Td Power Systems Limited · NSE:TDPOWERSYS

Td Power Systems — Q1 FY2025 Earnings Presentation

29 slides from Td Power Systems's earnings presentation, Aug 13, 2024

  1. Slide 1: Investor Presentation for the period ended June 30, 2024

    TD Power Systems Limited (CIN -L31103KA1999PLC025071) REGISTERED OFFICE & FACTORY: 27, 28 and 29, KIADB Industrial Area August 13, 2024 Dabaspet, Nelamangala Taluk Bengaluru Rural District Bengaluru – 562 111 India Tel +91 80 229 95700 / 6633 7700 Fax +91 80 7734439 / 2299 5718 The Corporate Service

  2. Slide 2: TD Power Systems Limited Investor Presentation – August 2024

    is sharing is relations is power is generating solutions Manufacturers of AC Generators up to 250MVA TD Power Systems Limited Investor Presentation – August 2024

  3. Slide 3: Safe Harbor

    Safe Harbor This presentation and the accompanying slides (the “Presentation”), which have been prepared by TD Power Systems Limited (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for any secu

  4. Slide 4: TD Power at a Glance

    TD Power at a Glance State of art manufacturing facilities with automated process for quality, reliability & efficiency. Diversified product portfolio customized for a wide range of turbines (steam, Core Manufacturing company in power sector with gas, hydro and wind) and engines (diesel and gas). Sp

  5. Slide 5: TD Power's Evolution & Journey

    TD Power’s Evolution & Journey TDPS starts its Increases footprint in operations in the European and Achieved Highest Acquires technology Achieves Leadership Listing of TDPS on Europe & USA Turkish Market Revenue since inception from Toyo Denki Japan position in India BSE & NSE 1999 2002-09 2011 201

  6. Slide 6: Diversified Products for Multiple End User Industries

    Diversified Products for Multiple End User Industries Motors Generators for Turbines 3 3 3 3 Steam - upto 250MVA Gas - upto 250MVA Hydro - upto 45MVA Wind* Induction Motors Generators for We deliver world class Engines 3 3 Generators for the World Diesel - upto 25MVA Gas - upto 25MVA Synchronous Mot

  7. Slide 7: State of Art Manufacturing Facilities

    State of Art Manufacturing Facilities… Manufacturing units with Advanced Machines help in delivering Competitively Priced products with the Highest Quality Standards Unit I - 157,624 Sq Ft Unit II – 219,756 Sq Ft Large Generator Factory – 78,449 Sq Ft TDPS Turkey • Core building, Coil making, Windin

  8. Slide 8: …with Automated & Integrated Processes

    …with Automated & Integrated Processes Manufacturing Facilities Test Facilities Varnishing Line Robotic Core Stacking Coil Stretching Unit Tapping Machine CMM State of the art Stator Automatic Stator core Guarantees speed, Completely robotic with Co-ordinate Measuring Machine with least count of 0.1

  9. Slide 9: Certification of Excellence

    Certification of Excellence ISO Certification Product Certification International Certification ISO 9001: 2015 DNV CE/UKCA Quality Management System Wind Generators European Market ATEX GOST R/TRCU Hazardous Application Generators Russian Market ISO 14001: 2015 Environment Management System Lloyd’s

  10. Slide 10: Quality Assurance

    Quality Assurance Quality assurance policy aimed towards Supplier performance improvement Fastest Process in Industry On-Time delivery Production of world class Reduction of wastage generators Quality Assurance Procedures for ensuring quality management processes at various stages Quality & Reliabil

  11. Slide 11: Summary of Installations: 6,419 Generators across 109 Countries

    Summary of Installations 6,419 Generators installed* across 109 Countries 272 798 51 4,857 279 162 *Since inception 10

  12. Slide 12: Number of Generators installed

    Number of Generators installed FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 Total CAGR Additions ~11% 298 341 319 352 392 411 350 326 459 521 496 243 6,297 227 190 253 126 294 Domestic 156 3,738 233 269 Exports (Incl. Deemed Exports) 149 200 (59%) 147 194 187 178 177 243 199 205 2,032 132

  13. Slide 13: Service Centers Across the Globe for On-Time Assistance

    Service Centers Across the Globe for On-Time Assistance Centers across continents: Asia (11), Europe (15), South America (6), Australia (8), Africa (4), 52 Centers World-Wide North America (8) Local Service Representative to At site 24-48 Hours from the time overcome language barrier and to of issue

  14. Slide 14: Our CSR Initiatives

    Our CSR Initiatives Integrated Water & Sanitation Management In line with the CSR policy revised in 2021, TDPS supported initiatives focusing on Education and Education related Infrastructure and welfare • This project was supported for over 5 years starting from 2015 and was undertaken in Tyamagond

  15. Slide 15: Board of Directors

    Board of Directors Nikhil Kumar Mohib N. Khericha Mrs Prabhamani Managing Director Promoter and Non- Non-Executive Director Engineering & Executive Chairman General Management Program B. Com, FCA from Harvard Responsible for overall management of the Company’s He was in practice for over 25 years, i

  16. Slide 16: Experienced Management Team

    Experienced Management Team Nikhil Kumar - Managing Director Leads operations, strategic planning, technology alliances, sales and marketing. With an in-depth understanding of products, processes, customers, specific application requirements of each segment from over 3 decades of work experience in

