Patel Engineering Limited · NSE:PATELENG

Patel Engineering — Q2/H1 FY27 Earnings Presentation

36 slides from Patel Engineering's earnings presentation, Nov 5, 2026

  1. Slide 1: Submission of Investor/Analysts Presentation to exchanges

    November 5, 2026 To, BSE Limited The National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers, Exchange Plaza, Dalal Street, Bandra - Kurla Complex, Mumbai - 400 001 Mumbai - 400 051 Company Code No. 531120 Company Code: PATELENG Dear Sir/Mam, Subject: Submission of Investor/ Analysts Pres

  2. Slide 2: Investor Presentation Q2/H1-FY27

    Patel Engineering Limited INVESTOR PRESENTATION April, 2026 INVESTOR PRESENTATION Q2/H1-FY27

  3. Slide 3: Snapshot

    Snapshot 75 + 350+ INR 1,35,464 Mn Years of Industry Projects Executed Total Order Book Presence 87+ 300+ 15,000+ Dams Constructed KM Tunnels MW Hydro Project 52 14 5.5+ States – Domestic Ongoing Projects Lakh Acres Irrigated Presence 2.72 2 1,200+ Book-to-Bill Nepal & Bhutan – KM of Roads (Q2/H1 FY

  4. Slide 4: Q2/H1-FY27 Performance

    Q2/H1-FY27 PERFORMANCE

  5. Slide 5: Key Financials and Operational Highlights

    Key Financials and Operational Highlights Q2-FY27 Consolidated Performance Q2 FY27 – Key Highlights Revenue from Achieved successful breakthrough of ~12 km irrigation tunnel at OP. EBITDA OP. EBITDA Margin Operations the Sleemanabad project using a 10m dia. TBM INR 12,107 Mn INR 1,503 Mn 12.41% 0.2%

  6. Slide 6: Key Operational Updates – Q2 FY27 (1/2)

    Key Operational Updates – Q2 FY27 (1/2) Subansiri Lower Hydropower Project Commencement of Wet Commissioning of Unit 7 - Commencement of Machine Hall Floor and Unit 8 - Commencement of Turbine Floor and Unit 5 (250 MW) Generator Floor concreting works Generator Floor concreting works Sleemanabad Car

  7. Slide 7: Key Operational Updates – Q2 FY27 (2/2)

    Key Operational Updates – Q2 FY27 (2/2) Kiru Hydropower Project 12 lakh cubic meters of dam concreting achieved out Advancing toward Dam completion with the Power House slab concreting works complete of a total target of 12.50 lakh cubic meters commencement of Deck Slab concreting works following th

  8. Slide 8: Awards & Accolades

    Awards & Accolades Maharashtra’s Best Employer Brand 18th IEI Industry Excellence Award 2026 (Gold): Awards 2026 Construction Engineering Organizations Hydro Vibhushan Award: Kavita Shirvaikar, Best Hydropower EPC Enterprise of INDIA-18th INDIA Hydropower’s First Woman Business Leader Hydro & PSPs A

  9. Slide 9: Order Intake & Order Backlog

    Order Intake & Order Backlog Order Intake (At the end of each year, Values in INR. Mn) H1-FY27 Segmental Order Intake – INR 645 Mn 50000 44,009 45000 40,742 40000 35000 30000 25000 20000 15000 10000 5000 1,112 645 0 Irrigation, 100.00% FY24 FY25 FY26 H1-FY27 Order backlog (At the end of each year, V

  10. Slide 10: Total Order Book

    Total Order Book Segment Wise Order Book Client Wise Order Book Project Completion Status 5.89% 3.56% 2.91% 15.85% 1.61% 16.70% 3.57% 41.15% 28.80% 16.36% 14.48% 62.40% 63.64% 17.75% 5.33% Hydroelectric Irrigation Central Government / PSU’s State Government Below 10% 10% - 30% 30% - 50% Tunnel Road

