Lcl Resources Limited · ASX:LCL

Lcl Resources — Metminco — Investor Presentation (September 2015)

50 slides from Lcl Resources's investor presentation, Sep 24, 2015

  1. Slide 1: ASX Announcement: Presentation – Los Calatos High Grade Development Option

    ASX ANNOUNCEMENT 24 September 2015 PRESENTATION – LOS CALATOS HIGH GRADE DEVELOPMENT OPTION Metminco Ltd (ASX : MNC; AIM : MNC) is pleased to announce that it has today released a presentation in relation to the results of the Strategic Mining Study Report recently completed by RungePincockMinarco (

  2. Slide 2: Company Background, Projects and Mineral Resources

    ASX ANNOUNCEMENT METMINCO LIMITED 24 September 2015 Company Background Metminco is a dual ASX and AIM listed company with a portfolio of copper, molybdenum and gold projects in Peru and Chile. Projects and Mineral Resources The Los Calatos Project, located in southern Peru, has a total estimated min

  3. Slide 3: RPM Study Notes and Forward Looking Statement

    ASX ANNOUNCEMENT METMINCO LIMITED 24 September 2015 Further, the RPM global team’s knowledge base has been gained through the conduct of work in over 118 countries, and their approach to the business of mining is strongly grounded in economic principles. The company’s cutting-edge mining software te

  4. Slide 4: For further information contact

    ASX ANNOUNCEMENT METMINCO LIMITED 24 September 2015 For further information contact: METMINCO LIMITED Stephen Tainton / Phil Killen Office: +61 (0) 2 9460 1856 NOMINATED ADVISOR AND BROKER RFC Ambrian Australia Will Souter/ Nathan Forsyth Office: +61 (0) 2 9250 0000 United Kingdom Samantha Harrison

  5. Slide 5: Los Calatos: High Grade Development Option

    INVESTOR PRESENTATION Los Calatos : High Grade Development Option September 2015 0

  6. Slide 6: Disclaimer

    Disclaimer This presentation (the “Presentation”) is strictly confidential to the recipient and has been prepared by Metminco Limited (“Metminco” or the “Company”) based on the information available to it. It is intended solely for the information of the initial recipient of this presentation. Metmi

  7. Slide 7: Corporate Focus – 3 Initiatives

    CORPORATE FOCUS – 3 INITIATIVES 1. DEVELOPMENT OF LOS CALATOS Cu-Mo PROJECT IN PERU • RungePincockMinarco (RPM) Strategic Mining Study completed in accordance with a defined Scope of Work • Development of Los Calatos commencing with an underground, sub-level cave, mining operation • Favourable econo

  8. Slide 8: Los Calatos Project

    . Los Galatos Project

  9. Slide 9: Priority high grade copper development project

    Priority high grade copper development project Los Calatos Cu-Mo Porphyry Complex • Estimated mineable quantity of 134.3Mt @ • Excellent regional infrastructure 0.89% Cu & 360ppm Mo (Mill head grade) • Designated “Project of National Interest” by • LoM of 22 years with average steady state Peruvian

  10. Slide 10: Located in prolific Cu-Mo mining district, Southern Peru

    Located in prolific Cu – Mo mining district, Southern Peru Close proximity to substantial open pit mining operations Cerro Verde Toquepala Cuajone Unit Started production 1976 1960 1976 Reserves: ¹ Cu grade 0.51% 0.55% 0.37% Mo grade 0.019% 0.032% 0.020% Cut-off grade (CuEq) 0.19% 0.23% 0.17% Strip

  11. Slide 11: Project is highly deliverable – development risks low

    Project is highly deliverable – development risks low  Social Licence • No exposure to local potable water issues • No competing land use • All surface rights covering the project will be acquired directly from the Peruvian government - Project of National Interest status  Access to Power and Wate

  12. Slide 12: Pre-production capital expenditure

    Pre-production capital expenditure Estimated pre-production capital Parameter US$ (millions) Flotation plant, Mo plant, indirect costs 233 Underground mine including development, equipment and conveyor 58 Infrastructure including power supply, water pipeline, road access, site 216 facilities, worksh