  17. Slide 17: Financial Section

    Financial Section

  18. Slide 18: Q1FY25 Key Operational & Financial Highlights

    Q1FY25 Key Operational & Financial Highlights Generators Supplied in Q1FY25 (in Nos) Order inflow during Q1FY25 (Rs. in Mn) Diversified Order Book as on 30th June 2024 (Rs. in Mn) Highest Ever 166 Quarterly 160 Order Inflow 3,943 25.4% Total Order 5,236 Book: 124 122 2,968 Rs. 12,150 Mn 2,366 66 77

  19. Slide 19: Q1FY25 Consolidated Financial Highlights

    Q1FY25 Consolidated Financial Highlights Total Income* (Rs. in Mn) EBIDTA* (Rs. in Mn) PAT (Rs. in Mn) 24.1% 24.5% 32.6% 2,742 488 353 2,209 392 267 Q1FY24 Q1FY25 Q1FY24 Q1FY25 Q1FY24 Q1FY25 Gross Profit Margins* (%) EBIDTA Margins* (%) PAT Margins (%) -30 bps +5 bps +80 bps 36.3% 36.0% 17.8% 17.8%

  20. Slide 20: Q1FY25 Consolidated Profit & Loss Account

    Q1FY25 Consolidated Profit & Loss Account Particulars (Rs. in Mn) Q1FY25 Q1FY24 Y-o-Y Q4FY24 Q-o-Q Revenue from Operations 2,737.8 2,202.9 2,638.9 Other Operational Income 4.0 5.7 16.7 Total Income 2,741.8 2,208.6 24.1% 2,655.7 3.2% Cost of Goods Sold 1,755.1 1,407.3 1,682.6 Gross Profit 986.6 801.3

  21. Slide 21: Historical Financial Highlights

    Historical Financial Highlights Total Income* (Rs. in Mn) EBIDTA* (Rs. in Mn) PAT (Rs. in Mn) 17.7% 10,005.2 1,720.9 1,183.5 8,833.1 8,059.6 45.1% 1,412.3 41.0% 968.1 5,948.1 1,004.2 706.5 5,204.8 671.7 452.0 387.9 299.4 FY20 FY21 FY22 FY23 FY24 FY20 FY21 FY22 FY23 FY24 FY20 FY21 FY22 FY23 FY24 EBID

  22. Slide 22: Historical Consolidated Profit & Loss Account

    Historical Consolidated Profit & Loss Account Particulars (Rs. in Mn) FY24 FY23 FY22 FY21 FY20 CAGR Revenue from Operations 10,005.2 8,723.0 7,974.2 5,935.8 5,148.9 Other Operational Income 47.0 110.1 85.4 12.2 55.8 Total Income 10,052.2 8,833.1 8,059.6 5,948.1 5,204.8 17.9% Cost of Goods Sold 6,551

  23. Slide 23: Key Takeaways

    Key Takeaways Automated & Integrated State of the art manufacturing facilities for Investment in Automation to Revival in the Domestic market Continuous replacement demand better Efficiency & operating augment existing capacities and with increased Brand Recognition for Generators installed over the

  24. Slide 24: Annexures: Our Prestigious Projects

    Our Prestigious Projects ANNEXURES: 23

  25. Slide 25: Gas Engine Generators

    GAS ENGINE GENERATORS ❖ TDPS has supplied more than 500 Gas Engine Generators to a Major Engine Manufacturer for their J612 (2.5MVA), J616 (2.5MVA), J620 (4.5MVA), J624 (6.36MVA) and J920 (15MVA) series ❖ Gas engine generators need stringent design requirements which has to accommodate high vibratio

  26. Slide 26: Geothermal

    Geothermal ❖ The picture on the left from a Geo Thermal Power Plant of capacity 29.7MVA installed in Turkey ❖ Geo Thermal Generators are specially designed for outdoor installation and to withstand H2S content at site ❖ TDPS has supplied several Geo Thermal Generators to a major Geo-Thermal OEM in t

  27. Slide 27: Diesel Engine Generators

    Diesel Engine Generators ❖ TDPS has supplied Nine Generators of 8.586MVA in UAE ❖ The generators are coupled with Engines manufactured by a Major Engine manufacturer ❖ These generators are installed in a barge and are used for desalination purposes in order to provide drinking water 26

  28. Slide 28: Steam & Gas Turbine Generators

    Steam & Gas Turbine Generators BIOCEL PASKOV MAXAU Mobile Powe Units ❖ 22MVA Generator, installed in Czech ❖ This 67.5MVA Generator, installed in ❖ 5.25MVA Generator coupled to Turbine Republic Maxau, Germany, is the largest 4 pole manufactured by a major turbine Generator manufactured by TDPS. manu

  29. Slide 29: Contact Us

    Contact Us TD Power Systems Limited CIN: L31103KA1999PLC025071 Ms. M N Varalakshmi – Chief Financial Officer Varalakshmi@tdps.co.in www.tdps.co.in Strategic Growth Advisors Private Limited CIN: U74140MH2010PTC204285 Mr. Sagar Shroff/Mr. Nishant Dudhoria sagar.shroff@sgapl.net / nishant.dudhoria@sgap

TD Power Systems — Q1 FY2025 Earnings Presentation on 6ix