  1. Slide 1: CFE Fibra E

    Slide 1: CFE Fibra E

    CFE FIBRA E

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER IMPORTANT: You must read the following before continuing. This presentation has been prepared by CFECapital, S. de R.L. de C.V. (“CFECapital” or the “Manager”) and is being provided to you for informational purposes only. Neither the Manager nor any of its affiliates or representatives ma

  3. Slide 3: Agenda

    Slide 3: Agenda

    Agenda 1 CFE at a glance 2 Mexican power sector 3 CFE Transmisión – regulated tarriff 4 CFE Fibra E structure 5 2018 results and prospective 3

  4. Slide 4: Agenda

    Slide 4: Agenda

    Agenda 1 CFE at a glance 2 Mexican power sector 3 CFE Transmisión – regulated tarriff 4 CFE Fibra E structure 5 2018 results and prospective 4

  5. Slide 5: Fulfilling Mexico's Electricity Needs

    Slide 5: Fulfilling Mexico's Electricity Needs

    Comisión Federal de Electricidad (CFE): more tan 80 years of history, 80 Years public Fulfilling service, Mexico’s progress, Electricity Needs and innovation. 1937 Population in Mexico with electricity Installed capacity 38.0% 64 kW Generation Transmission and distribution Clients In 1942: 1 plant W

  6. Slide 6: CFE is a relevant player compared to the largest electricity companies in the world

    Slide 6: CFE is a relevant player compared to the largest electricity companies in the world

    CFE is a relevant player compared to the largest electricity companies in the world. Installed capacity* (MW, end 2017) 134,896 103,000 86,000 55,240 49,500 48,800 48,138 46,790 46,000 45,495 32,700 26,000 26,000 * Selected companies based on the Global Industry Classification Standard by MSCI and S

  7. Slide 7: In recent years, CFE has been through a profound transformation

    Slide 7: In recent years, CFE has been through a profound transformation

    In recent years, CFE has been through a profound transformation. CFE as a state-owned CFE as a state-owned company productive enterprise Electricity company Energy company Vertically integrated monopoly Competition in generation and supply Responsible for the public power Generates value and profita

  8. Slide 8: Company Snapshot

    Slide 8: Company Snapshot

    Company snapshot: 14 subsidiaries and affiliates plus specific business Company units. Snapshot Legacy Fuel trade 6X Generation Transmission contracts (2X, national and abroad) Holding company Basic Distribution Qualified Supply CFECapital Supplier Subsidiaries Affiliates • Transmission and distribu

  9. Slide 9: Agenda

    Slide 9: Agenda

    Agenda 1 CFE at a glance 2 Mexican power sector 3 CFE Transmisión – regulated tarriff 4 CFE Fibra E structure 5 2018 results and prospective 9

  10. Slide 10: New regulatory and institutional framework attracts capital and technology

    Slide 10: New regulatory and institutional framework attracts capital and technology

    New regulatory and institutional framework attracts capital and technology. Transmission and Generation Commercialization distribution Open access to the Open to competition among transmission network and the Two different types of services: private and public generators. distribution grids. 1) basi

  11. Slide 11: Market structure

    Slide 11: Market structure

    Market structure. Independent system operator and payment collector Wholesale electricity Generation1 Commercialization End users market Medium and long-term auctions Regulated tariff and capacity tenders Generation subsidiaries Energy spot market Basic supplier2 Basic service users Other products M

  12. Slide 12: The energy sector in Mexico is growing

    Slide 12: The energy sector in Mexico is growing

    The energy sector in Mexico is growing, gross power consumption is expected to grow at an annual average rate of 3.1% through 2032.1 Electric power consumption2 National GDP and electricity industry growth index3 (kWh per capita, 2014) (2007-2017) 14,000 140 12,984 130 12,000 120 110 10,000 100 90 8

  13. Slide 13: Mexico's power sector will need strategic investments through the value chain

    Slide 13: Mexico's power sector will need strategic investments through the value chain

    To meet the requirements, Mexico’s power sector will need strategic investments through the entire value chain. Investment requirements 2018-20321 2018-2022 CFE planned investments by business2 (billion USD) (billion USD) $8 Distribution USD $8 billion Transmission 7% $5 USD $10 billion 9% $4 2 3 $0

