  1. Slide 1: Tata Power on a Multi-fold Growth Path

    id a a ‘TATA ‘TATA TATA TATA TATA POWER TATA POWER TATA POWER TATA POWER TATA TATA POWER —_ LILA TATA TATA POWER TATA POWER ON A MULTI-FOLD GROWTH PATH CYPRUS oh HIMACHAL . Cl PRADESH ¢ TATA = BHUTAN TATA POWER DELHI« r a | GUJARAT § JHARKHAND ‘TATA TATA POWER WEST 4 BENGAL * MAHARASHTRA P 3 ‘TATA P

  2. Slide 2: Presentation for the Annual General Meeting

    Presentation Title Presentation for the Annual General Meeting Presentation Subtitle Anil Sardana Managing Director 24 August 2011 1

  3. Slide 3: Agenda

    Agenda  Overview of Tata Power  Sustainability Strategy  Fuel De-risking Strategy  Generation Business  Projects in pipeline  Transmission & Distribution Business  Other Businesses  Financials  Industry Overview 2

  4. Slide 4: Company Overview

    <p TATA Company Overview

  5. Slide 5: Tata Power is the fourth largest company by market capitalisation in the Tata Group

    Tata Power is the fourth largest company (by market capitalisation) in the Tata Group Promoter Revenue by business segments Listed Companies Mkt Cap ($ bn)2 Shareholding (%)1 Tata Consultancy Services 51.8 74.1 3% 4% 4% Tata Motors 14.4 34.8 16% Tata Steel 12.4 30.6 Tata Power 6.6 31.8 Revenue FY 20

  6. Slide 6: Tata Power is emerging as a group of businesses in the Energy sector

    Tata Power is now emerging as a group of businesses in the Energy sector, covering the entire value chain Trombay Hydro Jojobera Belgaum Haldia Wind Farm s Generation Solar SPV CGPL (Mundra UMPP) 100% Maithon 74% IEL 74% Dagachhu 26% Power OTP Geothermal 50% Business Mumbai Transmission Powerlinks 5

  7. Slide 7: Foraying into selected global markets to add value

    While your Company largely been India focussed, it is now foraying into selected global markets to add value India and neighbouring Nepal Hydro SAARC opportunity Project Bhutan Hydro Pacific and Africa and Project Far East Middle East India Power Business Indonesia Coal Mines Australia Technical Inv

  8. Slide 8: Core strength in key areas of the Value Chain

    Tata Power today has a developed core strength in key areas of the relevant Value Chain Fuel and logistics Generation Transmission Distribution New business vistas 3,176 MW of Mumbai Transmission utilizing customer 30% equity interest in operational capacity network interface management Indonesian c

  9. Slide 9: Stronger Mumbai play to wider presence across the country

    In India, your Company has evolved with stronger Mumbai play, to wider presence across the country Power generation capacity (MW) Operational Thermal 2,974 MW Hydro 447 MW Wind 283 MW Dugar Hydro Solar 3 MW Transmission Powerlinks Distribution NDPL DHPC Bhutan Under Execution Thermal 4,565 MW Hydro

  10. Slide 10: Commitment to sustainability

    Commitment to sustainability

  11. Slide 11: Sustainability as a part of 'Leadership with Care'

    Tata Power has undertaken a number of initiatives on Sustainability as a part of ‘Leadership with Care’ Care for environment Care for community Care for customers Care for people Growth through renewables, Principles of community Energy clubs Safety and health clean / green energy engagement Custome

  12. Slide 12: Greenolution

    Greenolution intent to lead the efforts towards a greener world not just internally but also externally through education, engagement and ensuring participation. Key programs that run under Greenolution: Implementation of 100% recycled paper usage in office Tree plantation at all our plants and site

  13. Slide 13: Community initiatives: Project Sujaan and others

    Tata Power Introduces „Project Sujaan‟ in Gujarat • -in-the- Hiwell), a JV Tata Power‟s Unique Community Initiative Beats the Heat for of NIIT Ltd. and International Finance Corporation (IFC) Nirsa Maithon area • • •Provides drinking and domestic water supply through tankers around • The programme w

  14. Slide 14: Fuel de-risking strategy

    <p TATA Fuel de-risking strategy

  15. Slide 15: Guarding against risks on fuel supply

    To guard against risks on fuel supply, your Company has Tata Power Company Ltd. (India) 100% 100% 33% 40% Bhivpuri Bhira Mandakini Coal Tubed Coal Investments Ltd. Investments Ltd. Company Ltd. Mines Ltd. (Cyprus) (Mauritius) 30% 30% 30% Indocoal KPC Arutmin Mandakini Block Tubed Block (Cayman Islan

