Bravo Mining Corp. · TSXV:BRVO

Bravo Mining — Investor Presentation (January 2025)

39 slides from Bravo Mining's investor presentation, Jan 24, 2025

  1. Slide 1: LUANGA | Critical Metals for Clean Air

    TSXV BRVO OTCQX BRVMF LUANGA | Critical Metals for Clean Air January 2025 Corporate Presentation Multi-Million Ounce Tier 1 PGM + Au + Ni Deposit & A member of High-Grade IOCG-Style Massive Sulphide Copper-Gold Mineralization Discovery in the World Class Carajás Mineral District, Brazil PALLADIUM PL

  2. Slide 2: Forward-Looking Statement

    Forward-Looking Statement This presentation contains “forward-looking information” (also referred to herein as “forward-looking statements”) not limited to, those in respect of: liabilities inherent in the Company’s operations and mineral projects in the under the provisions of applicable Canadian s

  3. Slide 3: Mineral Resource Estimate ("MRE") Technical Disclosure

    Mineral Resource Estimate (“MRE”) Technical Disclosure All scientific and technical information relating to the Luanga Project contained in this presentation is derived from the Technical Report dated October 22, 2023 titled “Independent Technical Report for the Luanga PGE+Au+Ni Project, Pará State,

  4. Slide 4: Investment Thesis

    INVESTMENT THESIS Multi-Million Ounce Tier 1 PGE+Au+Ni Deposit & High-Grade IOCG-Style Massive Sulphide Copper-Gold Mineralization Discovery in the right place, with the right people and the right strategy Multi-Million-Ounce PGM+Au+Ni Located in the world-class Carajás deposit + High-Grade IOCG Pro

  5. Slide 5: Bravo Platform for Growth

    BRAVO PLATFORM FOR GROWTH Multi-Million Ounces PGM+Au+Ni Deposit outside of South Africa and Russia High-Grade IOCG-Style Massive Sulphide Copper-Gold Mineralization Discovery LUANGA PROJECT PLACE PGM+Au+Ni Deposit + Cu-Au Prospect Low Economic Hurdle 100% owned subject to 1% royalty to Access and e

  6. Slide 6: Strong Balance Sheet, Clean Capital Structure

    STRONG BALANCE SHEET, CLEAN CAPITAL STRUCTURE No Warrants Issued | Supported by renowned resource investors TSXV BRVO | OTCQX BRVMF BRAVO SHARE OWNERSHIP First Day of Trading (IPO price @ $1.75) Aug 30, 2022 Share Price (as of January 24, 2025) C$2.25 55.8% 9.8% 52 Week High/Low C$4.40/ C$1.47 BOARD

  7. Slide 7: Location Advantage

    LOCATION ADVANTAGE Low economic hurdle due to abundant infrastructure | Simple land status | Favourable fiscal regime INFRASTRUCTURE Cu-Au Occurrences Air Rail Road Power PARAUAPEBAS: MINING CAPITAL OF PARÁ | Cu-Au (?) Regional centre for mining people, services & logistics EXISTING ESG ATTRIBUTES1

  8. Slide 8: Strategy | Upgrade & Grow Resource + Ni and Cu-Au IOCG

    STRATEGY | Upgrade & Grow Resource + Ni and Cu-Au IOCG Prospectivity Substantially De-Risked | Maintain development optionality and flexibility CONFIRM, UPGRADE & GROW RESOURCE ESTIMATE + FOLLOW UP IOCG DISCOVERY RE-ASSAY, PHASE 1 MAIDEN MRE PGM+Ni DRILLING IOCG DISCOVERY FOLLOW UP Completed Complet

  9. Slide 9: Multi-Million Ounces PGM+Au+Ni Deposit outside of South Africa and Russia

    Multi-Million Ounces PGM+Au+Ni Deposit outside of South Africa and Russia 4.1Moz PdEq | 73Mt at 1.75 g/t PdEq - Indicated 5.7Moz PdEq | 118Mt at 1.50 g/t PdEq - Inferred …and growing

