Magna Mining Inc · TSX:NICU

Magna Mining — Investor Presentation (February 2025)

24 slides from Magna Mining's investor presentation, February 2025

  1. Slide 1: Copper & Nickel Production in North America's Premier Mining District

    TSXV: NICU OTC: MGMNF COPPER & NICKEL PRODUCTION IN NORTH AMERICA’S PREMIER MINING DISTRICT February 2025 September [•], 2024 www.magnamining.com

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS Cautionary Statement Regarding Forward-Looking Information This presentation contains forward-looking information and forward-looking statements (collectively, "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements, other

  3. Slide 3: The Sudbury Advantage

    THE SUDBURY ADVANTAGE OVER 100 YEARS OF MINING PRODUCTION INFRASTRUCTURE & PROCESSING FACILITIES LOW-COST ACCESS TO EXPLORATION AND DEVELOPMENT SOCIAL LICENSE TO OPERATE WORLD CLASS MINERAL ENDOWMENT

  4. Slide 4: Magna Mining Growth Pipeline

    MAGNA MINING GROWTHPIPELINE GROWTH PIPELINE 0 EXPLORATION PROVEN MANAGEMENT TEAM Upon closure of the KGHM transaction, Magna will operate the producing McCreedy Many of Magna’s executive team have Sudbury has precedent for the discovery of West Copper mine, plus 4 additional past- extensive experien

  5. Slide 5: Magna Property Locations

    MAGN PRA OPPREORPTEYR LT O Y CLAOTCI O A TNI O N S NORTHWEST FOY WISNER NORTH RANGE PARKIN PODOLSKY LEVACK Glencore FROST LAKE Strathcona Mill McCREEDY WEST BLEZARD WINDY LAKE Glencore Falconbridge Smelter Azilda FALCONBRIDGE FW TRILL Callum Vale Clarabelle Mill Vale Copper Cliff Smelter KIRKWOOD Ci

  6. Slide 6: Combined Resources

    COMBINED RESOURCES • 780 million lbs of copper Total Contained Metal in NI 43-101 • 742 million lbs of nickel Compliant Resources • 2.6 million ounces of precious metals (Pt, Pd + Au) • 2.8 billion lbs of copper equivalent (Cu Eq) Additional Contained Metal in • 270 million pounds copper • 337 milli

  7. Slide 7: Magna Mining's Production Pipeline

    MAGNA MINING’S PRODUCTION PIPELINE Pipeline of projects: Magna now has a portfolio of low capex, Production MCCREEDY WEST brownfield or past producing assets that can provide a platform for significant production growth for the next 5 years LEVACK CREAN HILL Permitted Bootstrapped production plan: S

  8. Slide 8: Magna's Focus for 2025

    MAGNA'S FOCUS FOR 2025 • Optimizing systems for efficiency, reliability and productivity OPTIMIZE McCREEDY WEST • Develop a mine plan driven by high grade copper mining, with optionality for nickel mining FOR CASH FLOW & SUSTAINABLE PRODUCTION • Production ramp up from 330k tonnes per annum (tpa) to

  9. Slide 9: McCreedy West Mine 2025 Mine Plan

    McCREEDY WEST MINE 2025 MINE PLAN IMPROVED MINE PLAN UNDER DEVELOPMENT: Magna is working with the McCreedy West management team to develop a new plan for 2025 which incorporates both recent drilling from KGHM and drilling directed by Magna Mining in December 2024. PRODUCTION FORECAST for 2025 is exp

  10. Slide 10: McCreedy West 2025 Mine Plan: High Grade Pillars

    McCREEDY WEST 2025 MINE PLAN Main Orebody High Grade Pillars Plan View High grade pillars that remain at McCreedy West between cemented sandfill could offer an opportunity to add additional high-grade tonnage within the first 12 months These pillars are located at shallow depths and remain accessibl

  11. Slide 11: Copper vein extensions on periphery of prior INCO mining

    McCREEDY WEST 2025 MINE PLAN Copper vein extensions on periphery of prior INCO mining Copper vein extensions on periphery of prior INCO mining Copper rich veins extending into the footwall in proximity to existing workings Strong potential for significant resource expansion Potential to add in addit

  12. Slide 12: Updating Current Stope Designs

    McCREEDY WEST MINE 2025 MINE PLAN Updating Current Stope Designs Updating Current Stope Designs Mined Stopes Magna is reviewing current stope designs and optimizing based on: • Utilizing geological vein trends to guide block model and development • Develop stope accesses in ore rather than waste to

  13. Slide 13: McCreedy West - Levack Footwall Exploration Potential

    McCREEDY WEST - LEVACK FOOTWALL EXPLORATION POTENTIAL FNX30678 30.3% Cu, 4.0 g/t Pt+Pd+Au over 0.6 m 700 Cu Zone PM Zone Morrison Deposit FNX20578 FNX7150 14.3% Cu, 3.4% Ni, 4.0% Ni, 3.1% Cu, 23.5 g/t Pt+Pd+Au 31.4 g/t Pt+Pd+Au over 1.7 m over 1.9 m * For more information, please refer to the news r

