited Level 1, 85 Elizabeth Street Paddington, NSW 2021 www.pilotenergy.com.au Brad Lingo Tony Strasser Nick Watson Chairman Managing Director Head of Renewables & Commercial blingo@pilotenergy.com.au tstrasser@pilotenergy.com.au nwatson@pilotenergy.com.au 14 Pilot Ene