Slide 1: 5 Year Strategy Presentation
5 YEAR STRATEGY PRESENTATION APRIL 2022 afritinmining.com AIM: ATM
Slide 2: Disclaimer
DISCLAIMER These presentation slides (the “Slides”) do not comprise an admission document, persons to whom distribution may otherwise lawfully be made. Any investment, listing particulars or a prospectus relating to AfriTin Mining Limited (“the Company”) investment activity or controlled activity to
Slide 3: About Us
ABOUT US afritinmining.com
Slide 4: Our Strategic Principles
AFRITIN MINING | CORPORATE PRESENTATION 2022 OUR STRATEGIC PRINCIPLES Scalability Target deposits with scalable potential Diversification Diversify revenue streams with multiple metals Tech Metals Target emerging technology metals Low-Cost Curve Production costs in the lower quartile of global cost
Slide 5: Our Strategic Pillars
AFRITIN MINING | CORPORATE PRESENTATION 2022 OUR STRATEGIC PILLARS Unlock ESG Operational Project Exploration Commitments Excellence Development Become leaders within our Optimise processing Expand resources on Expand our sites and peer group driving ESG infrastructure at Uis, existing tenements and
Slide 6: AfriTin's Namibian Activities
AFRITIN MINING | CORPORATE PRESENTATION 2022 AFRITIN’S NAMIBIAN ACTIVITIES EPL 5445 1 Mine in Production ML 134 3 Near-mine Development Projects ML 129 4 Tech Metals for targeted production 6
Slide 7: Highlights
AFRITIN MINING | CORPORATE PRESENTATION 2022 HIGHLIGHTS Activities on selected Namibian assets Uis Mining Licence 134 Commodities:Tin (Sn), Lithium (Li) and Tantalum (Ta) • Current Phase 1 expansion • Li and Ta by-product test facility • Ore sorting test facility • Phase 2 feasibility studies • Expl
Slide 8: Our Strategic Roadmap
AFRITIN MINING | CORPORATE PRESENTATION 2022 OUR STRATEGIC ROADMAP Future Growth NPV $? Uis Phase 2 2022 - 2025 Enlarge footprint in Namibia by expanding existing operations and adding mining locations • Namibia NPV $TBR • Other investor friendly African Brandberg West mining jurisdictions & B1C1 Ph
Slide 9: Strategic Workstreams
STRATEGIC WORKSTREAMS AFRITIN CORPORATE PRESENTATION 9
Slide 10: Uis Tin Mine Overview
AFRITIN MINING | CORPORATE PRESENTATION 2022 UIS TIN MINE The Uis Tin Mine, previously the largest hard-rock tin mine in the world is AfriTin’s flagship asset. Our OVERVIEW world-class team successfully demonstrated their expertise, advancing the project from exploration to commissioning in 3 years.
Slide 11: Uis Reserves and Resources
AFRITIN MINING | CORPORATE PRESENTATION 2022 UIS RESERVES AND RESOURCES K-Cluster Material Mined to Date P-Cluster Proximal pegmatite clusters modelled with historical drill V1V2 Orebody hole information. (Current Resource) Confirmatory drill programme design in progress. V-Cluster (excl. V1V2) Reso
Slide 12: Uis Phase Expansion
AFRITIN MINING | CORPORATE PRESENTATION 2022 UIS PHASE 1 EXPANSION 01 Fully funded via lending facility with Standard Bank Namibia Ltd 02 Modular expansion Leveraging existing bulk infrastructure services and 03 installed processing configurations Increase tin concentrate production from 720 tpa to
Slide 13: Current Workstreams
AFRITIN MINING | CORPORATE PRESENTATION 2022 CURRENT WORKSTREAMS Circuit upgraded to result in a 76% increase in tin 01 concentrate throughput XRT Ore sorter to increase feed grade by up to 2 – 02 4x with full-scale commissioning expected in 2023 Lithium and tantalum pilot test work facility 03 cons
Slide 14: Uis Phase 2 Expansion
AFRITIN MINING | CORPORATE PRESENTATION 2022 UIS PHASE 2 EXPANSION Phase 2 feasibility studies for 01 larger-scale 10 Mtpa ROM operation underway; 16k tpa of tin concentrate 02 480k tpa of lithium concentrate 320 tpa of tantalum concentrate 03 Preliminary Economic Assessment due in Q2 2022 14
Slide 15: B1C1
AFRITIN MINING | CORPORATE PRESENTATION 2022 B1C1 Highly prospective, polymetallic licence Positive identification of spodumene, a 01 primary lithium mineral within the B1 and C1 pegmatites 02 Known tin and tantalum mineralisation 03 Confirmation of historical drill database 04 Target JORC (2012) co
Slide 16: Brandberg West
AFRITIN MINING | CORPORATE PRESENTATION 2022 BRANDBERG WEST Historic open pit tin and tungsten mine, operated by Goldfields. 01 Polymetallic deposit (tin, tungsten, copper, gold) 03 Confirmatory mobilised drill programme being Well suited to pre-concentration via 02 ore sorting, followed by gravity
Slide 17: Strong ESG
AFRITIN MINING | CORPORATE PRESENTATION 2022 STRONG ESG Metal producer with Zero Chemical Tailings 01 waste 02 72% Purchased electricity from grid is sourced from renewable energy sources 03 Strong Social Licence to Operate Annual Carbon Emissions <9% of Equator 04 Principles Annual threshold 05 Ali
Slide 18: Upcoming News Flow
UPCOMING NEWS FLOW AFRITIN MINING | CORPORATE PRESENTATION 2022 01 AfriTin ESG Strategy 02 Lithium Test work Results 03 Ore Sorting Test Work Results Lithium Development and Marketing 04 Strategy 05 Exploration Drilling Results 06 Phase 2 Feasibility Studies 18
Slide 19: Registered Office and Contact Us
REGISTERED OFFICE PO Box 282 Oak House Hirzel Street, St Peter Port Guernsey GY1 3RH 2 Park Street 150 Cheapside Investor Relations – UK REPRESENTATIVE OFFICE |SOUTH AFRICA London London 1 Cornhill Illovo Edge Office Park London Building 3, 2nd Floor, W1K 2HX EC2V 6ET 5 Harries Road, Illovo United K