Bengal Energy Ltd. · TSX:BNG
Bengal Energy — Investor Presentation (July 2015)
27 slides from Bengal Energy's investor presentation, July 2015

Slide 1: Corporate Presentation July 2015
CORPORATE PRESENTATION JULY 2015 HIGH IMPACT INTERNATIONAL TSX: BNG EXPLORATION & PRODUCTION

Slide 2: Investment Highlights
INVESTMENT HIGHLIGHTS Strong and growing reserves base in a light oil pool High-quality light oil & with top tier operating netbacks gas assets in low-risk, stable countries: Material production and cash flow growth potential Australia & India through near-term development / appraisal Multiple

Slide 3: Why Now?
WHY NOW ? Significant upside based on independently High margin, strong evaluated 2P NAV cash generating Other near-term catalysts: operations Tie-in new light oil production from Phase Two drilling Exploration drilling on ATP 732 supported by new Catalyst-rich period 300 sq. km. 3D through

Slide 4: Corporate Profile
CORPORATE PROFILE Financial Basic / FD Common Shares Outstanding (TSX:BNG) 68.2 MM / 72.7MM Insider Holdings 29% Total Debt $17MM Enterprise Value @ $0.25/share (July 6, 2015) ~$34MM 2015 Funds Flow from Operations (FFO) $4.6MM Est. current Total debt to 2015 FFO 3.7x production: Corporate Reserves

Slide 5: Bengal Leadership Team
BENGAL LEADERSHIP TEAM Management Board of Directors Chayan Chakrabarty, PhD (Pet Eng), MBA - Ian Towers, P.Eng – Chairman Former President, CEO & Director Dolomite Energy President, CEO & Director Formerly Daylight Resources, Verenex, Ross Smith Energy Group Peter Gaffney, P.Eng, P.Geol Founding pa

Slide 6: Defined Business Strategy
DEFINED BUSINESS STRATEGY • Explore across high-graded and high-impact permits in a EXPLORE diversified portfolio • Continue to high-grade and refine/focus portfolio • Further de-risk at the prospect level APPRAISE • Expand pool boundary, convert resources to 3P/2P reserves • Grow 1P & 2P reserves a

Slide 7: Asset Overview
ASSET OVERVIEW Assets in proven, producing basins Large and under-explored acreage offers significant 1.9MM gross acres total growth opportunity High potential impact without typical international risk onshore; Well-established regulatory framework with British Australia resource play common

Slide 8: Bengal's Cooper Basin Permits
BENGAL’S COOPER BASIN PERMITS BARTA Cooper Cuisinier Basin (Non-Op.) Cuisinier BARROLKA (Operated) TOOKOONOOKA (Operated) WOMPI (Non-Operated) THE COOPER BASIN – OPPORTUNITY WITH ATTRACTIVE ECONOMICS The Cooper Basin is the most prolific onshore basin in Australia Many parts of the Basin have be

Slide 9: Large Footprint for Future Growth
LARGE FOOTPRINT FOR FUTURE GROWTH Australia Program BARTA (10 wells) 2 development oil wells tied-in and undergoing production testing BARROLKA Operator preparing field development plan at Cuisinier 1 carried well at Tookoonooka BARROLKA BARTA TOOKOONOOKA (1 well) WOMPI TOOKOONOOKA WOMPI (1 we

Slide 10: Barta Permit: Cuisinier (PL 303)
BARTA PERMIT: CUISINIER (PL 303) Barta Permit equals 344,218 acres(1) PL 303 15,815 acres(1) CUISINIER FIELD 23 wells drilled to date – 22 oil Phase Two drilling program expanded the pool, further increasing reserves and will add production PL303 Every incremental 100 bbl/d adds $1.5 - 2MM

Slide 11: Wompi Permit (ATP 752)
WOMPI PERMIT (ATP 752) Wompi offers Bengal moderate risk exploration in a well-established, oil- producing fairway with multi-zone potential Nubba 1,drilled by Santos on ATP 752 (Bengal 38.08%) tested several Jurassic oil plays that are producing in the Bowen field Five different Jurassic sand

Slide 12: Tookoonooka Permit (ATP 732P)
TOOKOONOOKA PERMIT (ATP 732P) Very large permit covering 654,000 acres yet KENMORE 13.6 MMSTB(1) sparsely drilled – only 10 wells drilled to date. Potential for a new oil fairway, located in an underexplored area between two prolific Cooper Basin oil fields. IPUNDU Caracal-1 well has establish

Slide 13: Tookoonooka, New 3D – Preliminary Indications
TOOKOONOOKA, NEW 3D – PRELIMINARY INDICATIONS Preliminary data now under review with baseline interpretation in progress Numerous prospects and leads emerging Hutton target Example Tigris Prospect, primary Hutton target with multiple secondary zones Tigris structure well positioned to receiv