  16. Slide 16: Captive Coal Blocks - Mandakini

    Captive Coal Blocks - Mandakini Project Outline:  7.5 MTPA (jointly allotted with Jindal Photo Film and Monnet Ispat & Energy - each JV Partner having a share of 2.5 MTPA) at Dist. Angul, Orissa  Project cost expected to be ~Rs. 6 bn  Coal mined planned to be utilised in large capacity in Orissa

  17. Slide 17: Captive Coal Blocks - Tubed

    Captive Coal Blocks - Tubed Project Outline:  6 MTPA [Jointly allocated with Hindalco at Latehar, Jharkhand Hindalco (60%) 3.6 MTPA & Tata Power (40%) 2.4 MTPA]  Project cost expected to be ~Rs. 5.6 bn  Coal mined planned to be utilised in large project in Jharkhand Project Status:  Mining plan

  18. Slide 18: Generation Business

    <p TATA Generation Business

  19. Slide 19: Existing Presence across business models

    Existing Presence across business models Business Structure / Model Capacity (MW) % of overall capacity Returns Fixed return Regulated returns 1,927 61% on equity Regulated tariff mechanism Fixed tariff + 277 9% (renewables) PLF driven PPA driven Captive power plant 668 21% (14-19%) Merchant 200 6%

  20. Slide 20: Mumbai Regulated Operations

    Mumbai Regulated Operations Generation (MU) Thermal 10,200 10,002 Unit Capacity Fuel 10,000 9,845 9,800 9,660 Unit 4 150 MW Oil & Gas 9,600 Unit 5 500 MW Coal 9,400 9,200 Unit 6 500 MW Oil & Gas 9,000 8,876 Unit 7 180 MW Gas 8,800 8,600 Unit 8 150 MW Coal 8,400 8,200 Total 1480 MW FY08 FY09 FY10 FY1

  21. Slide 21: Merchant Capacity

    Merchant Capacity Haldia 250 5.41 6 Capacity  100 MW 200 5.06 5 4.8 Fuel Type  Production gases (Hot flue gases 4 150 3.61 3.38 from Hoogly Metcoke) 3 Customer  PPA with Tata Power Trading 100 2.11 2 50 Model  Merchant 1 0 0 * Remaining 20 MW in Haldia under PPA to WBSEDCL; MUs sold Realization

  22. Slide 22: Jojobera & Belgaum

    Jojobera & Belgaum Generation (MU) Jojobera 3,100 3,078 3,009 3,002 Capacity  428 MW 3,000  Unit 1: 67.5 MW, Unit 2-4: 120 MW each 2,900 2,862 Fuel Type  Domestic Coal 2,800 Customer  Tata Steel 2,700  20 year PPA till 2017 FY08 FY09 FY10 FY11 Model  Fuel and Interest are a pass through PLF (%

  23. Slide 23: Industrial Energy Limited (IEL)

    Industrial Energy Limited (IEL) IEL PH6  120 MW, Aug 2009 (PH-6) Capacity /COD Fuel Type  Production gas (Furnace / Coke Oven Gases of Tata Steel) Customer  Tata Steel Model  Fuel and Interest costs are a pass through, other expenses on normative basis Generation  FY10 - 563 MU, FY11 - 738 MU I

  24. Slide 24: Significant presence in Renewables

    Significant presence in ‘Renewables’ Wind  283 MW Generation (MU) Capacity 400 347 320 Customer  Maharashtra: TPC-D 100 MW 300 3rd Party 21 MW 177 200  Karnataka: BESCOM 50 MW 127 100  Gujarat: GUVNL 50 MW  Tamilnadu : TANGEDCO 49.5 MW 0 FY08 FY09 FY10 FY11 PLF (%) 20 19 19 20 Tariff FY11 Tarif

  25. Slide 25: Projects

    Projects

  26. Slide 26: Significantly adding capacity in FY12 and FY13

    Your Company is moving to significantly add to its capacity in FY12 and FY13 2183 2303 2348 2364 2785 2977 3127 6000 8527 9000 8000 7000 6000 CGPL 2400 MW 5000 DHPC 126 MW 4000 3000 Maithon 1050 MW 2000 CGPL 1600 MW Wind 100 MW 1000 Lodhivali 40 MW Mithapur 25 MW Mulshi 10 MW 0 FY05 FY06 FY07 FY08 F

  27. Slide 27: Vision – 25,000 MW by 2017

    Vision – 25,000 MW by 2017 ~17,000 MW 8,527 MW Projects in advanced 3,182 MW stages of development Mulshi 10 Tata Motors Thermal 7,450 Unit 4 150 Rooftop 0.5 Renewables 1,000 30,000 Vision Gap - Unit 5 500 Poolavadi 50 Unit 6 500 TOTAL 8,450 8,000 MW* Agaswadi 43.5 Unit 7 180 Mithapur 25,000 Unit 8

