Maritana Minerals Limited · ASX:MRT

Maritana Minerals — Horizon Minerals — Shareholder Meeting (November 2025)

28 slides from Maritana Minerals's shareholder meeting presentation, Nov 28, 2025

  1. Slide 1: Annual General Meeting 2025

    For personal use only Annual General Meeting 2025 28 November 2025

  2. Slide 2: Important disclaimers

    Important disclaimers Nature of Document estimated results, and may cause the Company’s actual performance and financial results in future periods to This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders, materially differ from any projections

  3. Slide 3: Investment proposition

    Investment proposition Projects An attractively priced West Australian gold Regional Landholding developer with near-term growth +1,300km² Carnarvon Mineral Resource* Estimate 1.8Moz 29.62Mt @ 1.85g/t Au For personal use only Currently producing gold and cash flow 20.2Moz Ag 104kt Zn through a combi

  4. Slide 4: Horizon Minerals – at a glance

    Horizon Minerals – at a glance An attractively priced West Australian gold developer with near-term growth For personal use only Capital structure Units Current Volume Price $0.10 100 Million Share price $/sh 0.073(1) $0.08 80 Ordinary shares M 2,994.7(2) Options and performance rights M 40.2 $0.06

  5. Slide 5: 2025 Year in Review

    2025 Year in Review Significant achievements across the business in a transformational year For personal use only Aug 2024 Aug 2024 Jan 2025 Feb 2025 To date To date Boorara – mining Phillips Find – Boorara – first Phillips Find – 15,401oz Phillips Find – Operations commenced mining gold poured firs

  6. Slide 6: Our strategy

    Our strategy An attractively priced West Australian gold developer with near-term growth For personal use only Now Next 12 months Late 2026 onwards Generate cash flow using third Complete Black Swan refurbishment Commence gold production at Production party plant and infrastructure for and conversio

  7. Slide 7: Standout combination of value and growth

    Standout combination of value and growth Attractive valuation relative to ASX-listed gold development peers For personal use only $521 Australian gold project developers market capitalisation / MRE ounce1 $324 $299 $295 $235 $226 $225 $194 $183 $169 $139 $138 $136 $117 $113 $61 MEK MI6 MM8 WA8 GG8 B

  8. Slide 8: Portfolio overview

    For personal use only Portfolio overview A 1.8Moz Mineral Resource* with processing infrastructure and growth * See Table on page 25.

  9. Slide 9: Project portfolio

    Project portfolio Strategically constructed gold exploration portfolio centered around major geological structures • Large 1,309km2 land package in an attractive For personal use only geological setting centred around Kalgoorlie / Coolgardie • Current 1.8Moz Group Mineral Resource* (29.98Mt @ 1.85g/

  10. Slide 10: Boorara Gold Project

    Boorara Gold Project PRODUCTION Cash flow and future baseload open pit feed Production For personal use only • Located 15km east of Kalgoorlie, next to the Super Pit • Producing gold under a Binding Ore Sale Agreement (OSA) with the Paddington mill since late 2024 • Treatment to date of 543.7kt for

  11. Slide 11: Phillips Find

    Phillips Find PRODUCTION Generating cash flow from local toll milling • Located 45km north-northwest of Coolgardie For personal use only • Multiple moderate grade open pit deposits with a combined Mineral Resource* of 0.59kt @ 2.36g/t Au for 45.2koz • Low financial risk Joint Venture (JV) with contr

  12. Slide 12: Black Swan processing plant

    Black Swan processing plant PROCESSING Strategically located concentrator ~40km north of Kalgoorlie • Comminution circuit suitable for gold processing after For personal use only refurbishment and addition of a carbon in leach (CIL) circuit • Highly capital efficient plan by leveraging existing infr

  13. Slide 13: Black Swan process facility

    Black Swan process facility PROCESSING Existing flotation circuit and planned changes to facilitate gold production GOLD CONVERSION For personal use only Carbon in leach Elution Gold room Au Crush Grind Flotation Ag/Zn + Ni Concentrates REFURBISHMENT FUTURE REFURBISHMENT OPTION 13

  14. Slide 14: Burbanks project

    Burbanks project GROWTH High-grade cornerstone asset with 30,000m of infill and extensional drilling well underway • Located on a granted Mining Lease 9km south of Coolgardie For personal use only • Historic underground mining produced 324koz @ 22.7g/t Au • Large 465.5koz open pit and high-grade und

  15. Slide 15: Black Swan exploration potential

    Black Swan exploration potential GROWTH Untested gold anomalies emerging adjacent to the process plant infrastructure • Previous exploration largely targeting nickel sulphide mineralisation – only 5% of drill assays have tested for gold For personal use only • Target areas adjacent to the Mt Monger

