  1. Slide 1: Steelpoortdrift Vanadium Project

    Steelpoortdrift Vanadium Project Mining Journal Select Presentation March 2023 ASX:VR8 WWW.VR8.GLOBAL

  2. Slide 2: Disclaimer

    Disclaimer This presentation does not constitute investment advice. This presentation has been prepared by Vanadium Resources Limited (“the Company” or ASX:VR8) to provide summary information about the Company and its activities as at the date of this presentation (March 2023). Neither this presenta

  3. Slide 3: Emerging Vanadium Producer

    Emerging Vanadium Producer One of the world’s largest DFS indicates strong financial Ore body easy to mine, Using conventional / proven and highest-grade outcomes with post-tax NPV7.5% low strip ratio & low concentrate & Salt Roast Leach vanadium deposits of US$1.2Bn (US$0.9Bn att.), operating cost

  4. Slide 4: Corporate Overview

    Corporate Overview Corporate Structure (ASX: VR8) – as at 21 March 2023 Top Shareholders Board of Directors 1 Danterne Pty Ltd1 9.4% Jurie Wessels 484.4m A$0.07 A$33.9m 2 Raubex Pty Ltd 9.1% Executive Chairman Shares on issue Share Price Market Cap (undiluted) (@ $0.07c) 3 Romfal Sifat Pty Ltd 4.1%

  5. Slide 5: Why Vanadium

    Why Vanadium Listed as a Critical Mineral in Australia, the US, UK and European Union, Vanadium demand is expected to grow significantly from its energy storage capabilities Vanadium Redox Flow Batteries (VRFB’s) Steel & Alloys  VRFBs forecast to represent up to 20% of total battery capacity1  Ove

  6. Slide 6: Global Demand & Pricing Dynamics

    Global Demand & Pricing Dynamics Source: Vanitec & TTP Squared Inc Steel: 90% The forecast annual Steel demand is VRFB’s: 6-7% demand for VRFB’s alone expected to double by Aerospace: 2-3% Future demand equates to between 127.5kt 2050 with potential VRFBs forecast to represent between and 173.8kt by

  7. Slide 7: DFS Delivers World Class Vanadium Project

    DFS Delivers World Class Vanadium Project US$1.21bn US$896m US$152m 42% (A$1.9bn) (A$1.4bn) (A$237m) NPV7.5% (post-tax) Attributable NPV Yearly Free Cashflows IRR (post-tax) 27 months US$211m US$3.24 US$9.50 (A$329m) (Deloitte forward mid-range) Incl. Contingency Payback Start up Capex Cash Costs V2

  8. Slide 8: Location – in the Bushveld Complex

    Location – in the Bushveld Complex This world-renowned mining location is host to several mining operations, multiple major mining companies are active in the area, and is in close proximity to existing infrastructure. Other Mines in the Bushveld Complex Vametco – Vanadium Mine Rhovan – Vanadium Min

  9. Slide 9: Mine, Concentrator & SRL

    Mine, Concentrator & SRL Mine Site – View of the North of Mining Area The mine site, concentrator and SRL sites are located within a substantial mining and smelting district, with well established infrastructure (including water, power, sealed roads, rail, etc) VR8 Offices and Warehouses in Steelpoo

  10. Slide 10: Resources & Ore Reserves

    Resources & Ore Reserves  Global Mineral Resource of 680Mt at 0.70% V2O5  Total Ore Reserve of 77Mt at 0.72% V2O5  Mineralisation outcrops at surface and dips shallowly (~10º) – less waste to mine, low strip ratios (0.88x waste : ore) and cheaper mining cost  Orebody able to achieve a high-grade

  11. Slide 11: Global Primary Resources

    Global Primary Resources 3.0% 2100 Tonnes In Situ Grade Concentrate Grade 1800 2.5% Resource Tonnage (Millions) 1500 2.0% 1200 %V2O5 1.5% 900 1.0% 600 0.5% 300 0.0% 0 Largo Glencore Bushveld Bushveld Bushveld Vanadium Australian Richmond Technology Maracás Rhovan Vametco Brits Mokopane Resources Van

  12. Slide 12: Location of Mineral Resources & Ore Reserves

    Location of Mineral Resources & Ore Reserves  The final pit design and Ore Reserves based on LOM of 25 years Location and Classification of Location and Classification of (designed to match Mining Right term) Mineral Resources Ore Resources  Final pit design was based on Pit 17, which highlights p

  13. Slide 13: Open Pit Design and Schedule

    Open Pit Design and Schedule  Detailed pit designs have been developed across three open pits and scheduled over the 25-year life of the project  The mining schedule was able to achieve high ROM grades of greater than 0.80% V2O5 for the first 8 years, with a LOM average grade of 0.71% V2O5 12 WWW.

