Slide 1: Advancing the King-king Copper-Gold Project in the Philippines
Advancing the King-king Copper-Gold Project in the Philippines February 2015 SAU.TO Investor Presentation

Slide 2: Disclosure
Disclosure This presentation contains “forward-looking statements” that were based on St. Augustine Gold & Copper Ltd’s expectations, estimates and projections as of the dates which those statements were made. These forward-looking statements include, among other things, statements with respect to S

Slide 3: Investment Highlights King-king Copper-Gold Project
Investment Highlights King-king Copper-Gold Project 618Mt reserve at 0.5% CuEq with an after tax $1.8 billion NPV8% Upcoming catalysts, include completion of permitting, providing for near-term construction Historic gold and copper intercepts point to upside resource potential Strong long-term coppe

Slide 4: A critical global copper commodity
A critical global Copper commodity 21.4Mt Annual Global Copper Growth 3.6% annual average growth in global copper demand 2014E global copper demand 16Mt Forecast increase in copper demand in 2030 if growth continues in China at 6%, ROW 0% Global demand tied to growth 2011 2012 2013 2014F 2015F 2016F

Slide 5: Projected long-term copper supply deficit
Projected long-term deficit Copper Supply vs. Demand with consideration 3.8Mt for brownfield expansion (Mt) 3.8Mtpa incremental capacity 26 Copper supply gap required by 2023 Demand for Mine Output Mine closures and limited 22 investment into greenfield projects Probable Brownfield (70%) creates no

Slide 6: King-king Copper-Gold Project
King-king Copper-Gold Project Major Philippine porphyry system 618 million tonne mineral reserve 4.1Blbs Cu & 7.8Moz Au Philippine Sea One of the world’s largest undeveloped copper-gold King-King Will Narrow Supply Gap projects 6

Slide 7: Copper Production Schedule
Copper Production Schedule Copper in Concentrate 52.3Kt p.a. 115 million lbs p.a. 3.16Blbs 70,000 60,000 Copper production in Years 1 - 5 1.43Mt 50,000 40,000 LOM copper production 30,000 20,000 10,000 0 270Mlbs -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 122.5Kt Copper Cathode Pr

Slide 8: Gold Production Schedule
Gold Production Schedule Gold in Concentrate Production 213Koz p.a. 5.43Moz 450,000 400,000 350,000 6,611kg p.a. Gold production over LOM 168,950kg 300,000 250,000 LOM gold production 200,000 150,000 100,000 50,000 0 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 360,143oz Gold Bulli

Slide 9: Robust Economics
Robust Economics* $1.8B Annual Revenue ($M) $6.1B Projected King-king $1,468 revenue from year 1- 5 NPV8% after tax over 22-year LOM $644 24.0% $$vbg IRR after tax Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 2.4-year $15.4B life of mine revenue Payback period * Based on No

Slide 10: Diversified revenue streams
Total Project Revenue By Metal Silver 1% Gold Copper 41% 58% Total Project Revenue By Product Gold Bullion 4% $0.7B Cathode Copper 20% $3.1B Concentrate 76% Cu / Au NSR $11.6B Diversified revenue streams 10

Slide 11: Production Cost Profile
Production Cost Profile C-1* Cash Costs C-1* Mine Production Cost $/lb Cu, allocated basis Curve (US$/lb) 241% $/lb Cu net of by-products $1.49 $1.26 increase in average C1* costs between 2000-2014 $1.09 $0.4 $0.19 $0.03 1-5 1-10 LOM *Includes smelting, concentrating, shipping and refining charges K

Slide 12: Operating Costs
*Payable pounds of copper Operating Costs 1.33B lbs Year 1 – 5* 2.05B lbs Year 1 – 10* 3.08B lbs LOM* Unit Costs ($/lb Cu) 1-5 1-10 LOM Mining $0.47 $0.60 $0.80 Processing $0.81 $0.92 $1.06 Operating Costs $1.28 $1.52 $1.86 G&A $0.13 $0.16 $0.25 Reclamation & Closure $0.00 $0.00 $0.02 Cash Costs at

Slide 13: Capital Cost / Capital Intensity
Capital Cost / Capital Intensity * Greenfield Project Capital $10,895 Intensity (US $/t) Low capital intensity project $19,400/t average capital intensity 20,000 * Initial capital /design capacity Capital Cost 15,000 Initial Capital $131M King-King Process Plant $1,005M 10,000 Power Plant $350M Port