  11. Slide 11: Geographical Presence & Order Book Split

    Geographical Presence & Order Book Split 52 Ongoing Projects spread across 14 states domestically and also Jammu and International presence in Nepal and Bhutan with a total project value Kashmir of INR 1,35,464 Mn Himachal Domestic Pradesh Arunachal Sr.No. State No. of Projects Project Value (INR Mn

  12. Slide 12: Quarterly Consolidated Income Statement

    Quarterly Consolidated Income Statement Particulars (INR Mn) Q2-FY27 Q2-FY26 Y-o-Y Q1-FY27 Q-o-Q Revenue From Operations 12,107 12,085 0.2% 12,807 (5.5)% Total Expenses 10,604 10,498 1.0% 11,011 (3.7)% Operating EBITDA 1,503 1,587 (5.3)% 1,796 (16.3)% EBITDA Margins (%) 12.41% 13.13% (72) Bps 14.02%

  13. Slide 13: Half Yearly Consolidated Income Statement

    Half Yearly Consolidated Income Statement Particulars (INR Mn) H1-FY27 H1-FY26 Y-o-Y Revenue From Operations 24,914 24,419 2.0% Total Expenses 21,615 21,179 2.1% Operating EBITDA 3,299 3,240 1.8% EBITDA Margins (%) 13.24% 13.27% (3)Bps Depreciation and Amortization 512 516 (0.8)% Finance Costs 1,278

  14. Slide 14: Strategic Overview

    STRATEGIC OVERVIEW

  15. Slide 15: Focused Strategy to Drive Sustainable Growth

    Focused Strategy to Drive Sustainable Growth Build capabilities in technology- Focus on high entry-barrier driven execution including segments including hydropower, pumped storage, and tunneling 01 04 tunneling, underground works, and advanced construction methods Leverage strong positioning in Main

  16. Slide 16: Strengthening Balance Sheet & Credit Profile

    Strengthening Balance Sheet & Credit Profile Debt Breakup (INR Mn) Total Debt Plus Advances (INR Mn) 16,025 22,670 13,121 18,092 19,212 11,870 6,645 10,015 6,222 6,091 8,469 9,623 16,025 11,870 13,121 6,010 3,401 3,498 FY25 FY26 H1 FY27 FY25 FY26 H1 FY27 Term Debt Working Capital Debt Total Debt Deb

  17. Slide 17: Company Overview

    COMPANY OVERVIEW

  18. Slide 18: Company Overview

    Company Overview • Established in 1949, Patel Engineering Limited (PEL) is a leading integrated infrastructure and Revenue & EBITDA Margin engineering, procurement, and construction company, headquartered in Mumbai, with over 50,934 51,027 45,441 75 years of experience. • Has completed over 350 infr

  19. Slide 19: Board of Directors & Key Managerial Persons

    Board of Directors & Key Managerial Persons Janky Patel | Chairperson & Non- Kavita Shirvaikar | Managing Kishan Lal Daga | Whole Time R V R Kishore | Whole Time Director- Ms. Sudha Navandar | Independent Executive Director Director Director Operations Director Non-Executive Chairperson "Continuing

  20. Slide 20: Marquee Clientele

    Marquee Clientele Madhya Pradesh Water Resources Department Investor Presentation 19

  21. Slide 21: Marquee Projects Executed

    Marquee Projects Executed Sawrakuddu HE Project - Himachal Pradesh (111 MW) Koyna HE Project - Maharashtra (260MW) First Piano Key Weir in India First Lake Tapping in Asia. Rampur HE Project - Himachal Pradesh (432 Mw) Srisailam HE Project - Andhra Pradesh (900 MW) Ghatghar Dam – Maharashtra 84m hig

  22. Slide 22: Business Overview

    __ BUSINESS _ OVERVIEW

  23. Slide 23: Business Overview

    Business Overview Hydropower & Dam Irrigation & Water Infrastructure Infrastructure • Dams, Underground Works & • Canal Networks & Water Powerhouses Distribution Systems • Tunnelling-Intensive Hydro • Large-Scale Government Projects Irrigation Projects • Government & PSU-Led Projects • Water Resourc