  28. Slide 28: Addressing the change in law in Indonesia

    Your Company is pursuing various options to address the challenge posed by change in law in Indonesia  To de-risk the fuel, your Company had entered into a Coal Supply Agreement (CSA) with Indonesian Coal Mines for a substantial portion of fuel requirement  Tata Power had quoted tariff and got coa

  29. Slide 29: Transmission and Distribution Business

    Transmission and Distribution Business

  30. Slide 30: Powerlinks Transmission Ltd.

    Powerlinks Transmission Ltd.  -state transmission project on a BOOT basis  Implemented through a JV between Tata Power (51%) and Powergrid (49%)  Powerlinks Transmission Limited has been formed primarily to evacuate power from the Tala Hydro Project in Bhutan and to carry surplus electricity from

  31. Slide 31: North Delhi Power Limited (NDPL)

    North Delhi Power Limited (NDPL) PAT (in INR mm.)  North Delhi Power Limited (NDPL) is a 51:49 joint venture between Tata Power Company and 4000 the Government of NCT of Delhi 3000 2000 1000 Customer base  >1 million customers with ~7000 MUs of 0 consumption FY07 FY08 FY09 FY10 FY11 FY11 Revenues

  32. Slide 32: Mumbai Transmission

    Mumbai Transmission  Tata Power (TPC-T) is amongst the 3 Transmission Licensees that transmits power into Mumbai  The TPC-T transmission network comprises of about 1,100 CKm of 220 kV / 110 kV lines and 17 high-voltage receiving stations  Two Extra High Voltage (EHV) lines capacity augmented (170

  33. Slide 33: Mumbai Distribution and Retail Customer Business

    Mumbai Distribution and Retail Customer Business  Among 3 private distribution licensees viz. Tata Power, BEST & R-Infra in Mumbai  After MERC allowed changeover of customers from R-Infra to Tata Power in Oct 2009, TPC-D has added over 143,000 changeover customers to build about 200,000 retail cus

  34. Slide 34: Other Businesses

    <p TATA Other Businesses

  35. Slide 35: Other Businesses

    Other Businesses  Trust Energy Resources Pte Ltd incorporated in Singapore for owning ships to meet shipping requirements and trading in fuels, Energy Eastern Pte Ltd incorporated for chartering of ships  Shipping requirement for Mundra - 6 vessels going up to 8 vessels by FY13 Shipping Subsidiari

  36. Slide 36: Detailed Financial Statements

    Detailed Financial Statements

  37. Slide 37: Standalone Financials

    Standalone Financials Figures in ` Crores FY11 FY10 Operating Income 6,918 7,098 Operating Expenditure (5,328) (5,220) Operating Profit 1,591 1,879 Interest & Finance Charges (462) (423) Depreciation (510) (478) Other Income 494 282 Profit Before Tax 1,112 1,259 Provision for Taxes (171) (321) Profi

  38. Slide 38: Consolidated Financials

    Consolidated Financials Figures in ` Crores FY11 FY10 Operating Income 19,451 18,986 Operating Expenditure (14,854) (15,133) Operating Profit 4,596 3,853 Interest & Finance Charges (868) (782) Depreciation / Impairment (981) (893) Other Income 411 589 Profit Before Tax 3,157 2,767 Provision for Taxe

  39. Slide 39: Q1 FY12 Performance - Standalone

    Q1 FY12 Performance - Standalone Figures in ` Crores Q1 FY12 Q1 FY11 Operating Income 1,921 1,868 Operating Expenditure (1,476) (1,412) Operating Profit 445 456 Interest & Finance Charges (130) (85) Depreciation (133) (127) Other Income 248 128 Profit Before Tax 430 372 Provision for Taxes (148) (10

  40. Slide 40: Q1 FY12 Performance - Consolidated

    Q1 FY12 Performance - Consolidated Figures in ` Crores Q1 FY12 Q1 FY11 Operating Income 5,825 5,185 Operating Expenditure (4,354) (4,040) Operating Profit 1,470 1,145 Interest & Finance Charges (310) (328) Depreciation / Impairment (272) (235) Other Income 124 (61) Profit Before Tax 1,013 643 Provis

  41. Slide 41: Industry Overview

    <p TATA Industry Overview

  42. Slide 42: Favorable Industry Dynamics

    Favorable Industry Dynamics High GDP growth in India, power shortages, rising per-capita consumption and projected capacity addition results in a large potential for growth in the power sector India suffers from an energy deficit Low per capita consumption of electricity (2008) 900 Canada 17,053 US

  43. Slide 43: Favorable Industry Dynamics: coal deficit in India

    Favorable Industry Dynamics India currently has and is projected to have a deficit in coal with the shortfall being filled by imported coal Current installed capacity – large requirement Coal usage by sector in India for coal Others Fertilizer 16% Diesel Cement 1% Renewable 1% 2% Nuclear 10% Gas 16%