Goldquest Mining Corp. · TSXV:GQC

Goldquest Mining — Investor Presentation (March 2024)

23 slides from Goldquest Mining's investor presentation, March 2024

  1. Slide 1: Romero Project, San Juan, Dominican Republic

    ROMERO PROJECT SAN JUAN, DOMINICAN REPUBLIC An Emerging Mine Developer with Exploration Upside March 2024

  2. Slide 2: Forward-looking statements

    Statements contained in this presentation that are not historical facts are forward-looking information that involves known and unknown risks and uncertainties. Forward- looking statements in this presentation include, but are not limited to, statements with respect to the pre-feasibility study for

  3. Slide 3: Developing – Romero Discovery / Accelerating News-flow

    Developing – Romero Discovery  Multi-million oz. Au/Cu discovery in 2012  Latest PFS Nov. 2016: 28% IRR, NPV (5%) US$202 million  Exploitation License approved by Mines Ministry Jan 2018  Awaiting Presidential Approval  EIA/BFS to follow Approval Exploring – Discovery in 2017  The 50-km long b

  4. Slide 4: The Dominican Republic

    The Dominican Republic Canada Romero Project Tireo USA Concessions Puerto Plata Dominican Republic Falcondo Pueblo Viejo Mine Mine  Strong relationship with San Juan the government and Santo Domingo community  DR is the largest and source www.barrack.com Cerro de Maimon Mine most stable economy in

  5. Slide 5: Veteran Team with DR experience

    Veteran Team with DR experience Luis Santana CEO • Former CEO Cardinal Namdini – Ghana • Former CEO Veladero – Argentina • Former Ops Mgr Barrick PV – Felix Mercedes Dom. Rep. Country Manager • Former Director of Mining & Petroleum Chamber in the Paul Robertson, CA,CPA DR CFO JP LeBlanc • Former CFO

  6. Slide 6: Technical & Financial Expertise

    Technical & Financial Expertise Bill Fisher, P.Geo Julio Espaillat, M.Eng Non-Executive Chairman Director • Former CEO Globestar • Retired as full-time CEO Q3 ‘17 • Chairman Aurelian • Former Country Manager • VP Exploration of Boliden Globestar Florian Siegfried, MBA Patrick Michaels Director Direc

  7. Slide 7: DR - Push to improve our social & community relations

    DR - Push to improve our social & community relations - Permanent community outreach with a local team in San Juan - Sponsoring the development plan for eco- tourism of the province. - Reforestation program for the San Juan river catchment (67K trees already planted). - Working on the incorporation

  8. Slide 8: Prefeasibility Study

    Prefeasibility Study (to be upgraded in BFS) NPV*5% IRR* AISC* PAYBACK $203M 28% $595/OZ. 2.5YRS AFTER TAX AuEq.** LTP-94 158.6m to 160.0m 288.6 g/t Gold 5.6% Copper  Currently in the permitting phase – to achieve * Net Present Value (“NPV”), Internal Rate of Return (“IRR”), All-In Exploitation Lic

  9. Slide 9: PFS: Responsible Mine Design

    PFS: Responsible Mine Design Minimal Surface Impact  Small surface footprint over underground mine, thus minimal affect on landscape Return Wasterock Underground  Wasterock will be returned underground as backfill No use of Cyanide  A gold/copper concentrate product will be shipped to internation

  10. Slide 10: 2016 PFS Highlights

    2016 PFS Highlights Low Capex, High IRR, Scalable Deposit After-Tax NPV & IRR Sensitivity to Gold Price PFS Summary Results At US$1300 Au / US$2.50.lb Cu After Tax NPV5% After Tax IRR Start-Up CAPEX $158M $350 35% Sustaining CAPEX $92M $300 30% After Tax NPV5% (US$M) Throughput 2,800 tpd $250 25% Af

  11. Slide 11: Gold-Copper Starter Mine

    Gold-Copper Starter Mine only considers 35% of current M&I Resource Surface Portal Ventilation Access Ramp View Looking North Production Ramp  2,800 tpd – 75% Longhole  Large Stopes (up to 20m x 20m x 50m)  Options to expand mine as metal prices rise Remaining Mineral Resources www.goldquestcorp.