  10. Slide 10: Drilling to Date

    DRILLING TO DATE Bravo + VALE COMPANY DRILL HOLES METRES DRILLED (as of Dec 20, 2024) VALE 252 50,353 Bravo – 2022 135 23,515 Bravo – 2023 116 30,892 Bravo – 2024 94 19,269 Total Bravo 345 73,676 Bravo + VALE 597 124,029 The table above includes the 8 metallurgical holes 10 TSXV BRVO | OTCQX BRVMF

  11. Slide 11: Luanga – An Unusually Large Mineralized System

    LUANGA – An Unusually Large Mineralized System ~8.1 km long mineralized envelope | Phase I and Historical drilling only down to ~150-200m Deeper drilling on Phase II and III intersected mineralization down to at least ~450m Avg. depth of historic and Phase 1 drilling 1 BRAVO CAMP 1 North Sector 2.8

  12. Slide 12: Maiden MRE Summary (at a 0.50 g/t PdEq cut-off grade)

    Maiden MRE Summary (at a 0.50 g/t PdEq cut-off grade)* Delineated to an average depth of 200m | Mineralization continues to depths of at least ~450m Indicated: 4.1Moz PdEq | 73Mt at 1.75 g/t PdEq 38% Indicated and 62% Inferred Indicated • Includes 4.6Mt at 1.43 g/t PdEq of Oxide material Inferred MR

  13. Slide 13: MRE Growth Potential | Fresh Rock – Central Sector

    MRE GROWTH POTENTIAL | Fresh Rock – Central Sector Mineralization is open at depth along the entire 8.1km of strike Multiple thick high grade mineralized zones at North Sector MRE delineated to an average depth of 200m while drilling has demonstrated that mineralization continues to depths of at lea

  14. Slide 14: MRE Growth Potential | Oxide

    MRE GROWTH POTENTIAL | Oxide TRENCHES METRES Potential to increase oxide inventory As of December 20, 2024 46 9,066 Potential for growth and higher grades of oxide mineralization likely due to supergene enrichment 9,066m executed in 2024 to cover the entire strike length of the Luanga deposit Trench

  15. Slide 15: Luanga Metallurgy – De-risked by Vale, Improved by Bravo

    LUANGA METALLURGY – De-risked by Vale, Improved by Bravo Luanga material amenable to producing saleable flotation concentrates BRAVO TESTWORK Sulphide: Pt 88%, Pd 80%, Rh 59%, Au 56%, Ni 50% Metallurgical recoveries used in the MRE* Oxide: Au 94%, Pd 73%, Rh 61%, Pt 24%. *See Technical Report’s Chap

  16. Slide 16: High-Grade IOCG-Style Massive Sulphide Copper-Gold Discovery

    High-Grade IOCG-Style Massive Sulphide Copper-Gold Discovery 11.48m at 14.3% Cu, 3.3g/t Au including 2.9m at 22.9% Cu, 3.6g/t Au 8.75m at 9.48% Cu and 2.1g/t Au

  17. Slide 17: Luanga Located Within Trend of Major IOCG Deposits

    Luanga Located Within Trend of Major IOCG Deposits IOCG Deposits in the Carajás Region 17 TSXV BRVO | OTCQX BRVMF

  18. Slide 18: Ni and Cu Sulphide Prospectivity: 17 Priority EM Drill Targets

    Ni and Cu Sulphide Prospectivity: 17 Priority EM Drill Targets Massive Nickel Sulphide Discovery Prompted Detailed HeliTEM Program, BHEM and Interpretation AUGUST 3, 2022 - Bravo Intercepts Massive Sulphide Mineralization at its Luanga (PGM + Au + Ni) Project 1st DDH22LU47: 11m @4.24g/t PGM+2.04% Ni

  19. Slide 19: EM Priority Targets Selection

    EM PRIORITY TARGETS SELECTION First interpretation selected 54 targets False conductors associated with power lines and conductors 100% outside the mineral property were removed 36 EM targets remained • 17 1st priority targets • 19 2nd priority targets 13 Targets were drill-tested in 2023 and have B