  14. Slide 14: Levack Opportunity – Keel Zone

    LEVACK OPPORTUNITY – KEEL ZONE Keel Zone, Oblique View Location of Keel Zone, Levack Mine Keel 20.6% Cu, 1.0% Ni, 5.1 g/t TPM over 27.9 ft 28.9% Cu, 0.1% Ni, 7.6 g/t TPM over 3.3 ft Under Explored Under- Explored 31.0% Cu, 0.3% Ni, 12.4 g/t TPM over 4.5 ft Morrison Deposit 19.4% Cu, 1.2% Ni, 7.7 g/t

  15. Slide 15: A Track Record of Efficient Capital Allocation

    A TRACK RECORD OF EFFICIENT CAPITAL ALLOCATION Capital Raised Date (C$ million) Use of Proceeds Equity Debt Shakespeare acquisition & 2017 to 2021 5 general corporate purposes May-21 7 RTO & general corporate purposes Nov-21 3.1 Exploration (flow-through) Nov-22 20 Crean Hill acquisition Jan-23 18 E

  16. Slide 16: Capital Structure

    CA P ITA L ST R U CT URE Management & Directors C U R R E N T CA P I TA L ST R U CT U R E 9% Institutional Retail 1 ~53% Issued & Outstanding 194,759,418 ~37% Options & RSU’s 12,704,400 Warrants 2 26,181,360 TOP SHAREHOLDERS Fully Diluted 233,645,178 Dundee Corporation 22% Hawkes Point LLC 11% Cash3

  17. Slide 17: Why Invest in Magna Mining

    WHY INVEST IN MAGNA MINING PRODUCING COMPANY IN Q1 2025 – POTENTIAL RE-RATING EXPLORATION RESULTS IN Q1 2025 PIPELINE OF PROPERTIES AND THE POTENTIAL FOR ‘BOOTSTRAPPED’ ORGANIC GROWTH POTENTIAL FOR ADDITIONAL SYNERGISTIC ACQUISITIONS

  18. Slide 18: Mining For Our Future

    MINING FOR OUR FUTURE TSXV: NICU OTC: MGMNF Jason Jessup, CEO Paul Fowler, Senior Vice President www.magnamining.com Jason.Jessup@magnamining.com Paul.Fowler@magnamining.com

  19. Slide 19: Management

    MANAGEMENT Jason Jessup, MBA - CEO & Director Jason has over 25 years of experience in the mining industry comprising operations management, corporate development and project evaluation. Formerly FNX Mining, Sandstorm Gold, Premier Royalty, and INCO. Paul Fowler, CFA - Senior Vice President Paul is

  20. Slide 20: Directors and Strategic Advisors

    DIRECTORS AND STRATEGIC ADVISORS V e r n B a k e r , P .E n g . , M B A C h a i r m a n Vern has +30 years of experience in the mining sector. He is currently the CEO of Jaguar Mining (TSX), previously served as General Manager of Goldcorp’s Cerro Negro Mine, VP Operations at FNX Mining, and Preside

  21. Slide 21: Our Experience at McCreedy West & Levack

    OUR EXPERIENCE AT McCREEDY WEST & LEVACK Magna Mining COO Jeff Huffman, in a CEO Jason Jessup and Jeff Huffman in a Morrison Deposit mechanized cut & fill stope footwall copper stope at MCW in 2010 captive cut & fill stope in the Morrison circa 2010 deposit in 2011. 21 Photo credits: Steve Clapp, Cr

  22. Slide 22: KGHM Acquisition - Mineral Resources

    KGHM ACQUISITION - MINERAL RESOURCES NI 43-101 MINERAL RESOURCE ESTMATE McCreedy West Underground Mineral Resource Estimate, Dec 31, 20231 Cut-off Grade Tonnes Ni % Cu % Co % Pt g/t Pd g/t Au g/t Ag g/t Ni Eq % NiEq (%) Indicated 1.10 9,345,000 0.89 1.30 0.024 0.96 1.10 0.45 5.28 2.02 Inferred 1.10

  23. Slide 23: McCreedy West Mineral Resources

    McCREEDY WEST MINERAL RESOURCES MCCREEDY WEST NI 43-101 MINERAL RESOURCE ESTMATE BY ZONE 1 700 Zone Cut-off Grade Tonnes Ni % Cu % Co % Pt g/t Pd g/t Au g/t Ag g/t NiEq % NiEq (%) Indicated 1.1 5,230,000 0.7 1.92 0.014 1.08 1.17 0.57 6.48 2.16 Inferred 1.1 63,000 1.63 1.23 0.04 0.4 0.43 0.1 0.82 2.4

  24. Slide 24: Notes on McCreedy West and Historical Mineral Resources

    NOTES ON McCREEDY WEST AND HISTORICAL MINERAL RESOURCES McCreedy West Property Mineral Resource Estimate Notes: 1. The effective date of the McCreedy West Property Mineral Resource Estimate (MRE) is December 31, 2023. This is the close out date for the final mineral resource models and mine out mode

Magna Mining — Investor Presentation (February 2025) on 6ix