  16. Slide 16: Nimbus silver-zinc deposit

    Nimbus silver-zinc deposit GROWTH A high-grade silver-zinc VHMS deposit on the edge of Kalgoorlie • Mineral Resource* containing 20.2Moz silver and 104kt zinc For personal use only • High-grade lode containing 6.4Moz silver (774g/t Ag) and 33kt zinc (12.8% Zn) • Potential to extend mineralisation al

  17. Slide 17: Strong pipeline to support Black Swan

    Strong pipeline to support Black Swan Horizon’s 30Mt of existing gold Resources with ~50,000m of drilling budgeted in FY25/261 For personal use only Black Swan Ni Nimbus Zn/Ag Coote Cannon Greater Boorara Crake Burbanks Phillips Find Wilson’s Teal Penny’s Find Boorara Rose Hill Kalpini ~300koz ~700k

  18. Slide 18: Platform for regional consolidation

    Platform for regional consolidation GROWTH >Several deposits of gold resources in region are without a clear processing solution • Opportunities for non-producers to access third party gold processing infrastructure in the WA For personal use only Goldfields is becoming increasingly difficult • Conv

  19. Slide 19: Lake Johnston process plant

    Lake Johnston process plant Sale of non-core strategic infrastructure for $35M • Located 185km southwest of Kalgoorlie For personal use only • 1.5Mtpa nickel concentrator and associated infrastructure amenable to processing lithium or conversion for gold processing • Accommodation camp with 200-pers

  20. Slide 20: Operational timeline

    Operational timeline Indicative timeline of upcoming cash flow and pathway to gold from Black Swan For personal use only CY 2025 CY 2026 CY 2027 Target key workstreams Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Boorara gold production Phillips Find gold production Additional toll treatment/ore sales Black Swan convers

  21. Slide 21: An Emerging Standalone Gold Producer

    An Emerging Standalone Gold Producer For personal use only Cash flow generation Combination of 1.8Moz of from gold produced at Mineral Resource* and Boorara and Phillips Find processing infrastructure Ramp up of production Pre-Feasibility Study and aligned with record gold exploration to establish a

  22. Slide 22: Contact Us

    For personal use only Contact Us Grant Haywood Managing Director and CEO +61 (08) 9386 9534 admin@horizonminerals.com.au horizonminerals.com.au PO Box 1064 West Perth WA 6872

  23. Slide 23: Appendices

    For personal use only Appendices

  24. Slide 24: Peers Comparison – Reference Table

    Peers Comparison – Reference Table ASX-listed Gold Developers For personal use only Contained Au Resource Measured Indicated Inferred Stage of Development / Market Cap Market Cap / Company ASX Share Price Shares (M) Reference (Moz) Grade (g/t) (Mt) (Mt) (Mt) Study Completed ($M) Cont. Au Meeka Metal

  25. Slide 25: Mineral Resource Estimate

    Mineral Resource* Estimate Gold projects Cutoff Measured Indicated Inferred Total For personal use only Project Au g/t Mt Au g/t Oz Mt Au g/t Oz Mt Au g/t Oz Mt Au g/t Oz Boorara OP 0.5 0.75 1.21 29,200 6.48 1.28 266,000 2.55 1.26 103,000 9.79 1.27 398,200 Burbanks OP 0.5 - - - 1.43 2.02 92,800 3.43

  26. Slide 26: Ore Reserve Estimate

    Ore Reserve* Estimate Gold projects Cannon Ore Reserve Tonnes For personal use only Category Au (g/t) Gold Metal (koz) (kt) Proven Reserve – – – Probable Reserve 135.0 4.1 17.7 Total Reserve 135.0 4.1 17.7 Boorara Ore Reserve Tonnes Location Reserve Category Au (g/t) Gold Metal (kOz) (kt) Proved 382

  27. Slide 27: Mineral Resource Estimate – Nimbus silver-zinc project

    Mineral Resource* Estimate Nimbus silver-zinc project Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au) For personal use only Category Mt Ag (g/t) Au (g/t) Zn (%) Ag (Moz) Au (kt) Zn (kt) Measured Resource 3.62 102 0.09 1.2 11.9 10 45 Indicated Resource 3.18 48 0.21 1.0 4.9 21 30 Inferred

  28. Slide 28: Mineral Resource & Ore Reserve disclosure Confirmations

    Mineral Resource & Ore Reserve disclosure Confirmations Horizon’s Gold Mineral Resources Non-gold Mineral Resources The information in this report that relates to Horizon’s Mineral Resources estimates is extracted The information is this Presentation that relates to Horizon’s exploration results and

Horizon Minerals — Shareholder Meeting (November 2025) on 6ix