Duketon Mining Ltd · ASX:DKM

Duketon Mining — Investor Presentation (October 2025)

15 slides from Duketon Mining's investor presentation, Oct 30, 2025

  1. Slide 1: Advancing Gold Assets Across Western Australia

    For personal use only Advancing Gold Assets Across Western Australia October 2025 Image result for Linkedin icons ASX:DKM www.duketonmining.com.au

  2. Slide 2: Cautionary Statement

    Cautionary Statement This presentation has been prepared by Duketon Mining Limited (“Duketon”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been For personal use only derived from third parties and

  3. Slide 3: Company Snapshot

    Company Snapshot About Duketon Mining Shareholder Information - as at September 2025 For personal use only Duketon Mining Limited is a Western Harmanis Australian focused mineral resources, 18.4% Holdings exploration and development company with gold, nickel and base metal 9.2% Institutional Holder

  4. Slide 4: DKM Value Proposition

    DKM Value Proposition • Gold Projects 100% DKM For personal use only • Kilarney Gold Project – recent discovery with drilling continuing • Barlee Gold Project – long term tenement build with multiple strong, large geochem anomalies (no historical drilling ) – 60km strike • Boodanoo Gold Project – 2k

  5. Slide 5: Killarney - Well Located

    Killarney - Well Located For personal use only • 8kms from sealed road on well maintained gravel roads and station tracks • 76kms from Mount Magnet on bituminised road • 77kms from Sandstone www.duketonmining.com.au

  6. Slide 6: Killarney RC Drill Results

    Killarney RC Drill Results • Historic rock chips For personal use only • 485g/t Au, 422g/t Au, 394g/t Au, 326g/t Au, 283g/t Au • Significant Intercepts include: • 10m @ 2.33g/t Au including 3m @ 7.24g/t Au • 9m @ 4.64g/t Au including 1m @ 39.77g/t Au • 9m @ 2.12g/t Au including 3m @ 5.5g/t Au • 7m @

  7. Slide 7: Killarney RC Drill Results

    Killarney RC Drill Results For personal use only www.duketonmining.com.au

  8. Slide 8: Killarney RC Program

    Killarney 2 RC Program nd • Drilled another 20 holes – 1,560m For personal use only • Testing along strike of previous results • Testing several Geochem anomalies • Testing south- east corner prospect • Similar zones of heavily weathered ferruginous saprolite - with variable quartz veining • Results

  9. Slide 9: Barlee

    Barlee • Large land holding within the For personal use only Marda-Diemals Greenstone Belt • 175kms north of Southern Cross • 100kms south of Penny Mine • Two granted tenements and three applications covering 510 sq km • Multiple large high amplitude geochem anomalies – no drilling on E77/3160 • Nei

  10. Slide 10: Barlee Geochemistry

    Barlee Geochemistry • Regolith sampling program completed, For personal use only 1500 samples • Lost Bolt - 1.7km x 1km max 211ppb Au • Odie - 350m x 250m max 37ppb Au • Astro -1.8km x 800m max 204ppb Au (before going undercover) • Scooby - 900m x 450m max 57ppb Au • Tiger - 1.2km x 700m max 230ppb

  11. Slide 11: Boodanoo

    Boodanoo • Located 80km SSE of Mount For personal use only Magnet • Granted tenement covering 47 sq km • 2km long gold in soil anomaly - no drilling • Infill geochemical sampling completed, awaiting assays • Recent mapping giving further insights into prospectivity www.duketonmining.com.au

  12. Slide 12: Work Program 2025

    Work Program 2025 July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Killarney Gold Project For personal use only Assay Drill Samples Underway RC Drill Program Barlee Gold Project Infill Regolith Sampling ✓ Assay Regolith Samples ✓ Plan Drilling ✓ Heritage Survey PoW application Aircore Program Assay

  13. Slide 13: Concluding Remarks

    Concluding Remarks • Discovery options further enhanced For personal use only • Building out and exploring gold portfolio – multiple projects, different stages • Remainder of portfolio multi-commodity – Ni, Cu, PGE • Leverage retained through tight capital structure • 122M shares on issue • Cash and

  14. Slide 14: Statements

    Statements For personal use only Forward Looking Statements Competent Person Statement This presentation has been prepared by Duketon Mining Limited(“Duketon”). The information in this release that relates to exploration results is based on The information contained in this presentation is a profess

  15. Slide 15: Rosie and C2

    Rosie and C2 For personal use only www.duketonmining.com.au

Duketon Mining — Investor Presentation (October 2025) on 6ix