Nortec Minerals Corp · TSXV:NVT
Nortec Minerals — Investor Presentation (November 2022)
15 slides from Nortec Minerals's investor presentation, November 2022
Slide 1: Corporate Presentation November 2022
TSX-V: NVT Corporate Presentation November 2022
Slide 2: Forward Looking Statements
2 Forward Looking Statements This presentation contains certain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from Nortec Minerals Corp’s (the “Company”) expectations and projections. The TSXV has neither approved no
Slide 3: Investment Highlights
Investment Highlights 5 DISTRICT-SCALE PROJECT STRATEGICALLY POSITIONED Excellent potential for a VMS discovery beside high- Uniquely positioned to discover and advance projects grade past producing mines WORLD CLASS EXPLORATION TEAM STRONG VALUE PROPOSITION A top-tier exploration team with multiple
Slide 4: Overview
Overview Technical Team has Proven Track Record One of newest Tier-1 Global Ni-Cu-PGE discoveries – Glencore’s 30Mt ~3.5%NiEq Norman West Project 2020 “Bernie Schnieders Discovery of the Year Award” (NWOPA) high-grade Tyko Ni-Cu-PGE Discovery Sturgeon Lake VMS Project (Zn-Cu-Ag-Au), Ontario, Canada
Slide 5: Leadership Team
Leadership Team 6 Michael Malana, CPA CMA Katie McCormack, P. Geo Interim CEO Independent Director Extensive experience in administration, accounting and reporting Director of Corporate Development and Indigenous Relations with several public companies for Impala Canada Ltd., a PGM producer Currentl
Slide 6: Why Zinc? It's a Critical Mineral needed for the Green Economy
Why Zinc? It’s a Critical Mineral needed for the Green Economy The Government of Canada and the United States have included zinc on their respective lists of minerals considered critical for sustainable economic success Critical minerals are the building blocks for the clean and digitized economy Es
Slide 7: Sturgeon Lake Volcanogenic Massive Sulphide Project ("VMS")
Sturgeon Lake Volcanogenic Massive Sulphide Project (“VMS”) Sturgeon Lake VMS – Zn-Cu-Ag-Au Located in the Wabigoon greenstone belt 9,300-hectare property Underexplored high-grade Zn-Cu-Ag-Au VMS in the past producing Sturgeon Lake VMS camp (20Mt) 7 TSXV: NVT
Slide 8: Sturgeon Lake Project – High-grade Zn-Cu-Ag-Au VMS
Sturgeon Lake Project – High-grade Zn-Cu-Ag-Au VMS Mafic Volcanics Past producing mine Nortec Minerals Felsic/Int Volcanics Cu-Zn-Ag-Au prospect / Glencore Canada 0.3%Cu / 13.04m Coincident Mag/EM Mafic Intrusives anomaly Including 3.1%Cu / 0.3m Metasediments 5.3g/t Au / 0.9m Beidelman Bay Pluton Gr
Slide 9: Potential World Class VMS Camp – Exploration Target
Potential World Class VMS Camp – Exploration Target 9 Sturgeon Lake Size: Past production - 20Mt of 9.7% (Cu+Zn+Pb) Exploration objective - 20+Mt of 9%+ (Cu+Zn+Pb) VMS Deposit with Area of Influence (AOI) Modified from (Galley et al. 2007) Sturgeon Lake: 20Mt Past Production from 2 VMS horizons ~7 u
Slide 10: Past Producing Mines and Existing Infrastructure
Past Producing Mines and Existing Infrastructure Main Mine Road Lyon Lake Mine Open Pit Creek Zone Mine Open Pit Sturgeon Mine F-Group Open Pit F-Group Waste Rock Open Pit Pile Acid Water Pipeline Main Tailings Railbed Pond Main Paved Access Road 1 km Mattabi Mine 12.6Mt @ 8.3% Zn, 0.74% Cu, 0.85% P
Slide 11: Sturgeon VMS – Ore Value and Camp History
Sturgeon VMS – Ore Value and Camp History Objective: $564 Gross Metal Near surface deposits with high-grades: 10.0% Zn, 1.0% Cu, 1.0% Pb, 150 g/t Ag, 0.5 g/t Au Value per tonne1 11 TSXV: NVT 1. Prices used: Zn - $1.38/lb, Cu - $4.20/lb, Pb - $1.07/lb, Ag - $0.77/g, Au - $57.5/g
Slide 12: Sturgeon Lake VMS – Detailed GIS Targeting Compilation
Sturgeon Lake VMS – Detailed GIS Targeting Compilation 12 TSXV: NVT
Slide 13: Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au
Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au 735-hectare property - prolific Timmins mining camp 7-kilometer trend hosting 5 historic zinc showings Historic drilling intersected Zn mineralization up to 2.3% Zn / 13.7m Located 12-kilometres North of Argo Gold’s Hurdman project 13 TSXV: NVT
Slide 14: Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au
Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au 14 Massive Sphalerite-Pyrrhotite-Pyrite from Argo Gold’s Hurdman project 2008 VTEM hosts numerous, untested and continuous anomalies Potential for similar mineralization potential at Hurdman property 12km to south 14 TSXV: NVT
Slide 15: Contact
TSX-V: NVT Contact: Brad Lazich, Principal Geologist blazich@laurentiaminerals.com Derrick Weyrauch, Non-Executive Director derrick.weyrauch@outlook.com 15
Nortec Minerals — Investor Presentation (November 2022) on 6ix