  1. Slide 1: Tillex Copper Project: Driving Growth

    Slide 1: Tillex Copper Project: Driving Growth

    rsonal use only TILLEX COPPER PROJECT: DRIVING GROWTH An emerging high-grade copper asset, Timmins Minerals District, Ontario, Canada ARUMA RESOURCES | ASX : AAJ | AGM PRESENTATION Nov 2026 1

  2. Slide 2: Disclaimer and Forward-Looking Statements

    Slide 2: Disclaimer and Forward-Looking Statements

    DISCLAIMER DISCLAIMER AND FORWARD-LOOKING STATEMENTS COMPETENT PERSONS STATEMENT rsonal use only This presentation has been authorised for release by the Board of Aruma Resources Limited. It is The information in this report regarding exploration results, exploration targets and the mineral not a pr

  3. Slide 3: Corporate Snapshot

    Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT rsonal use only SHARE PRICE MARKET CAP. SHARES ON ISSUE OPTIONS CASH $0.004 ~$6.2m 1,545.6m 448m* ~$2.12m 25 November 2026 25 November 2026 25 November 2026 *Various option series 25 November 2026 52 week, and expiry dates ▲high $0.04, ▼low $0.003 BOARD AND MANAGEMENT MAJOR SHAREH

  4. Slide 4: Investment Rationale

    Slide 4: Investment Rationale

    INVESTMENT RATIONALE A rapidly growing, shallow, high-grade copper-silver system in the Tier-1 Timmins district rsonal use only 3.2km ~275m >2% Cu ~US$6/lb Tillex Trend, mostly high-grade strike, multiple grades, Copper price up unexplored open in all up to 14% Cu; ~83% since July directions drillin

  5. Slide 5: Project Highlights

    Slide 5: Project Highlights

    PROJECT HIGHLIGHTS Tillex continues to grow rsonal use only • Two phases of diamond drilling since acquisition in Jan 2026; Phase-2 drilling ongoing and continues to extend a broad, shallow, high-grade copper-silver system. • Multiple strategic tenure acquisitions expands total Tillex Project area t

  6. Slide 6: Kidd Creek Mine and Timmins Operations

    Slide 6: Kidd Creek Mine and Timmins Operations

    KIDD CREEK MINE Historical Production1 772Mlb Cu, 2.1Blb Zn and 400Moz Ag TIMMINS OPERATIONS Reserves & Resources5 8.2Mt@ 2.78g/t Au and 0.73Moz Au Reserve 5.6Mt@ 2.31g/t Au and 0.41Moz Au (M&I) BLACK FOX MINE 7.0Mt@ 2.66g/t Au and 0.60Moz Au (Inferred) Resources2 225kt @3.93g/t Au and 28koz Au (Inf

  7. Slide 7: Project Location & Infrastructure

    Slide 7: Project Location & Infrastructure

    PROJECT LOCATION & INFRASTRUCTURE TILLEX PROJECT rsonal use only TIER-ONE LOCATION PROXIMITY ENERGY & TRANSPORT SKILLED WORKFORCE Located in prolific Tier-1 54km east of city of Timmins Tillex Project directly Timmins mining district, and ~38km from Discovery Timmins district offers ready accessible

  8. Slide 8: Phase 1 Drilling Completed

    Slide 8: Phase 1 Drilling Completed

    PHASE 1 DRILLING COMPLETED High-grade Copper & Silver Intersections rsonal use only • Phase 1 diamond drilling results released June 2026: multiple wide, high-grade copper intersections. Drilling also confirmed historical high-grade mineralisation, reinforcing the project’s strong expansion upside a

  9. Slide 9: Phase 2 Drilling Ongoing

    Slide 9: Phase 2 Drilling Ongoing

    PHASE 2 DRILLING ONGOING • 38.58m @ 1.0% Cu and 10.4 g/t Ag from 46.8m (TX26-012), including • 9.12m @ 1.47% Cu and 8.41 g/t Ag from 48.4m, and rsonal use only • 8.87m @ 1.63% Cu and 13.59 g/t Ag from 69.31m • 37.52m @ 1.35% Cu and 5.97g/t Ag from 53.48m (TX26-019) • 27.7m @ 1.51% Cu and 5.69g/t Ag

  10. Slide 10: Phase 2 Drilling Ongoing: Drill Plan

    Slide 10: Phase 2 Drilling Ongoing: Drill Plan

    PHASE 2 DRILLING ONGOING Phase 2 drilling to date Latest Phase-2 drilling results rsonal use only shown in red, previous Phase-2 results in black. Also showing pending and planned Phase-2 holes, plus Aruma Phase-1 and historic drilling collars. Image: Tillex Project TX26-010 drill core at 74.4m, dis

  11. Slide 11: Cross-Section: TX26-014 and TX26-015

    Slide 11: Cross-Section: TX26-014 and TX26-015

    CROSS-SECTION: TX26-014 AND TX26-015 Shallow, wide, high-grade mineralisation with new footwall targets rsonal use only • Mineralisation starts immediately beneath ~40m of overburden and dips at a relatively shallow angle, which suits ongoing drill testing. • TX26-014 intersected 27.7m @ 1.51% Cu an