  13. Slide 13: Key operational parameters

    Key operational parameters Life of Mine – Operational Parameters Parameter Amount Annual tonnes milled (millions) 6.5 Annual copper in concentrate (kt) 50 Annual molybdenum in concentrate (kt) 1.3 Mining costs (US$/t) 14.27 Processing costs (US$/t) 6.05 G & A costs (US$/t) 1.34 By-product credits (U

  14. Slide 14: Key performance indicators

    Key performance indicators LoM Performance Indicators Parameter LoM Total tonnes mined (millions) 134.3 Average milled copper grade (%) 0.89 Average milled molybdenum grade (%) 0.036 Copper in concentrate (kt) 1,101 Molybdenum in concentrate (kt) 32 EBITDA (US$ millions) 3,820 Unlevered cash flow be

  15. Slide 15: LoM cash costs – Comparison with global producers

    LoM cash costs – Comparison with global producers Cash Cost Estimates (US cents/lb Cu) – 269 Projects / Mines 400 C1 cash operating cost after by-product credits (US cents/lb) 350 300 250 200 Los Calatos 150 129.00 100 50 0 0 10 20 30 40 50 60 70 80 90 100 -50 (0 Mlbs) Cumulative % Paid Metal (Mlbs

  16. Slide 16: Competitive capital intensity

    Competitive capital intensity Capital intensity – Initial Capital (US$) vs. Ave LoM Cu production (ktpa) 35,000 Capital Intensity (Initial Capital US$/Annual Cu) 30,000 25,000 20,000 Los Calatos 15,000 13,100 10,000 5,000 0 100 0 10 20 30 40 50 60 70 80 90 (0 ktpa) Cumulative % Cu (ktpa) (9,292 ktpa

  17. Slide 17: Good regional infrastructure

    Good regional infrastructure  Road and Access Proposed Services Corridor • Close to Pan American highway (50km) and the Port of Ilo (100km SW)  Power Supply • Power will be sourced from the regional city of Moquegua 32km SSE of the project • Power costs – long term price 6c/kWh  Services Corridor

  18. Slide 18: Project infrastructure

    Project infrastructure 75km Pipeline 45km Access Road 32km Powerline Quebrada Guaneros Province Limit PNI Area 13,363km² Reserve 13

  19. Slide 19: Mineral Resource Estimate @ June 2015 (JORC 2012)

    Mineral Resource Estimate @ 15 June 2015 (JORC 2012) 4,500 1.30 4,000 Tonnes 1.20 Cu% 1.10 3,500 1.00 3,000 0.90 Tonnes (Mt) Cu (%) 2,500 0.80 2,000 0.70 0.60 1,500 0.50 1,000 352Mt @ 0.76% Cu 0.40 500 0.30 0 0.20 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0

  20. Slide 20: Breccia/Total Resource

    98% of contained Cu metal in the breccias at a 0.70% Cu cut-off 100% 1.40 90% 1.20 80% Breccia/Total Resource In Situ Cu Grade (%) 70% 1.00 60% 0.80 50% 40% 0.60 154Mt @ 0.98% Cu 30% (98% of total Cu 0.40 20% metal) 0.20 10% 0% 0.00 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.

  21. Slide 21: Life of Mine production – mineable quantity & head grade

    Life of Mine production – mineable quantity & head grade 7.00 1.20% 6.00 1.00% 5.00 0.80% Head Grade % Million tonnes 4.00 0.60% 3.00 0.40% 2.00 0.20% 1.00 0.00 0.00% Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22 Year 1 Year 2 Year 3 Year 4 Y

  22. Slide 22: Life of Mine Production – Cu & Mo concentrate

    Life of Mine Production – Cu & Mo concentrate 70 60 50 Metal in Concentrate (kt) 40 30 20 10 - Yr Yr Yr Yr Yr Yr Yr Yr Yr Yr Yr Yr Yr Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Mo_in_Conc 0.8 1.3 1.3 2.2 2.6 1.7 2.2 2.2 2.2 1.7 1.7 1.3 1.3 1.3 1.3 0.8 1.3 0.8

  23. Slide 23: Comparison: Los Calatos vs. Ernest Henry

    Comparison: Los Calatos vs. Ernest Henry Los Calatos (Peru) Ernest Henry (Australia) Parameter Planned Estimated Mining Operation Underground Open Pit & Underground Underground mining method Sub-level caving Sub-level caving Ore Mined 134.3 Mt @ 0.89% Cu & 0.036% Mo 64.3Mt @ 1.03% Cu & 0.53g/t Au ¹