  14. Slide 14: Agenda

    Slide 14: Agenda

    Agenda 1 CFE at a glance 2 Mexican power sector 3 CFE Transmisión – regulated tarriff 4 CFE Fibra E structure 5 2018 results and prospective 14

  15. Slide 15: CFE Transmisión has proven industry experience and stable cash flows

    Slide 15: CFE Transmisión has proven industry experience and stable cash flows

    CFE Transmisión has proven industry experience and is a business with stable cash flows driven by a regulated tariff. 2.5x Earth’s circumference in transmission and sub transmission lines2: ~107,000 kms CFE Transmisión manages the resources and infrastructure necessary for electricity transmission t

  16. Slide 16: Current transmission tariffs methodology overview

    Slide 16: Current transmission tariffs methodology overview

    Current transmission tariffs methodology overview. Postage stamp model1 that recognizes costs and incentivizes Objective investments. It guarantees access to all market participants and pursues reliability, efficiency, and quality in the service. The Energy Regulatory Commission (CRE) is an autonomo

  17. Slide 17: Required income: recognizes costs, rewards investment, encourages efficiency

    Slide 17: Required income: recognizes costs, rewards investment, encourages efficiency

    Required income: i) recognizes operating costs, ii) rewards capital investment, and iii) encourages cost efficiency. Required income = CFE Transmisión + Capital - Efficiency costs expenditure path Required income is assigned to consumers and generators (70% and 30%, respectively) and divided by volu

  18. Slide 18: Agenda

    Slide 18: Agenda

    Agenda 1 CFE at a glance 2 Mexican power sector 3 CFE Transmisión – regulated tarriff 4 CFE Fibra E structure 5 2018 results and prospective 18

  19. Slide 19: CFECapital and CFE Fibra E

    Slide 19: CFECapital and CFE Fibra E

    CFECapital and CFE Fibra E. Our objective is to invest in Controlling interest in FIBRA E 1 activities under CFE’s mandate. Direct affiliate of CFE Holding and We will take advantage of the Manager of CFE FIBRA E 2 fiscal structure of a FIBRA E1 in Mexico.2 CFE Fibra E Source: CFE and CFECapital. 1E

  20. Slide 20: CFE Fibra E: structural soundness

    Slide 20: CFE Fibra E: structural soundness

    CFE Fibra E: structural soundness Agreement CFE Transmisión assigned its Collection rights collection rights for a period of 30 years. Promoted Trust It receives reimbursements for the Distributions Distributions operation of the Transmission grid (93.22%) (6.78%) based on an annual budget. CFE Tran

  21. Slide 21: The Promoted Trust reimburses CFE Transmisión costs and expenses

    Slide 21: The Promoted Trust reimburses CFE Transmisión costs and expenses

    The Promoted Trust reimburses to CFE Transmisión costs and expenses for the operation of the Transmission grid. Promoted Trust Reserves account 2 General account VAT account Operation and maintenance Trust expenses Major expenses maintenance Indemnities Intercompany expenses Financing Obligations ex

  22. Slide 22: Series B CBFEs are permanently subordinated to Series A

    Slide 22: Series B CBFEs are permanently subordinated to Series A

    Series “B” CBFEs hold by CFE are permanently subordinated to the Series “A” hold by investors with respect to distributions1. Minimum MXN 0.575 per Quarterly certificate Distribution 100% 100% CBFE Series “A” CBFE Series “B” Pro-rata distributions Unpaid distributions Unpaid distributions Distributi

  23. Slide 23: Corporate governance of CFE Fibra E

    Slide 23: Corporate governance of CFE Fibra E

    Corporate governance of CFE Fibra E guarantees transparency, efficiency in the operation, and shared responsibility. Composition • Approve leverage guidelines² and • Changes to the CENACE changes to the investment regime. Promoted agreement.1 Trust • Additional issuances. • Budget and reimbursement

  24. Slide 24: Agenda

    Slide 24: Agenda

    Agenda 1 CFE at a glance 2 Mexican power sector 3 CFE Transmisión – regulated tarriff 4 CFE Fibra E structure 5 2018 results and prospective 24