  24. Slide 24: Hydropower & Dam Infrastructure

    Hydropower & Dam Infrastructure • Execution of large-scale hydropower and pumped storage engineering, procurement and construction Revenues (INR Mn) projects. 28,145 24,593 22,061 • Involvement across critical hydro infrastructure components, including dams, tunnels, and underground powerhouses. 17,

  25. Slide 25: Irrigation & Water Infrastructure

    Irrigation & Water Infrastructure Revenues (INR Mn) • Execution of large-scale irrigation and water infrastructure projects across India. 13,251 • Focus on development of canal networks, water distribution systems, and associated civil works. 11,387 10,658 • Focus on improving water-use efficiency t

  26. Slide 26: Tunnelling & Underground Engineering

    Tunnelling & Underground Engineering Revenues (INR Mn) • Specialised engineering segment focused on underground infrastructure across hydropower and transportation projects. 8,384 • Expertise in advanced tunnelling techniques including tunnel boring machine and drill-and-blast methods. 6,350 5,351 •

  27. Slide 27: Transportation, Urban Infrastructure & Others

    Transportation, Urban Infrastructure & Others Revenues (INR Mn) • Execution of transportation infrastructure projects including roads, bridges, rail tunnels, urban connectivity works and others. 7,739 • Participation in highway, railway, and metro-related projects across multiple regions. 6,372 • In

  28. Slide 28: Industry Overview

    INDUSTRY OVERVIEW

  29. Slide 29: Hydropower & Pumped Storage Opportunity Pipeline

    Hydropower & Pumped Storage Opportunity Pipeline Pumped Key Drivers Hydropower Storgae Clean & Renewable Energy: Projects • Hydropower and PSP’s are critical for India’s clean energy transition. Growing Power Demand: • Rising demand and peak power requirements BUILDING A STRONG driving new capacity

  30. Slide 30: Financial Overview

    FINANCIAL OVERVIEW pep eT

  31. Slide 31: Historical Consolidated Income Statement

    Historical Consolidated Income Statement Particulars (INR Mn) FY24 FY25 FY26 H1-FY27 Revenue From Operations 45,441 50,934 51,027 24,914 Total Expenses 38,538 43,602 44,187 21,615 EBITDA 6,903 7,332 6,840 3,299 EBITDA Margins (%) 15.19% 14.40% 13.40% 13.24% Depreciation and Amortization 976 998 1,03

  32. Slide 32: Historical Consolidated Balance Sheet

    Historical Consolidated Balance Sheet Particulars (INR Mn) FY25 FY26 H1-FY27 Particulars (INR Mn) FY25 FY26 H1-FY27 EQUITY 37,768 44,420 46,796 Non - Current Assets 39,492 40,904 40,093 a) Equity Share Capital 844 992 992 a) Property Plant & Equipment 12,827 12,550 12,492 b) Other Equity 37,002 43,4

  33. Slide 33: Financial Performance

    Financial Performance Revenue from Operation (INR Mn) EBITDA (INR Mn) & EBITDA (%) PAT (INR Mn) & PAT (%) # 7,332 50,934 51,027 6,903 6,840 2,945 45,441 2,641 2,422 1,767 24,914 3,299 15.19% 14.40% 13.40% 13.24% 7.09% 5.81% 4.75% 5.77% FY24 FY25 FY26 H1-FY27 FY24 FY25 FY26 H1-FY27 FY24 FY25 FY26 H1-

  34. Slide 34: Capital Market Information

    Capital Market Information Share Price up to 30th September, 2026 10% 0% -10% -20% -30% -40% -50% Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Patel Engineering Sensex Price Data (As on 30th September, 2026) INR Shareholding Pattern (As on 30th September, 2026)

  35. Slide 35: Disclaimer

    Disclaimer Patel Engineering Ltd No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained in this presentation. Such information and opinions are in all events n

  36. Slide 36: Thank You

    LoL eke (iii THANK YOU

Patel Engineering — Q2/H1 FY27 Earnings Presentation on 6ix