Duketon Mining Ltd · ASX:DKM
Duketon Mining — Investor Presentation (October 2014)
18 slides from Duketon Mining's investor presentation, Oct 16, 2014
Slide 1: Investor Presentation: Growing Nickel Resources in WA
For personal use only Investor Presentation ‘Growing Nickel Resources in WA’ Investor Presentation June 2014 Stuart Fogarty, Managing Director October 2014 www.duketonmining.com.au
Slide 2: Duketon Mining Ltd
DUKETON MINING LTD For personal use only Nickel resource inventory with significant potential to grow – RIGHT COMMODITY Enterprise Value of $3.0 million – LOW ENTRY PRICE / SIGNIFICANT UPSIDE Cash (+ liquids) balance of $9.0 million following successful $7.0 million IPO – WELL FUNDED Managin
Slide 3: Corporate Structure
CORPORATE STRUCTURE For personal use only Duketon Mining Ltd. Shareholders Number of shareholders 1126 Shares on Issue 82.5m Board and Management 11% Options on Issue1 33.3m Top 20 48.3% Market Cap. @ 14.5c $12m Cash + Listed Investments $9m Enterprise Value $3m 1. Volume weighted exercise price of
Slide 4: The Duketon Project (100%)
THE DUKETON PROJECT (100%) For personal use only 4.
Slide 5: Large Tenement Position
LARGE TENEMENT POSITION RXL DUKETON MINING LIMITED REGIS RESOURCES LIMITED For personal use only 5.
Slide 6: The Bulge Ultramafic Complex
THE BULGE ULTRAMAFIC COMPLEX For personal use only Mining Lease granted Craton size feature Limited exploration outside resource areas Ni Discovered mid 2000s 2006 at C2 2009 at Rosie Less than 10% of prospective contact explored Rosie Ni Resource in 2012 33kt of Ni metal 8kt of Cu m
Slide 7: Rosie Nickel – 1st Program Completed
ROSIE NICKEL – 1st Program Completed For personal use only 7.
Slide 8: Terminator Gold Longsection
TERMINATOR GOLD LONGSECTION For personal use only 8.
Slide 9: The Bulge Potential
THE BULGE POTENTIAL For personal use only Limited exploration outside of current resource areas Possible new nickel camp C2 + Rosie + untested potential Further drilling planned late 2014/early 2015, testing potential new areas and open mineralisation OPEN OPEN OPEN 9.
Slide 10: Thompson Bore Gold Prospect
THOMPSON BORE GOLD PROSPECT For personal use only Identified through lag sampling (geochem) Anomalous over 700m strike Initial drill program results include: 4m @ 8.60 g/t Au 3m @ 2.76 g/t Au 4m @ 1.64 g/t Au 11m @ 1.04 g/t Au 10.
Slide 11: Objectives & Upcoming Activity
OBJECTIVES & UPCOMING ACTIVITY For personal use only What 1. Add lateral extension to Rosie high grade (extensional drilling) Grow HG inventory Add Ni T per vertical meter Investigate PGE concentrate possibilities 2. Find additional resources (extensional/exploration drilling) The Bulge (Ni)
Slide 12: Contact Details
Contact Details For personal use only Duketon Mining Ltd. Head Office Phone +61 8 6315 1490 Ground Floor, 31 Ventnor Fax +61 8 9486 7093 Avenue, West Perth Web: www.duketonmining.com.au Western Australia 6005 12.
Slide 13: Appendix 1. JORC Resource
Appendix 1. JORC Resource For personal use only Rosie Nickel Resource >1.0%Ni - September 2012 Classification Oxidation Tonnes Ni (%) Ni (t) Fresh 1,380,000 1.7 23,700 Indicated Transitional 30,000 1.2 400 Sub-Total 1,410,000 1.7 24,100 Fresh 520,000 1.6 8,400 Inferred Transitional 10,000 1.3 200 Su
Slide 14: App 2. C2 Nickel Mineralisation
App 2. C2 NICKEL MINERALISATION For personal use only 700m long and open along strike and down dip +3%Ni intersection, entrained sulphides = potential for massive sulphide position Resource estimation 2011 Mix of RC and DD holes define the mineralisation 14.
Slide 15: App 3. C2 Cross Section
App 3. C2 Cross Section For personal use only Three well developed lenses Open at depth Entrained sulphides 15.
Slide 16: App. Zinc Projects – Possible VMS
App. 4 Zinc Projects – Possible VMS Explored for base metals mid 1970’s For personal use only to early 1980’s Complex geology Area suitable for ground EM and soil sampling programs to generate targets Historic best drill results include; 1m @ 12% Zn, 0.68% Pb, 7g/t Ag 0.2m @ 9.6 % Zn, 2.
Slide 17: App. Hacks Bore Ni Prospect
App. 5 Hacks Bore Ni Prospect Aircore drilling – circa. 2007 for Au For personal use only Drill results include; HBAC048: 7m @ 1.33% Ni, 0.31% Co Re-assayed for Ni late 2007 HBAC004: 5m @ 1.06% Ni, 0.05% Co HBAC047: 5m @ 0.99% Ni, 0.09% Co Ground MLTEM survey mid 2008 and modelled by
Slide 18: Disclaimer
Disclaimer For personal use only Disclaimer: This presentation has been prepared by Duketon Mining Limited(“Duketon”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties an
Duketon Mining — Investor Presentation (October 2014) on 6ix