Barys Resources Limited · ASX:BRY

Barys Resources — ENRG Elements — Investor Presentation (May 2023)

22 slides from Barys Resources's investor presentation, May 3, 2023

  1. Slide 1: Uranium & Copper for a Clean Energy Future

    A genre For personal use o Uranium & Copper for a Clean Energy Future INVESTOR PRESENTATION May 2023 ASX:EEL OTCQB:EELFF

  2. Slide 2: Legal Information

    Legal Information 4ENRG elements Summary Information This presentation ("Presentation") has been prepared and authorised for release by the Board of ENRG Elements Limited (“ENRG" or the “Company’). This Presentation provides a summary on ENRG, its subsidiaries and its Niger and Botswana projects, wh

  3. Slide 3: Uranium & Copper: Critical Components for a Green Future

    Uranium & Copper Critical Components for a Green Future ENRG has a diversified portfolio with direct exposure to key clean energy minerals ASX:EEL OTCQB:EELFF Agadez Uranium Project - Niger + Located in the highly prospective Tim Mersoi Basin of Niger + Updated Inferred Mineral Resource of 31.1Mt at

  4. Slide 4: Positioned for Significant Growth

    Positioned for Significant Growth 2 Sg 8 Transformed @ company Focus 5 Diversified asset base __|_ containing minerals, uranium and copper, ¢ both critical for a @ clean energy future Attractive Investment Opportunity Strong Leadership Team Highly experienced Board and Management team to guide ENRG,

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot Capital Structure Management and Board > ASX Code ASX: EEL <c> Share Price $0.018 ro) Shares on Issue” 929m Market Capitalisation” $16.7m g Cash® $1.54m = Options | Perf. Shares / Perf. Rights") 201m & : are Price Performance oO ASX:EEL Sh PI Perf share Price (a$) Volume (M) g 0.0

  6. Slide 6: For personal use only

    • • • • • • • For personal use only

  7. Slide 7: 2022 Exploration Program: Drill Program Results

    only 2022 Exploration Program Drill Program Results Exploration program completed during 2022 at the Takardeit Deposit comprising of mud rotary & diamond core drilling, in conjunction with a surface sampling program The ~5,500m drilling program confirmed mineralisation from surface to ~40m © depth a

  8. Slide 8: Takardeit — 2022 Drilling Program

    Takardeit — 2022 Drilling Program Pent tenements | Ekazan 1 application Mineralised domain (MRE) ‘updated JORC (2012 (7777 Outcropping boundary of t ‘the roof of Teloua 3 i (dipping west) Fault Lines Deep holes B Diamond holes ‘Unmineralised Drill Hole © ennc 2022 © Indo Energy - Paladin 2011 © Indo

  9. Slide 9: 2022 Exploration Program: Rock Chip Sampling Program Results

    2022 Exploration Program Rock Chip Sampling Program Results + The rock chip sampling program focused on several areas identified by airborne radiometric geophysical surveys and historic sampling Assay results from rock chip sampling program at Agadez returned outstanding results, with significant as

  10. Slide 10: Agadez Exploration Target Identified

    e only personal us For Agadez Exploration Target Identified (GENRG elements Exciting exploration target identified Exploration Target An exploration target has been defined, based on a combination of the historical drilling, likely locations of mineralisation within the tenements and analysis of the

  11. Slide 11: Planned Exploration Work

    Planned Exploration Work G ENRG ° ° elements Drill program for next phase of exploration =" Drilling program has been developed for the next phase of exploration at Agadez: - 379 drill holes for a total of 20,165m") — Average hole depth of 53m se only 5 - Implemented in stages across multiple identi

  12. Slide 12: Agadez — Underexplored Project in World Class Uranium Basin

    Agadez — Underexplored Project in World (GENRG Class Uranium Basin elements Completed 100% acquisition of prospective tenements close to producing and developing mines Cc (e) g ® 12) =) Landholding across three In last 12 months doubled Exploration target of >34% U,O, highest assay Located in the Ti

  13. Slide 13: Botswana — Ghanzi West Project

    Botswana — Ghanzi West Project CGENRG elements Underexplored world-class copper Province in the Kalahari Copper Belt _ Te ; = = = located along strike from Sandfire’s copper-silver Motheo Mine (under construction) and A4 deposit mMaun =| BOTSWANA Zones Deposit 123 Prospect ‘92.1Mt @ 2.2% Cu & 22.18/

  14. Slide 14: Ghanzi West: Airborne EM & Gravity Survey and 2023 IP Survey

    Botswana — Ghanzi West Project 2022 Airborne Electromagnetic & Gravity Survey and 2023 IP Survey airborne Electromagnetic and Gravity Survey completed in October © 2022 across the Kara Antiform on the Ghanzi West Project in the (o) emerging world class Kalahari Copper Belt of Botswana (a) Survey ide

  15. Slide 15: For personal use only

    For personal use only • • • ✓ ✓ ✓ ✓ ✓ ✓ • • ✓ ✓

  16. Slide 16: For personal use only

    • • • For personal use only • • • • • •

  17. Slide 17: For personal use only

    4ENRG elements ASX:EEL Suite 10, 44 Kings Park Rd West Perth, WA 6005 info@enrg-elements.com www.enrg-elements.com +61 8 6263 4400

  18. Slide 18: Appendix

    ‘e. CGENRG | APPENDIX he

  19. Slide 19: ENRG Tenements

    • • • • • For personal use only ENRG Tenements

  20. Slide 20: Improved Understanding on Regional Geology

    Improved Understanding on Regional Geology CGENRG elements i Figure 9: = smn, !dealized geological Sw- & NE section across Takardeit deposit area.) 1,881,000mN 369,000mE 1,882, 000mN 370,000mE, 1,883,000mN 1,885,000mN 72,000mE: 1,886,000mN 373,000mE 1.597, 000mN 1,834,000mN 3 rele 367,000m z “eo | W

  21. Slide 21: Uranium Demand

    Uranium Demand G ENRG Uranium is a key component for the global transition to elements clean energy >Vranium Market Fundamentals Uranium Supply Deficit © Global electrification + The World Nuclear Association predicts a ~40% increase in uranium demand and ~20% fo) Government policies to reach net ze

  22. Slide 22: Is This the Start of the Next Uranium Bull Market?

    Is This Bull Market? a Cc 200 [e) oO g 150 > ¢ © 3 Si O £ wo Y 8 Mo «& a ¢ =) ro} 50 LL 0 Aug 68 the Start of the Next Uranium G ENRG elements U,0, Price Chart Bull Market 1 Bull Market 2 Jan. '73 to May ‘78 Dec. '00 to June '07 Bull Market 3? +629%|5.3 yrs +1,801%16.5 yrs 2003-2007: Commodity Super

ENRG Elements — Investor Presentation (May 2023) on 6ix