Nortec Minerals Corp · TSXV:NVT

Nortec Minerals — Investor Presentation (September 2022)

15 slides from Nortec Minerals's investor presentation, September 2022

  1. Slide 1: Corporate Presentation September 2022

    TSX-V: NVT Corporate Presentation September 2022

  2. Slide 2: Forward Looking Statements

    2 Forward Looking Statements This presentation contains certain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from Nortec Minerals Corp’s (the “Company”) expectations and projections. The TSXV has neither approved no

  3. Slide 3: Investment Highlights

    Investment Highlights 5 DISTRICT-SCALE PROJECT STRATEGICALLY POSITIONED High potential, high-grade VMS project in Ontario Uniquely positioned to discover and advance projects Beside high-grade past producing mines WORLD CLASS EXPLORATION TEAM STRONG VALUE PROPOSITION Competitive valuation Background

  4. Slide 4: Overview

    Overview Leveraging technical expertise with significant base metal discovery success One of newest Tier-1 Global Ni-Cu-PGE discoveries – Glencore’s 30Mt ~3.5%NiEq Norman West Project 2020 “Bernie Schnieders Discovery of the Year Award” (NWOPA) high-grade Tyko Ni-Cu-PGE Discovery Sturgeon Lake VMS P

  5. Slide 5: Leadership Team

    6 Leadership Team Michael Malana, CPA, CMA Interim CEO Extensive experience in administration, accounting and reporting to several public companies Currently the CFO at Patriot One Technologies Inc. (TSXV:PAT) Sara Hills, CPA, CA CFO 16+ years progressive experience, including with KGHM Int’l and Te

  6. Slide 6: Why Zinc? It's a Critical Mineral needed for the Green Economy

    Why Zinc? It’s a Critical Mineral needed for the Green Economy The Government of Canada and the United States have included Zinc on their respective lists of minerals considered critical for sustainable economic success Critical minerals are the building blocks for the clean and digitized economy Es

  7. Slide 7: Sturgeon Lake Volcanogenic Massive Sulphide Project ("VMS")

    Sturgeon Lake Volcanogenic Massive Sulphide Project (“VMS”) Sturgeon Lake VMS – Zn-Cu-Ag-Au Mattabi/Sturgeon Mines: Goliath and Goldlund Deposits: 20Mt @ 8.5% Zn, 1.1% Cu, 120g/t Ag, 0.5g/t Au ~2.6Moz AuEq (past-producing) 50 km Located in the Wabigoon greenstone belt Ontario, Canada 9,500-hectare p

  8. Slide 8: Sturgeon Lake Project – High-grade Zn-Cu-Ag-Au VMS

    Sturgeon Lake Project – High-grade Zn-Cu-Ag-Au VMS Mafic Volcanics Past producing mine Nortec Minerals Felsic/Int Volcanics Cu-Zn-Ag-Au prospect / Glencore Canada 0.3%Cu / 13.04m Coincident Mag/EM Mafic Intrusives anomaly Including 3.1%Cu / 0.3m Metasediments 5.3g/t Au / 0.9m Beidelman Bay Pluton Gr

  9. Slide 9: Potential world class VMS camp – Exploration Target

    Potential world class VMS camp – Exploration Target 9 Sturgeon Lake Target Size: Past production - 20Mt of 9.7% (Cu+Zn+Pb) Exploration target - 20+Mt of 9%+ (Cu+Zn+Pb) Laurentia ground VMS Deposit with Area of Influence (AOI) Modified from (Galley et al. 2007) Sturgeon Lake: 20Mt Past Production fro

  10. Slide 10: Past Producing Mines and Existing Infrastructure

    Past Producing Mines and Existing Infrastructure Logging and mine roads up to Location of Infrastructure Pipeline and southern and eastern portion Mattabi Mine historic Discharge of Nortec claims infrastructure – current location of power station and water treatment Main Mine facility Road Lyon Lake

  11. Slide 11: Sturgeon VMS – Ore Value and Camp History

    Sturgeon VMS – Ore Value and Camp History Target grade (Mineable Resource): $564 Gross Metal 10.0% Zn, 1.0%Cu, 1.0% Pb, 150g/t Ag, 0.5g/t Au Value per tonne High-grade, high-value polymetallic metal at shallow depths Prices used: Sep. 8 2021 : Zn - $1.38/lb, Cu - $4.20/lb, Pb - $1.07/lb, Ag - $0.77/

  12. Slide 12: Sturgeon Lake VMS – Detailed GIS Targeting Compilation

    Sturgeon Lake VMS – Detailed GIS Targeting Compilation Target Area 9: 5km Large Mag Formation Very Limited Drilling Anomalous Cu VMS Mineralization Target Area 5/6: Target Area 8: Coincident Mag/EM Formation Large Coincident Mag/EM Formation No Drilling Very Limited Drilling High-grade/Anomalous Cu

  13. Slide 13: Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au

    Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au 735-hectare property located in the prolific Timmins mining camp 7-kilometer trend hosting 5 historic zinc showings Historic drilling intersected Zn mineralization up to 2.3%Zn / 13.7m Located 12-kilometer North of Argo Gold’s Hurdman project 13 TS

  14. Slide 14: Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au

    Mattagami River: High-grade SEDEX style Zn-Pb-Ag-Au 14 Massive Sphalerite-Pyrrhotite-Pyrite from Argo Gold’s Hurdman project 2008 VTEM hosts numerous, untested and continuous anomalies Potential for similar mineralization potential at Hurdman property 12km to south 14 TSXV: NVT

  15. Slide 15: Contact: Michael Malana, Interim CEO

    TSX-V: NVT Contact: Michael Malana, Interim CEO michael.malana@gmail.com Derrick Weyrauch, Non-Executive Director derrick.weyrauch@outlook.com 15

Nortec Minerals — Investor Presentation (September 2022) on 6ix