  20. Slide 20: Bravo Intersects High-Grade IOCG-Style Massive Sulphide Copper-Gold Mineralization

    Bravo Intersects High-Grade IOCG-Style Massive Sulphide Copper-Gold Mineralization in Drill Testing of Luanga EM targets | May 2024 11.48m at 14.3% Cu, 3.3g/t Au including 2.9m at 22.9% Cu, 3.6g/t Au – Discovery Hole 8.75m at 9.48% Cu and 2.1g/t Au – 2nd Hole 50m east and along strike High-grade cop

  21. Slide 21: T5 - DDH2405T002 | 11.48m at 14.3% Cu and 3.3g/t Au

    T5 - DDH2405T002 | 11.48m at 14.3% Cu and 3.3g/t Au First Assay Result From First Drilled EM Anomaly Post HeliTEM and Bore-hole Electromagnetic (“BHEM”) FROM (m) TO (m) LENGTH (m) Cu % Au g/t 165.62 166.60 0.98 11.04 5.22 166.60 167.50 0.90 12.61 1.45 167.50 168.50 1.00 23.62 6.39 168.50 169.45 0.95

  22. Slide 22: T5 - DDH2405T004 | 8.75m at 9.48% Cu and 2.1g/t Au

    T5 - DDH2405T004 | 8.75m at 9.48% Cu and 2.1g/t Au 2nd Drill Hole - Completed 50m to the east of DDH2405T002 Supports the IOCG-style mineralization intersected in DDH2405T002 to the west and appears to confirm the continuity of the sulphide mineralization. Remains open along strike and up and down d

  23. Slide 23: Best Cu% Grade Intercept Globally

    Best Cu% Grade Intercept Globally DDH2405T002 – Among Top #5 Rank Cu% Grade Intercept over the Last 5 Years 2024 YTD | 287 Announcements with Cu% Intercept 2023 | 881 Announcements with Cu% Intercept 2022 | 1,180 Announcements with Cu% Intercept 2021 | 957 Announcements with Cu% Intercept 2020 | 536

  24. Slide 24: T5 Drilling Status

    T5 DRILING Discovery STATUS Hole 5.2m at 3.1% Cu, 11.48m at 14.3% 1.1g/t Au Cu, 3.3g/t Au ~300m Mineralized Strike (so far) Open and dipping to the east Typical mineralization of iron oxide copper-gold ~300m (IOCG)-style deposits 24 TSXV BRVO | OTCQX BRVMF

  25. Slide 25: Large Magnetic Anomaly Identified

    LARGE MAGNETIC ANOMALY IDENTIFIED Significant Magnetic Anomalies Identified 5.2m at 3.1% Cu, 11.48m at 14.3% Central Location: The anomalies are 1.1g/t Au Cu, 3.3g/t Au centrally positioned among: 1) T5; 2) Historic copper workings; 3) Bravo’s high-grade massive sulphide intersected in DDH22LU047 (A

  26. Slide 26: IOCG Follow Up Program

    IOCG FOLLOW UP PROGRAM* *Ongoing Discussion Potential HeliTEM New Targets All EM targets to be re-examined with an IOCG view Additional IP lines underway Soil sampling coverage to be extended Magnetics and soil chemistry to be re-interpretated The number of priority EM targets are now fluid, and wil

  27. Slide 27: Key Value Drivers and Milestones

    Key Value Drivers and Milestones Catalysts in the year ahead PGE+Au+Ni Deposit Ni and Cu-Au Sulphide Prospects Oxide + Sulphides (Fresh Rock) Exploration and Drilling campaign over EM targets Upgrading and expanding current MRE in preparation for Economic Study 2025 Metallurgical PGM+Au+Ni MRE Permi

  28. Slide 28: Key Achievements Since IPO in July 2022

    KEY ACHIEVEMENTS SINCE IPO IN JULY 2022 Substantial growth, project de-risking and high prospectivity delivered AT IPO TODAY 252 holes / 50,352m Drilling Inventory 597 holes | 124,029m 2PGM+Au+Ni (Historical**) 3PGM+Au+Ni MRE (NI 43-101)* Resource Size and Quality 142Mt @ 1.24 g/t Pd+Pt+Au & 0.11% N