  12. Slide 12: Drilling Highlights: TX26-010

    Slide 12: Drilling Highlights: TX26-010

    PHASE 2 DRILLING HIGHLIGHTS: TX26-010 Wide, high-grade copper intersection 100m south-west of the original high-grade zone rsonal use only • 27m @ 1.00% Cu and 3.92g/t Ag from 54m (TX26-010), including 17.85m @ 1.26% Cu and 4.53g/t Ag from 59.5m • Sulphide mineralisation intersected immediately from

  13. Slide 13: Drilling Highlights: TX26-012 and TX26-013

    Slide 13: Drilling Highlights: TX26-012 and TX26-013

    PHASE 2 DRILLING HIGHLIGHTS: TX26-012 AND TX26-013 Continues to validate Tillex’s expanding proof-of-scale rsonal use only • TX26-012 intersected: 38.58m @ 1.00% Cu and 10.4 g/t Ag from 46.8m • Plus, two deeper intersections: 0.34m @ 6.8% Cu and 48g/t Ag from 96.62m and 0.34m @ 15.5% Cu and 110g/t A

  14. Slide 14: Strategic Expansion Enhances Growth Potential

    Slide 14: Strategic Expansion Enhances Growth Potential

    STRATEGIC EXPANSION ENHANCES GROWTH POTENTIAL Three adjacent acquisitions expand project to ~29km² and extend the Tillex Trend to 3.2km rsonal use only • August 2026: 94 claims covering ~16km² adjacent to existing project area. Immediate targets; hole CUR35-02 returned 1.0m @ 0.49% Cu from 184m, wit

  15. Slide 15: Next Steps: Emerging District-Scale Copper-Silver System

    Slide 15: Next Steps: Emerging District-Scale Copper-Silver System

    NEXT STEPS: EMERGING DISTRICT-SCALE COPPER-SILVER SYSTEM Phase-2 drilling to continue to January 2027 rsonal use only • Drill results pending for six completed holes (TX26-016 to TX26-018, and TX26-021 to TX26-023), designed to extend the continuous high-grade strike a further ~85m to the south-west

  16. Slide 16: Aggressive Exploration Strategy to Drive Value

    Slide 16: Aggressive Exploration Strategy to Drive Value

    AGGRESSIVE EXPLORATION STRATEGY TO DRIVE VALUE The Tillex journey to date rsonal use only APRIL 2026 Phase 1 Diamond Drilling Campaign commences JUNE 2026 AUGUST 2026 Downhole EM confirms Expansion of Tillex Project JANUARY 2026 major conductor NOVEMBER 2026 Area – Acquisitions Tillex Copper-Silver

  17. Slide 17: Thank You

    Slide 17: Thank You

    rsonal use only THANK YOU CONTACT DETAILS Grant Ferguson, Managing Director Aruma Resources Limited Telephone: +61 401 479 740 Email: info@arumaresources.com ARUMA RESOURCES | ASX : AAJ | INVESTOR PRESENTATION 12 Nov 2026 17

  18. Slide 18: Historic High-Grade Intersections

    Slide 18: Historic High-Grade Intersections

    HISTORIC HIGH-GRADE INTERSECTIONS Discovered 1973; ~10,300m drilled by Metals Creek Resources since 2008 rsonal use only • 110m @ 1.69% Cu and 7.05g/t Ag from 34m (TX24-020), including • 28.72m @ 2.35% Cu and 9.52g/t Ag from 55m, and • 29m @ 2.64% Cu and 12.31g/t Ag from 100m • 98.2m @ 1.82% Cu and

  19. Slide 19: Historic High-Grade Intersections (Continued)

    Slide 19: Historic High-Grade Intersections (Continued)

    HISTORIC HIGH-GRADE INTERSECTIONS (CONTINUED) Highlight historic results rsonal use only • 42.46m @ 2.12% Cu and 53.45g/t Ag from 53.77m (TX11-008), including • 5m @ 5.55% Cu and 355.30g/t Ag from 89m, and • 36.25m @ 1.39% Cu and 14.96g/t Ag from 104m • 39.2m @ 1.91% Cu and 3.98g/t Ag from 31.8m (TX

  20. Slide 20: Wide High-Grade Copper-Silver Intersections

    Slide 20: Wide High-Grade Copper-Silver Intersections

    WIDE HIGH-GRADE COPPER-SILVER INTERSECTIONS rsonal use only Image: TX26-002 drill core (93.20m to 109.30m). Significant intersections shown at >0.2% Cu with a maximum of 2m internal dilution. ARUMA RESOURCES | ASX : AAJ | INVESTOR PRESENTATION 12 Nov 2026 20

  21. Slide 21: References

    Slide 21: References

    REFERENCES FOR SLIDE 7 rsonal use only 1. Discovery Silver Corp. (2026) Discovery Completes Acquisition of Kidd Operations. News release, 1 June. Toronto: Discovery Silver Corp. Available at: https://s21.q4cdn.com/713783313/files/doc_news/2026/06/pr-Kidd-Closing-June-1-2026-FINAL.pdf (Accessed: 12 N

Source: ASX announcement, Nov 25, 2026