Slide 1: Corporate Presentation May 2016 - High Grade Zinc: Production and growth in Turkey
Corporate Presentation May 2016 High Grade Zinc: Production and growth in Turkey

Slide 2: Disclaimer
Disclaimer The information contained in this presentation is provided by Pasinex Resource Limited. (“Pasinex”) for informational purposes only and does not constitute an offer to issue or arrange to issue, or the solicitation of an offer to issue, securities of Pasinex or other financial products. T

Slide 3: Summary
Summary 50% owner of direct shipping 35% zinc ore Total JV sales of 10 million pounds in 2015 15% higher zinc price increases EBITDA 50% Increasing JV zinc sales to 15 million pounds in 2016 Resource expansion drilling underway A district play with growth expected from: Production expa

Slide 4: Introduction
Introduction Pasinex is a 50% owner of an expanding direct shipping zinc producer from the Pingagozu mine Pinargozu is a carbonate replacement deposit (CRD) near Adana, central Turkey Production grade exceeds 35% Zn Strong local 50% JV partner Akmetal A.S Direct shipping to European smelte

Slide 5: Capital Structure, Metal Price Performance
Capital Structure, Metal Price Performance Shares 101,892,309 Warrants 10,576,086 Agnt Warrants 217,200 Board, Insiders – about 70% shares Options 3,290,000 Fully Diluted 115,975,595 Relative one – year performance compared to Teck, Trevali, TSX, and TSX Materials 27.05.2016 Pasinex Resources Ltd. 5

Slide 6: Pasinex Management & Board
Pasinex Management & Board Steve Williams Vic Wells President, CEO and Chairman – Financial and legal expert was Metallurgy degree and MBA, CFO / Director for a number of Mines in Australia and Canada, junior exploration companies. 20 years with SGS in Metallurgy, Joachim Rainer Past Managing

Slide 7: Zinc outlook remains robust
Zinc outlook remains robust Mine closures occurred in 2015 Expected shortfall in mine supply from 2016 Zinc price already up about 20% in 2016 Current Zn price around 85 c US / lb 27.05.2016 Pasinex Resources Ltd. 7

Slide 8: District Zinc Potential
District Zinc Potential Turkey is very under-explored particularly for base metals. Red areas show area prospective for Zn exploration where Pasinex operates. Infrastructure is very strong in Turkey. Access to major roads, port (Mersin), major airport (Adana), HV electrical. 27.05.2016 Pasin

Slide 9: Pinargozu Mine site
Pinargozu Mine site Main city of Adana – 1.8 million Port of Mersin – 2 ½ hrs away HV power available Water available Red – JV licenses, Blue – Akmetal AS license 27.05.2016 Pasinex Resources Ltd. 9

Slide 10: Pinargozu Mine - Mineralization
Pinargozu Mine - Mineralization Blue area indicates inferred mineralization (cut off grade 25% Zn). Yellow shows underground development. Resource in predominantly zinc carbonates (oxide) Mineralized intercepts typically range from 28% Zn to 40% Zn 27.05.2016 Pasinex Resources Ltd. 10

Slide 11: Production from multiple faces
Production from multiple faces Production areas in red Production work is currently in progress along six different active faces Current production rate 60 tonnes per day of direct shipping product. Working stopes indicated by black circles 27.05.2016 Pasinex Resources Ltd. 11

Slide 12: Significant JV Production increase 2016 YTD vs 2015
Significant JV Production increase 2016 YTD vs 2015 CUMULATIVE TONNES PRODUCED at PINARGOZOU MINE 12000 10162.98 10000 8000 6000 6157.5 4000 2000 0 Jan Feb Mrz Apr Mai Jun Jul Aug Sep Okt Nov Dez 2015 2016 Cumulative production from Pinargozu mine shows significant increase in 2016 versus 2015 M

Slide 13: District Exploration potential
District Exploration potential 27.05.2016 Pasinex Resources Ltd. 13

Slide 14: Exploration Conceptual Model
Exploration Conceptual Model Carbonate replacement Zn geological model Current Pinargozu operation is high up in the “manto” Skarn opportunity possible (marble seen at Pinargozu) 27.05.2016 Pasinex Resources Ltd. 14

Slide 15: Annual Project JV EBITDA Sensitivity
Annual Project JV EBITDA Sensitivity Leverage: 15% price increase increases EBITDA 50% 33% mining increase increases EBITDA 96% Combined gives 75% increase in EBITDA Zinc Price in US $ per lb /US $ per tonne Tonnes per day Tonnes per day/year $0,60/ $0,69/ $0,79/ $0,91/ $1,05/ $1,21/ $1.322 $1.520 $

Slide 16: Pinargozu Strategy
Pinargozu Strategy Strategy Expand annual JV zinc production rate to 25 million lbs in 2017 Increase resources to over 1 million to support over ten years mining Establish district exploration opportunities, identify additional resources Status Two adits from hillside now operating. Ap

Slide 17: Zinc outlook remains robust
Zinc outlook remains robust One year price chart shows recovery Forecasts: tightening supply following closures, price risk is to the upside 27.05.2016 Pasinex Resources Ltd. 17

Slide 18: Pasinex Summary
Pasinex Summary A primary zinc production company 50% interest in Pinargozu mine, Turkey 7,700 tpa JV zinc production in 2016 Resource expansion, drills turning Large land position in a CRD zinc district Tightly held by few major shareholders 15% lift in prices gives 50% EBITDA lift. 2

Slide 19: Contact Details
Contact Details Canada Main Office Office of President, Canada Pasinex Resources Limited Tel +1 416 861 9659 Suite 1000 steve.williams@pasinex.com 36 Toronto Street Toronto, ON M5C 2C5 Tel +1 416 861 9659 General Information info@pasinex.com Ankara Office, Turkey CHF Investor Relations Koz
Source: Internet Archive copy of pasinex.com
More decks from Pasinex Resources Ltd.
Investor Presentation (November 2026)48 slides · November 2026
Corporate Update (September 2026)13 slides · September 2026
Investor Presentation (August 2026)51 slides · August 2026
Investor Presentation (June 2025)51 slides · June 2025
Investor Presentation (February 2022)26 slides · Feb 8, 2022
Investor Presentation (March 2017)23 slides · March 2017