  24. Slide 24: Next steps

    Next steps ……  REVIEW ECONOMICS OF RPM MINING STUDY Q3 2015  ENGAGE WITH SUITABLE STRATEGIC AND FINANCIAL DEVELOPMENT PARTNERS  DRILL TD2 EXPLORATION TARGET AS A PRIORITY  PROCEED TO PRE-FEASIBILITY AND FEASIBILITY STAGE 19

  25. Slide 25: Mollacas Project

    . Mollacas Project

  26. Slide 26: Mollacas in brief

    Mollacas in brief 100% owned, small • Measured and Indicated Mineral Resource of 15.5Mt @ 0.51%CuT undeveloped Copper Leach project • Project area of 33km² including 20 Exploration Concessions Located in close • 55km ESE of Ovalle with road infrastructure and access to power proximity to infrastruct

  27. Slide 27: Copper leach project – Mineral Resource Estimate

    Copper leach project – Mineral Resource Estimate Mineral Resource Estimate – Oxide & Secondary Sulphide Zone (July 2012) Grade Contained Metal Category Tonnes (Mt) CuT (%) Cu_Sol (%) CuT (t) Cu_Sol (t) Measured 11.2 0.55 0.44 61,424 49,140 Indicated 4.3 0.41 0.29 17,687 12,510 Total 15.5 0.51 0.40 7

  28. Slide 28: Mollacas target – supergene cap of primary porphyry

    Mollacas target – supergene cap of primary porphyry Secondary Sulphide Secondary Zone –– highest Sulphide Zone highest copper copper grades (50 –- 100m grades (50 100m below below surface) surface) W COPPER LEACH PROJECT E Oxide Zone Secondary Sulphide Zone CuT % Transitional Sulphide Zone Primary S

  29. Slide 29: Phase 3 metallurgical testwork yields positive results

    Phase 3 metallurgical testwork yields positive results Metallurgical testing  16 columns representing 5 geo- metallurgical units  Acid consumption in agglomeration stage 10kg/t ore leached  85% soluble copper  Ore crush size of P80 12mm to 16mm  Stacked ore depth of 6 metres  Opportunity to re

  30. Slide 30: Mollacas progressing towards development

    Mollacas progressing towards development Preliminary layout – SX/EW operation  Completed • Updated Scoping study • Resource definition drilling • Geotechnical design work for open pit OP & leach pads • Phase 3 column leach test work WD • Preliminary layout of mining WD infrastructure AG • Environme

  31. Slide 31: Life of mine financial model yields robust results

    Life of mine financial model yields robust results Physicals Unit Parameter Financials Unit Parameter Mining rate tpd 6,108 Total Capital Expenditure US$000’s 52,306 Crushing rate ktpa 2,500 C1 Cash Operating Costs US$/lb Cu 1.23 Tonnes leached kt 14,500 Project Economics Unit Parameter Average Cu_S

  32. Slide 32: Mollacas – Access Rights

    Mollacas – Access Rights  Metminco holds 21 Exploitation Concessions & surface rights to 179ha  Private landowner holds surface rights over planned open pit  First Extension to Initial Servidumbre / Easement declared invalid by the Court of Appeal of the IV Region  Appeal against ruling lodged w

  33. Slide 33: Appendix: Los Calatos Geology & Mining

    APPENDIX 1 Los Galatos Geology & Mining

  34. Slide 34: Geometry of mineralised hydrothermal breccias

    Geometry of mineralised hydrothermal breccias Geological Plan 2050m RL Geological Section 10350 E 0 250 500m 0 250 500m Hydrothermal breccias • Exhibit well defined lateral and vertical continuity 29

  35. Slide 35: Conceptual Mine Design – Looking East

    Conceptual Mine Design – Looking East Alternate Case Two Decline Systems and a Central Shaft System • Eastern Decline down to the 2,175mRL • Western Decline down to the 2,300mRL • Vertical Shaft System to extend below to the 1,550mRL Expansion Case Two Decline Systems and a Central Conveyor System •

