Rio Tinto Plc · LSE:RIO

Rio Tinto — Bank of America Global Metals, Mining & Steel Conference 2021

19 slides from Rio Tinto's conference presentation, Jun 1, 2021

  1. Slide 1: Notice to ASX: Bank of America Global Metals, Mining & Steel Conference

    Notice to ASX 18 May 2021 Bank of America Global Metals, Mining & Steel Conference Rio Tinto Chief Executive Jakob Stausholm is presenting today at the Bank of America Global Metals, Mining & Steel Conference. The presentation is attached and will also be available at https://riotinto.com/invest/pre

  2. Slide 2: Notice to ASX/LSE Contacts

    Notice to ASX/LSE Page 2 of 2 Contacts Please direct all enquiries to media.enquiries@riotinto.com Media Relations, UK Illtud Harri M +44 7920 503 600 David Outhwaite M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Investor Relations, UK Menno Sanderse M: +44 7825 195 178

  3. Slide 3: Jakob Stausholm, Chief Executive

    Jakob Stausholm Chief Executive Traditional Owners welcome employees at the final day of mining the Argyle underground block cave mine, 3 November 2020 Bank of America Global Metals, Mining & Steel conference 18 May 2021

  4. Slide 4: Cautionary and supporting statements

    ©2021, Rio Tinto, All Rights Reserved 2 Cautionary and supporting statements This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited (together with their subsidiaries, “Rio Tinto”). By accessing/attending this presentation you acknowledge that you have read and understood the foll

  5. Slide 5: Extraordinary times and significant volatility

    Extraordinary times and significant volatility ©2021, Rio Tinto, All Rights Reserved 3 March 2020 Early 2021

  6. Slide 6: We produce materials essential for a low-carbon future

    We produce materials essential for a low-carbon future Fe, Cu AI, Fe, Cu, Li Cu, AI, Fe Cu Cu, AI, Fe, Ti, Li, B 4©2021, Rio Tinto, All Rights Reserved

  7. Slide 7: Four areas of focus for an even stronger Rio Tinto

    Best operator Expand capability and leadership Impeccable ESG credentials Strengthen track record and transparency Excel in development Deliver organic & inorganic growth Four areas of focus for an even stronger Rio Tinto ©2021, Rio Tinto, All Rights Reserved 5 Social Licence Earn trust by building

  8. Slide 8: Building on our strengths

    Building on our strengths ©2021, Rio Tinto, All Rights Reserved 6 Safety always our priority Empower and develop our people to maximise their contributions Design and deploy Rio system at foundation sites over next 12 months to prove value and build momentum Achieving the highest operational, enviro

  9. Slide 9: Working towards impeccable ESG credentials

    Working towards impeccable ESG credentials 7 Safety At the heart of our culture 12% lower AIFR1 YoY Fatality-free year Communities & heritage Embed in culture, investing $50m in Indigenous leadership Site-based leadership of relationships with Traditional Owner groups Modernising agreements Establis

  10. Slide 10: Creating the portfolio for the next decade and beyond

    Creating the portfolio for the next decade and beyond Controlled risk-takers; committed to making rational choices Sharpening our capabilities Important capital project decisions in the next 12 months Ongoing renewal of the portfolio ©2021, Rio Tinto, All Rights Reserved 8 Best operator Impeccable E

  11. Slide 11: Becoming more outward looking

    Becoming more outward looking ©2021, Rio Tinto, All Rights Reserved Best operator Impeccable ESG credentials Excel in Development Social Licence Fully participating in the societies where we operate Real engagement with our communities; understanding their felt experience Seeking diverging views Lea

  12. Slide 12: Unleashing our full potential

    Unleashing our full potential 10 • Strong safety record • Great people • Portfolio of world-class assets • Cash generation & capital discipline • Strong balance sheet Strengths • Two years fatality-free • 27% ROCE • $9.4bn Free cash flow • $6.2bn Capital invested • $9.0bn Dividends declared • $8.4bn

  13. Slide 13: Appendix

    Appendix Clontarf Cup in Perth, Western Australia, 26 March 2021

  14. Slide 14: Our portfolio is well positioned for the low-carbon transition

    12 Our portfolio is well positioned for the low-carbon transition − Over 95% of our revenues are from assets with favourable operational carbon intensities − Around 22% of our revenues and 93% of our growth capital are in the segment with the least low carbon transition risk − 2020 Climate change re

  15. Slide 15: Our portfolio to perform strongly in scenarios with proactive climate action

    ©2021, Rio Tinto, All Rights Reserved 13 Our portfolio to perform strongly in scenarios with proactive climate action 1Targets are for scope 1 and 2 GHG emissions, for managed and non-managed operations on an equity basis 2Short Term Incentive Plan: 20% weighting to safety (unchanged) and 15% to ESG

  16. Slide 16: Significant Paterson footprint with potential beyond Winu

    Citadel JV SIPA Alloy Carawine Woodie Woodie Nifty Carawine Telfer Magnum Calibre 0 100 km Significant Paterson footprint with potential beyond Winu – Extensive portfolio of 100% owned tenure, majority owned joint venture (JV) tenure, and active earn-in opportunities – Continued positive engagement

  17. Slide 17: Oyu Tolgoi Underground: Developing a world-class asset

    Oyu Tolgoi Underground Developing a world-class asset Estimate for Panel 01: $6.75bn development capex; Safe & feasible pathway to October 2022 sustainable production One of the largest block cave mines. Proven strength in safety & productivity Talented & committed workforce: 12,000 employees of whi

  18. Slide 18: We are committed to the Simandou project and Guinea

    ©2021, Rio Tinto, All Rights Reserved 16 We are committed to the Simandou project and Guinea – One of the world’s largest untapped and richest high-grade iron ore deposits, located in Guinea – High-grade ores can support the transition to lower-carbon steel – Strengthens Rio Tinto’s iron ore portfol

  19. Slide 19: Jadar: Progressing technical studies and establishing trust

    ©2021, Rio Tinto, All Rights Reserved 17 Jadar: Progressing technical studies and establishing trust – Lithium-boron deposit with the potential to make Serbia a major global producer. Progressing feasibility study; expected to complete end of 2021. If approved, construction of the facility would com

Rio Tinto — Bank of America Global Metals, Mining & Steel Conference 2021 on 6ix