  25. Slide 25: Revenues fluctuate during the year due to seasonal factors

    Slide 25: Revenues fluctuate during the year due to seasonal factors

    Revenues fluctuate during the year, primarily due to the impact that seasonal factors have on electricity consumption and demand. Collection rights from CENACE1 (million MXN) 1,700 • Comparing 2018 vs 2017, from January to September, the 1,600 average revenue difference is 1,500 around 10%. 1,318 1,

  26. Slide 26: Collection rights and reimbursements behave according to plans

    Slide 26: Collection rights and reimbursements behave according to plans

    Both collection rights and reimbursements behave according to plans, showing no deviations. Collection rights and reimbursements to CFE Transmisión (million MXN) 1,800 1,600 • On average, weekly 1,400 collection rights from 1,200 July to September were 1,000 MXN 1,564 million 800 pesos. 600 400 • On

  27. Slide 27: Reimbursements are going in line with budget

    Slide 27: Reimbursements are going in line with budget

    Reimbursements are going in line with budget. Reimbursements made vs 2018 budget (million MXN) Category 2018 Budget As of June 30 As of September 30 % against budget Intercompany expenses 6,789 2,362 3,326 49% Operation and maintenance 5,998 1,955 3,834 64% Obligations expenses 3,134 896 1,617 52% M

  28. Slide 28: Process for a project to be recognized by the regulator in the tariff

    Slide 28: Process for a project to be recognized by the regulator in the tariff

    For a project to be recognized by the regulator in the tariff, it should follow the next process Infrastructure needs Economical and strategic detected analysis CENACE SENER Development plans. CRE Opinion on development plans. Approved by No Included in the PRODESEN SENER Yes Not executed End CFE in

  29. Slide 29: CFE Transmisión projects pipeline approved by the Board

    Slide 29: CFE Transmisión projects pipeline approved by the Board

    CFE Transmisión projects pipeline was approved by the Board of Directors. Expected investments for 12.8 billion pesos. With entry into operation between 2019 and 2023 . 24 projects Smart Energy Grid with an estimated investment of MXN $4.9 billion pesos will start approved by CFE’s Board operations

  30. Slide 30: CFE Transmisión projects pipeline approved by the Board of Directors

    Slide 30: CFE Transmisión projects pipeline approved by the Board of Directors

    CFE Transmisión projects pipeline was approved by the Board of Directors. Investment Projects (million MXN) Red Eléctrica Inteligente (REI) 4,895 Sistema de Medición del MEM 2,764 Planned entry into operation and cumulative investment Incremento capacidad de transmisión Puebla, (projects, million MX

  31. Slide 31: * Bethe oe

    Slide 31: * Bethe oe

    * Bethe oe Sistema Eléctrico Nacional Diciembre 2021 Centro Nacional de Control de Energia ‘Subdireccién de Planeacién

  32. Slide 32: Higher-than-the-MQD distributions for both Series

    Slide 32: Higher-than-the-MQD distributions for both Series

    Delivering results: higher-than-the-MQD distributions for both Series. FCFE 2018 distributions (MXN per CBFE) 0.950 0.175 0.775 Paid 0.684 0.509 distribution 0.200 0.200 0.175 MQD for the 0.684 Q2 2018 collection 0.575 0.575 0.509 period was MXN 0.575*(1.19) per CBFE. Series "A" Series "B" Series "A

  33. Slide 33: September distribution covers the highest power consumption period

    Slide 33: September distribution covers the highest power consumption period

    The September 28 distribution covers the highest power consumption period of the year. Income 14.62% higher than previous period. Weekly revenues from CENACE (million MXN) 1,700 Max 1,639 1,600 1,568 1,500 1,428 1,400 1,368 1,318 1,300 1,244 1,200 1,100 1,000 900 800 Jan Feb Mar Apr May Jun Jul Aug

  34. Slide 34: Key activities for 2018

    Slide 34: Key activities for 2018

    Key activities for 2018 Nov 2018 2018-2024 Federal Administration (December 1) Upcoming distributions • CFECapital collaborates with CFE in the transition December 31, 2018 process. (MQD: MXN 0.575 per certificate)1 Transmission tariffs (deadline December 31) • Close to a final definition (methodolo

  35. Slide 35: Contact

    Slide 35: Contact

    CONTACT investor@cfecapital.com.mx http://cfecapital.com.mx/

Source: Internet Archive copy of cfecapital.com.mx

More decks from Cfe Fibra E Series A

All 52 Cfe Fibra E Series A decks