  36. Slide 36: Primary mining method comprises sub-level caving

    Primary mining method comprises sub-level caving Source: Page & Bull (2001) 31

  37. Slide 37: Appendix: Los Calatos Exploration Potential

    APPENDIX 2 Los Galatos Exploration Potential

  38. Slide 38: 8 exploration targets identified in project area

    8 exploration targets identified in project area Exploration Targets  8 targets identified • 4 drill ready exploration targets (TD1 to TD4) • 4 exploration targets (TE1 to TE4)  Targets defined on basis of geophysics and geochemistry  Initial work suggests porphyry complex extends to the southeas

  39. Slide 39: Target TD2 – similarities with the Los Calatos deposit

    Target TD2 – shares a number of similarities with the Los Calatos deposit Target TD2 – Drill Ready Target  Located in similar structural setting to the main Los Calatos deposit  Supported by geophysics and geochemistry  Outcropping, mineralised, breccias similar to those intersected in drill hole

  40. Slide 40: Schematic cross section - Los Calatos and Target TD2

    Schematic cross section - Los Calatos and Target TD2 Exploration Target TD2 • Outcropping shallow-level hydrothermal breccia containing chrysocolla (hydrated copper cyclosilicate) mineralisation • Extends over strike distance of >200 metres • Presence of cryptocrystalline quartz indicative of the up

  41. Slide 41: Appendix: Overview: Copper & Peru

    APPENDIX 3 Overview: Copper & Peru

  42. Slide 42: Global copper supply – demand dynamics

    Global copper supply – demand dynamics  COPPER WILL REMAIN SUPPLY CONSTRAINED AND A DEFICIT IS EXPECTED IN 2018 • The outlook for copper remains compelling as emerging economies transition to consumption led growth • Global copper demand is expected to grow at a CAGR of 2.3% to 2030 • In the near t

  43. Slide 43: Peru remains an attractive mining jurisdiction

    Peru remains an attractive mining jurisdiction  Government type : Constitutional Republic.  Legal system : Based on civil law.  Executive branch : Chief of state and head of government: President Ollanta Humala (since July 2011).  Elections : Every five years by popular vote (non consecutive re-

  44. Slide 44: Economic performance 2009 to 2013

    Economic performance 2009 to 2013 Key Indicator 2009 2010 2011 2012 2013 Annual Percent Change Real GDP 0.9 8.8 6.9 6.3 6.3 Inflation (eop) 1 0.2 2.1 4.7 2.8 2.0 Policy rate (eop %) 1.5 3.0 4.25 4.25 .. Real exchange rate 2 3.4 2.4 -1.0 8.8 .. Percent Output gap 3 -2.2 -0.2 0.2 0.0 -0.1 External cur

  45. Slide 45: Copper production to increase to 2.8Mtpa by end 2015

    Copper production to increase to 2.8Mtpa by end 2015  Long history of mining, second largest producer of copper after Chile.  Five major copper mines, with an estimated investment of $13 billion, are expected to begin production in Peru before 2016, increasing the country’s copper output from 1.3

  46. Slide 46: Southern Peru gas pipeline – improved power costs

    Southern Peru gas pipeline – improved power costs  Camesia gas pipeline now under construction - due for completion 2016/2017  Gas to fuel power generation, explosives and agricultural industries and gas sales  Will deliver long term low cost power to the Region  Government indication to Minera

  47. Slide 47: Corporate

    . seanie _ 42

  48. Slide 48: Capital structure, shareholding & volumes traded

    Capital structure, shareholding & volumes traded Listed ASX : AIM MNC.AX MNC.L Shareholding (30 June ’15) Directors & Management 10.8% Share Price (17 Sept ‘15) A$0.005 [£0.002] Top 10 Shareholders 31.8% Share price (52-Weeks) A$0.003 - A$0.019 Top 25 Shareholders 47.2% Issued Shares 2,656m Daily Vo

  49. Slide 49: Board of Directors

    Board of Directors Executive and Non-Executive Directors Timothy (Tim) Read William Howe Steve Tainton Chairman Managing Director Executive Director • Tim has over 40 years’ experience in the • William has over 30 years’ experience in • Steve is a geologist by profession and metals and mining sector

  50. Slide 50: Contact details

    Contact details Sydney Office Metminco Limited Level 6 122 Walker Street North Sydney NSW 2060 Australia Ph: +61 (2) 9460 1856 Fax: +61 (2) 9460 1857 Email: info@metminco.com 45

Metminco — Investor Presentation (September 2015) on 6ix