  29. Slide 29: Bravo – People, Project, Place, Strategy

    BRAVO – People, Project, Place, Strategy Fully funded to execute on MRE Upgrade Activities, Ni and Cu-Au Exploration, Permitting to PFS PEOPLE PROJECT Fit for purpose team Emerging Tier 1 asset due to quality, scale and location Brazilian permitting, exploration, development and operating expertise

  30. Slide 30: For additional information contact: Alex Penha

    TSXV BRVO OTCQX BRVMF For additional information contact: ALEX PENHA EVP Corporate Development alex.penha@bravomining.com www.bravomining.com | LinkedIn @BravoMining | Twitter X @BRVOMining | YouTube Bravo Mining PALLADIUM PLATINUM RHODIUM GOLD NICKEL COPPER Pd Pt Rh Au Ni Cu

  31. Slide 31: Appendices

    TSXV BRVO OTCQX BRVMF APPENDICES PALLADIUM PLATINUM RHODIUM GOLD NICKEL COPPER Pd Pt Rh Au Ni Cu

  32. Slide 32: Leadership Strategy – Fit for Purpose Board

    LEADERSHIP STRATEGY – Fit for Purpose Board Global, Brazilian and PGM exploration, permitting, development, construction and operation expertise LUIS STUART TONY STEPHEN AZEVEDO COMLINE POLGLASE QUIN Ex. Chairman & CEO Director Director Director Brazilian, based in Brazil British, based in South Afr

  33. Slide 33: Leadership Strategy – Brazilian Expertise Key to Success

    LEADERSHIP STRATEGY – Brazilian Expertise Key to Success Brazilian and PGM, financial, exploration, permitting and development expertise SIMON MANOEL ALEX HEINRICH PAULO ILIDIO MOTTRAM CERQUEIRA PENHA MÜLLER DE BRITO President CFO EVP Corporate Development VP Technical Services VP Exploration Austra

  34. Slide 34: Bravo Technical and Metals Marketing Team

    BRAVO Technical and Metals Marketing Team Exceptional professionals with test-design-build success track-records across the industry +40 years of experience as metallurgist including PGM - Lonrho/Lonmin. Previously with SR. CHEMICAL ENGINEER Kinross (Director – Technical), Avanco Resources, Oz Miner

  35. Slide 35: Maiden Mineral Resource Estimate at 0.5g/t Cut-off Grade

    Maiden Mineral Resource Estimate at 0.5g/t Cut-off Grade INDICATED: 4.1 Moz at 1.75 g/t PdEq | INFERRED: 5.7 Moz at 1.50 g/t PdEq Average Grades and Contained Metals Estimates Resource Weathering Tonnes Pd Eq Pd Pt Rh Au Ni Classification Mt g/t Oz g/t Oz g/t Oz g/t Oz g/t Oz % Tonnes Oxide 4.6 1.43

  36. Slide 36: Permitting and Access

    PERMITTING AND ACCESS De-risked future permitting process | Surface access agreements for 100% of Luanga Deposit Luanga Added to Brazilian Pará State Environmental Agency Government’s List of Strategic Issued “Terms of Reference” Minerals Projects for Luanga Strategic Minerals Policy aims to priorit

  37. Slide 37: Site Access Road

    Site Access Road 2022 2023 2023 2023 2023 2023 37 TSXV BRVO | OTCQX BRVMF

  38. Slide 38: Social Responsibility

    SOCIAL RESPONSIBILITY Not just a moral obligation, but a crucial component of Bravo’s business success Bravo’s Nursery Distribution of Uniforms Christmas Food Drive Our partnership with local communities have been instrumental in securing social license and building a positive reputation Planting th

  39. Slide 39: ESG – Trust is the Rarest Commodity

    ESG – Trust is the Rarest Commodity Foundation of Bravo ESG Board Committee Environmental Social Governance WATER/LAND IMPACT PEOPLE INDEPENDENCE Disturbed land, predominantly used Brazilian employees & contractors: 80% of workforce Board that is majority independent from for cattle grazing are resi

Bravo Mining — Investor Presentation (January 2025) on 6ix