  14. Slide 14: Concentrator Plant

    Concentrator Plant Concentrator flow sheet Dewatering based on proven Regrind Magnetic technology Separation Areas Dewatering Wet Magnetic Separation Two-stage Crushing Circuit Concentrate Product Ball @ 2.08-2.16% V2O5 Milling 13 WWW.VR8.GLOBAL

  15. Slide 15: SRL Plant

    SRL Plant SRL flow sheet based on proven technology SO2 SRL Plant comprises kiln Scrubber roasting, desilification, ammonium metavanadate Kiln Roasting (“AMV”) precipitation, flash drying and V205 flake production Crystalliser Concentrate feed rate of 790ktpa with a grade of >2.00% V2O5 to Flash Dry

  16. Slide 16: Offtake, Strategic Investment and Project Financing

    Offtake, Strategic Investment and Project Financing Commenced process toward securing binding offtake, Hand specimen of strategic investment and project financing vanadiferous titanomagnetite from the SPD Vanadium Offtake Agreement & Strategic Investment Project1  A process is underway with a range

  17. Slide 17: ESG Initiatives

    ESG Initiatives Renewable Dry deposition of Co-products Community electricity supply tailings Inclusion of 5MW PV solar Dewatering of tailings Studies underway to Initiatives to maximize plant reduces carbon footprint material means reduced unlock value from other community involvement and and relia

  18. Slide 18: Preliminary Project Timeline

    Preliminary Project Timeline Year CY23 CY24 CY25 Quarter Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Environmental & Water Permits Build Project Development & Operations Team FEED Offtake & Strategic Investment Debt Financing FID Engineering & Procurement Construction Production (incl. Ramp up) 17 WWW.VR8.G

  19. Slide 19: Growth Catalysts to Increase Shareholder Value

    Growth Catalysts to Increase Shareholder Value Key Catalysts to FID  Secure long-term offtake(s)  Secure project funding from combination of:  Ropeway conveyor from Mine to SRL plant i. Debt ~65% PF debt Optimise  Delineation drilling and re-optimisation ii. Equity ~35% from offtakers, strategic

  20. Slide 20: Investment Highlights

    Investment Highlights Strong financials with attributable NPV of A$1.4bn, IRR of 42% Significant upside potential with a range of opportunities and and payback period of 27 months initiatives identified to increase value Competitive Capex (US$211m) and lowest quartile Opex Building a strong project

  21. Slide 21: Appendix

    Appendix March 2023 ASX:VR8 WWW.VR8.GLOBAL

  22. Slide 22: Board & Management

    Board & Management Jurie Wessels has 26 years’ experience in the exploration industry and co-founded a number of exploration and mining companies, including Bauba Resources Ltd (BAU.J), which owns three operating chrome mines, GoldStone Resources Ltd (GRL.L), which company is mining the Homase-Akrok

  23. Slide 23: Peer Comparison

    Peer Comparison Largo Maracas1,2&3 Steelpoortdrift (VR8) 4&5 Bushveld Mokopane6 TMT Project7,8 AVL Project9 Richmond Vanadium10 In Production DFS Stage PFS Stage DFS Stage BFS stage PFS Stage (Results as at 30 Dec 2021) V2O5 Price US$7.80/lb US$9.50/lb US$7.50/lb US$10.50/lb US$10.50/lb US$9.60/lb M

  24. Slide 24: Peer Comparison Table

    Peer Comparison Table Resource Resource Concentrate Company Code Project Stage Resource Category Information Source Tonnes Grade Grade Measured, Indicated & Largo LGO.TSX Maracas Production 79 0.79 2.46 Largo Maracas NI43-101 Technical Report - 16th December 2021 Inferred (NI43-101) Measured, Indica

  25. Slide 25: Insert Heading here

    Insert Heading here Lorem ipsum paragraph text goes here Lorem ipsum paragraph text goes here Lorem ipsum paragraph text goes here Lorem ipsum paragraph text goes here Lorem ipsum paragraph text goes here Lorem ipsum paragraph text goes here Lorem ipsum paragraph text goes here. • Dot point goes her