Slide 14: Project Timeline
Project Timeline 2014 2015 2016 - 2019 Queensberry Mining Receipt of ECC and mining Construction of & Development permits King-king Corp. becomes largest shareholder PSE secondary listing First production of cathode copper (2018) Land acquisition for Secure project financing infrastructure Mill prod

Slide 15: Exploration Targets
Exploration Targets Testing confirms Au assays @ 2.2- 27.7/g/t Au* Notable intercept with 81 continuous meters averaging: .44% total copper and .34 g/t gold* 5 additional holes demonstrate high potential in the 1, 656 hectare tenement area *Refer to the press release dated March 1, 2012 for further

Slide 16: Strategic Location
Proximity to Low-cost Strategic market profile Location Competitive cost advantage N Boyongan Copper-Gold Project Taganito Mine Proximity to tidewater port and BOHOL SEA PHILIPPINE power facility SEA 35km direct from Davao City MINDANAO 1.5M: population and skilled KING- Philippines Davao KING workf

Slide 17: Attractive Investment Jurisdiction
Attractive Investment Jurisdiction 3rd >35 largest global gold endowment operating medium / large- $840B scale mines untapped identified mineral • Liberalized policies and regulation to wealth attract foreign and domestic investment • Elevated to investment-grade in 2013 4th • Fitch, Standard & Poor

Slide 18: Strong Shareholder Involvement
Strong Shareholder Involvement Queensberry Mining Capital Structure & Development Shares O/S ~ 727M • Strong ongoing financial support JV Restructuring Shares * ~ 185M • Active assistance in current project initiatives Post-Restructuring Total Shares ~ 912M Recent Share Price** $ 0.13 Major Sharehol

Slide 19: Leadership Team
Leadership Team BOARD OF DIRECTORS MANAGEMENT Manuel Paolo A. Villar, Chairman Manuel Paolo A. Villar, President and Chief Executive Officer Current Director, President and Chief Executive Officer of Vista Land and Lifescapes, Inc., Director (Refer to Board of Directors column) of Starmall, Inc. For

Slide 20: Appendix
gue SEPP rma ee whi Mame Bees = RY AF

Slide 21: Post-Restructuring King-king Ownership
Post-Restructuring King-king Ownership St. Augustine Gold & Copper Ltd. (TSX Listed Company) Asia-Pacific Dutch B.V. (Holding Company: Netherlands-Philippines Tax Treaty) Nationwide Development Corp. (NADECOR) 25%* A private Philippine Corp 40% 60% 100% Ore Sales Agreement Mining Co. Milling Co. (MP

Slide 22: Proven and Probable Reserves
Proven and Probable Reserves Ktonnes Tot Cu (%) Sol Cu (%) Gold (g/t) NSR (US$) Proven Mineral Reserve Heap Leach Ore 17,791 0.340 0.197 0.132 16.53 Oxide Mill Ore 21,674 0.514 0.328 0.849 45.36 Sulfide Mill Ore 52,942 0.305 0.044 0.543 24.92 Low Grade Mill Ore 6,734 0.184 0.027 0.218 10.80 Total Pr

Slide 23: Measured & Indicated Resource
Measured & Indicated Resource* Resource Tot Cu Sol Cu Gold Ore Type/Resource Class Ktonnes (%) (%) (g/t) Copper Leach Resource Measured Resource 20,961 0.439 0.317 0.205 Indicated Resource 75,214 0.347 0.228 0.155 Meas/Ind Resource 96,175 0.367 0.247 0.166 Inferred Resource 26,027 0.266 0.157 0.093

Slide 24: Process Flow Sheet
Process Flow Sheet PEBBLE CRUSHING PRIMARY CRUSHING SAG FEED ICATION INTENSIVE CYANIDATION Dore CYCLONE GRAVITY LL BULLION CONCENTRATION ELECTROWINNING CLEANER } | 3RD CLEANER is ROUGHER FLOTATION CONVEYOR CYCLONE PUMP BOX SULFIDE COARSE L_t TAILING 1ST CLEANER 3RD CLEANER! ORE STOCKPILE co DES AUTO
Source: Internet Archive copy of sagcmining.com
More decks from St. Augustine Gold & Copper Ltd.
Investor Presentation (September 2025)15 slides · September 2025
Investor Presentation (September 2025)18 slides · September 2025
Investor Presentation (March 2016)29 slides · Mar 28, 2016
Fact Sheet (February 2015)2 slides · February 2015
Precious Metals Summit 201320 slides · Sep 20, 2013
Investor Presentation (October 2011)17 slides · Oct 6, 2011