  12. Slide 12: Gold Equivalent Ounces

    NPV5% IRR AISC PAYBACK AFTER TAX $595/OZ. 2.5 The Gold/Copper Concentrate $203M 28% AuEq. YEARS Gold Equiv. Payable Oz. Starter Mine (35% of resource only) 180 GOAL: maintain or exceed 150,000 oz per year (Remaining Resource = Potential) 160 153,600 Gold Equivalent Ounces 140 136,800 135,600 124,800

  13. Slide 13: All in Sustaining Costs (AISC)

    NPV6% IRR AISC* PAYBACK $203M AFTER $595/OZ. 2.5 All in Sustaining Costs (AISC) TAXES AuEq. YEARS 28% $1,400 LOM LOM ($/tonne) ($/oz.) $1,200 Mining $27.7 $222.4 Gross Processing $11.6 $93.1 $1,000 Margin Tailings Management $1.3 $10.3 $705 Gold Price $800 G & A (Site) $5.4 $43.8 $600 Total Cash Cos

  14. Slide 14: Permitting a Mine in the Dominican Republic

    DEVELOPMENT Permitting a Mine in the Dominican Republic Exploration Concession Application Process Mineral Exploration & Environmental 2005 – Ore Deposit Discovery License Application Process 2012 Sequential and time Mine intensive process of gathering and testing data to Construction find economic

  15. Slide 15: Romero Project Exploration Focus

    Romero Project Exploration Focus www.goldquestcorp.com | 15

  16. Slide 16: The “String of Pearls”

    The “String of Pearls” Romero: 10.4 g/t - 234.8m Grab Samples Gold (g/t) 2.0 – 167.5 (201) BDL – 2.0 (3272) Las Tomates: 4.7 g/t - 6.8 m Tireo Land Package Perimeter Hydrothermal Alteration Romero South: 10.75 g/t - 28.5 m Ongoing Ex;loration Program Previously Reported Drilling Imperial: 8.5 g/t -

  17. Slide 17: Exploring the Tireo Belt

    Exploring the Tireo Belt Romero Deposit Romero South Deposit  Targets occur along the mineralized trend hosting the Cachimbo Discovery and the Romero Deposits  These deposits occur in clusters along plate IP Chargeability (mV/V) boundaries – we are on the Atlantic/Caribbean boundary  Target gener

  18. Slide 18: Romero style mineralization - Open in all directions

    Romero style mineralization - Open in all directions Surface sample: 168 g/t gold ?? 5 m @ 14 g/t gold, 12% zinc, 74 g/t silver 1% copper 21m @ 7.9 g/t gold 100 metres 1.8% zinc, 40 g/t silver .17% copper ?? www.goldquestcorp.com | 18

  19. Slide 19: Gold-Rich VMS Clan

    Gold-Rich VMS Clan 167.5 g/t Au at surface Au Zn-Au Au Au Cachimbo Zn-Au Discovery Cu-Au Romero Project Cu-Au Cu-Au www.goldquestcorp.com | 19 Image modified from Dubé, B; Gosselin, P; Mercier-Langevin, P; Hannington, M; Galley, 2007. Mineral deposits of Canada: a synthesis of major deposit-types, d

  20. Slide 20: Share Information and Management

    Market Capitalization** ~C$20.7 M Shares Outstanding 259,442,384 Basic Shares Outstanding 282,911,884 Fully Diluted Cash* +10.7 M Stock Price** C$0.08 * Cash (Actual) as of December 31st, 2023 **As of October 4th, 2023 close Management Contact Info: Share Information Luis Santana CEO Paul Robertson

  21. Slide 21: Mineral Reserve & Resource Estimate

    Mineral Reserve & Resource Estimate Romero Mineral Reserve Estimate Mine Reserves Tonnes Au Ag Cu Au Eq(1) (Cutoff $70 (g/t) (oz) (g/t) (oz) (%) (M lb) (g/t) (oz) NSR)(2) Total Probable 7,031,000 3.72 840,000 4.33 980,000 0.88 136 4.9 1,117,000 (1) Au equivalent metal prices: Au $1,300/oz Cu $2.50/l

  22. Slide 22: Upon receipt of Exploitation License

    Upon receipt of Exploitation License 1. ESIA – follow DR Ministry of Environment Terms of Reference 1. Mine, Road, Power line, Port 2. Develop existing Plan – simple, benign, “starter mine” 7 Mt Reserve 1. Project enhancement options 2. Examine upgrading options for 1. Resource base = 23 Mt resource

  23. Slide 23: GoldQuest’s CSR Commitment

    GoldQuest’s CSR Commitment  The inclusion of communities in our activities The Planet  Implementation of sustainable • Environmental environmental practices Stewardship  Active participation in the sustainable economic development of the area  Commitment to the safety and health of CSR employees

GoldQuest Mining — Investor Presentation (March 2024) on 6ix