Golden Horse Minerals Limited Chess Depository · ASX:GHM

Golden Horse Minerals Limited Chess Depository — Golden Horse Minerals — Diggers and Dealers Mining Forum 2026

17 slides from Golden Horse Minerals Limited Chess Depository's conference presentation, Aug 3, 2026

  1. Slide 1: Diggers and Dealers Mining Forum Presentation

    ASX Announcement 3 August 2026 DIGGERS AND DEALERS MINING FORUM PRESENTATION Golden Horse Minerals Limited (ASX: GHM) (Golden Horse or Company) is pleased to enclose a copy of the Investor Presentation to be delivered by our Managing Director & CEO, Nicholas Anderson, at the Diggers and Dealers Mini

  2. Slide 2: 2026: Year of the Horse

    2026: YEAR OF THE HORSE For personal use only Diggers and Dealers Mining Forum Kalgoorlie I 03-05 August 2026

  3. Slide 3: Disclaimer

    DISCLAIMER Disclaimer This investor presentation has been prepared by Golden Horse Minerals Limited (Company) based on information from its own and third-party sources and is not a disclosure document. No party other than the Company has authorised or caused the issue, lodgement, submission, despatc

  4. Slide 4: Investment Thesis: Active Explorer, Future Gold Developer

    Investment Thesis: Active Explorer, Future Gold Developer • Portfolio of high growth, advanced gold projects in an underexplored and well-endowed greenstone belt. • Fully-funded aggressive RC & DD drill program across Hopes Hill and regional prospects For personal use only RIGHT RIGHT RIGHT RIGHT RI

  5. Slide 5: Corporate Summary

    CORPORATE SUMMARY Fully Funded Exploration Program – set for execution in 2026 Tight Capital Structure Strong Share Price performance (since IPO) Quality Analyst Coverage For personal use only Share Price1 A$0.40 $0.900 Daily Volume Closing Share Price 7.0m $0.800 6.0m Total Shares & CDIs on Issue2

  6. Slide 6: Reflection on 2025: The Vision

    REFLECTION ON 2025: The Vision “To build a significant gold resource base within 18 months following ASX listing and develop production-ready assets’’ +200 holes drilled, all hit mineralisation For personal use only • +41.5km of drilling completed from 220 holes since Jan 2025. • Consistent broad, h

  7. Slide 7: 2026: The Year of the Horse

    2026: THE YEAR OF THE HORSE • Fully Funded exploration program ($31M1). • ~3x more drill metres than 2025. • + 50 gram-metre intercepts in 2026 include2: For personal use only • 26HHDD010: 16m @ 6.8 g/t Au • 26HHRC066: 7m @ 13.0 g/t Au • 26HHRC147: 12m @ 7.3 g/t Au • 26HHRC024: 12m @ 7.0 g/t Au • 26

  8. Slide 8: GHM's Flagship: Hopes Hill Gold Project

    GHM’S FLAGSHIP: HOPES HILL GOLD PROJECT • Two phases of underground and open pit For personal use only mining from 1895 to 1989 have produced over 216koz1 at 2.5 g/t Au. 1904 1988 • Active drill programs at Hopes Hill and regional drilling activities throughout 2026. • Broad, high-grade mineralisati

  9. Slide 9: Hopes Hill: +3km of Unlocked Strike Potential

    HOPES HILL: +3KM OF UNLOCKED STRIKE POTENTIAL Hopes Hill North2: Hopes Hill North Wide intercepts +1.5km from the pit crest: • 26HHRC024: 12m @ 7.0 g/t Au from 278m For personal use only • 26HHRC027: 16m @ 1.6 g/t Au from 32m • 26HHRC042: 8m @ 1.9 g/t Au from 40m • GHHNRC0007: 8m @ 1.8 g/t Au from 2

  10. Slide 10: Hopes Hill: Getting Better with Every Hole

    HOPES HILL: GETTING BETTER WITH EVERY HOLE For personal use only Note 1: Refer to the Independent Technical Assessment report annexed to the replacement prospectus lodged with the ASX on 12 December 2024. Note 2: Refer to ASX announcements dated 14 April 2026, 23 April 2026, 28 May 2026, 18 June 202

  11. Slide 11: Hopes Hill Main: Continued Drilling Success

    HOPES HILL MAIN: CONTINUED DRILLING SUCCESS • Diamond drilling continues to intercept wide, high-grade mineralisation +350m below surface. • RC drilling successfully intercepts extensions beyond 3km of mineralised strike along Hopes Hill trend. For personal use only • Mineralisation remains open wit

  12. Slide 12: Hopes Hill: Simple & Proven Mineralogy

    HOPES HILL: SIMPLE & PROVEN MINERALOGY Proven Production • 216koz Au recovered to 19891 Exceptional Recoveries For personal use only • +95% recoveries in 2025 BLEG testwork2 Free-Milling Gold Confirmed • 2026 Microscopy Study completed2 Qtz Hopes Hil CIL plant1 under construction, 1987 Note 1: The H

  13. Slide 13: Other Ponies in the Stable: Queued for Drilling

    OTHER PONIES IN THE STABLE: QUEUED FOR DRILLING • Greenmount1: High-grade extensional mineralisation confirmed in first pass drill program: For personal use only 26GMRC006: 8m @ 16.3 g/t Au from 209m 26GMRC004: 8m @ 8.6 g/t Au from 218m 26GMRC005: 12m @ 5.2 g/t Au from 139m • Withers1: Grab sampling

  14. Slide 14: Regional Context

    REGIONAL CONTEXT Four major players in the Southern Cross district with >87% of total gold endowment hosted by Golden Horse and three other parties. For personal use only • Edna May • ~ 2.9Mtpa Process Plant (C&M) • ~ 1.0Moz Au resource • Marvel Loch (Barto Gold) • Underutilised processing plant ope

  15. Slide 15: Sorrel: Low-Cost Exposure to Copper Market

    SORREL: LOW-COST EXPOSURE TO COPPER MARKET • Exposure to copper, cobalt and base metal markets with strategic acquisition in For personal use only 2025. • Located in the productive McArthur Basin ~30km west of NT / Queensland border. Project features1: • Mineral Resource Estimate of 8.4Mt @ 1.1% cop

  16. Slide 16: Backing the Right Horse

    BACKING THE RIGHT HORSE Accelerating growth across advanced high grade brownfield gold projects For personal use only RIGHT RIGHT RIGHT RIGHT RIGHT LOCATION MOMENT ASSETS PEOPLE STRATEGY Dominant Advanced Access to Key Experienced Focusing on position within asset building Infrastructure Board & del

  17. Slide 17: For personal use only

    For personal use only A: Ground Floor, 34 Colin Street West Perth WA 6005 I E: info@goldenhorseminerals.com.au

Golden Horse Minerals — Diggers and Dealers Mining Forum 2026 on 6ix