Slide 14: Barrolka Permit (ATP 934)
BARROLKA PERMIT (ATP 934) Permian Structure Map Real Energy has drilled two Permian gas ATP 927P Real Energy: 100% TANBAR 1 MARAMA MARAMA1 ST1 1 discovery wells on ATP 927P (Queenscliff 1 Queenscliff-1 and Tamarama 1) Tamarama-1 MT HOWITT 2 Dev CLINTON 1 Real has declared an independent Total Me

Slide 15: India Overview & Cauvery Basin
INDIA OVERVIEW & CAUVERY BASIN BENGAL’S CY-ONN-2005/1 BLOCK ~946 km2 INDIA 30% working interest Light oil prone (35 - 52˚ API) Bengal’s CY-ONN-2005/1 600 km2 3D completed Block Near-term, high impact drilling - 3 wells planned for 2016 for US$4.1MM Partnered with Gas Authority of India Ltd.

Slide 16: India: Cauvery Prospects
INDIA: CAUVERY PROSPECTS CAUVERY BASIN (1) 600 km2 of 3D shot & interpreted; 3 drill locations finalized (1) • Each location tests different play type in different part of permit (1) • All targets located in a Cretaceous syn- rift to post rift play fairway • Primary zones should be oil or oil + ga

Slide 17: Realized Crude Oil Price Scenario
REALIZED CRUDE OIL PRICE SCENARIO(1) $130.00 Brent (USD) Realized (USD) Realized (CAD)(2) $ 124.30 $120.00 $103.63 $110.00 $ 91.63 $100.00 $99.50 $90.00 $ 82.90 $ 100.00 $80.00 $ 73.30 $70.00 $ 77.00 $60.00 $50.00 $ 60.00 BRENT PRICE / BBL $40.00 AVERAGE 5 YEAR BRENT - WTI SPREAD $8.87(3) * $1 CAD e

Slide 18: Corporate Reserves Growth: Independent Evaluation
CORPORATE RESERVES GROWTH: INDEPENDENT EVALUATION ANNUAL PROVED PLUS PROBABLE(1) NET PRESENT VALUE OF RESERVES @ 10% RESERVES (MBOE) DISCOUNT FACTOR(1) ($MM) AS AT YEAR END MARCH 31, AS AT YEAR END MARCH 31, 51% 17% growth year over year growth year over year 122% 150% growth year over year growth y

Slide 19: Value Creation for Shareholders
VALUE CREATION FOR SHAREHOLDERS PRODUCTION PER SHARE GROWTH (NET)(1) NET AVERAGE DAILY PRODUCTION VOLUMES(1) AS AT YEAR END MARCH 31 (2) AS AT YEAR END MARCH 31 (2) Average daily production per million Production growth directly linked to 650 basic shares outstanding Cuisinier drilling 9.5 468 480 7

Slide 20: Building the Value Chain
BUILDING THE VALUE CHAIN Grow existing production base through high return drilling and DEVELOP development projects in the Cuisinier producing field Extend pool boundaries and expand 2P & 3P reserves in the APPRAISE producing Cuisinier field and evaluate the existing new gas discovery at the Wompi

Slide 21: Why Bengal?
WHY BENGAL? Significant upside based on existing 2P reserves value CASH FLOW High impact near-term catalysts GROWTH Exploration drilling on Tookoonooka supported by new 300 sq. km. 3D Drilling 3 wells in calendar 2016 in onshore India EXPANDING Appraisal of new natural gas discovery at Wom

Slide 22: Thank You
THANK YOU

Slide 23: Endnotes
ENDNOTES Slide 2 (1) Corporate Operating Netback in Fiscal Q4, 2015 of $45.86/bbl Slide 4 (1) Based on independent, qualified reserves evaluator GLJ Petroleum Consultants Ltd.’s report dated March 31, 2015 entitled Reserves Assessment and Evaluation of Canadian and Australian Oil and Gas Properties

Slide 24: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Certain information regarding Bengal Energy Ltd (“Bengal” or the “Company”) set forth in this document contains forward-looking statements or financial outlooks (collectively, "forward-looking statements") under applicable securities law. The use of any of the words “plan”

Slide 25: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Readers are cautioned that the foregoing list of factors is not exhaustive. Additional information on these and other factors that could effect Bengal’s operations and financial results are included in reports on file with Canadian securities regulatory authorities and may

Slide 26: Fundamental Resource Definitions
FUNDAMENTAL RESOURCE DEFINITIONS Total Petroleum Initially-In-Place (TPIIP) is that quantity of petroleum that is estimated to exist originally in naturally occurring accumulations. It includes that quantity of petroleum that is estimated, as of a given date, to be contained in known accumulations,

Slide 27: Cautionary Statements
CAUTIONARY STATEMENTS Analogous Information: Certain noted drilling, completion, production, reserve and resource data provided in this document may constitute “analogous information” under applicable securities legislation, such as reserve and resource estimates or the reserves and resources presen
Source: Internet Archive copy of bengalenergy.ca
More decks from Bengal Energy Ltd.
Shareholder Meeting (September 2026)13 slides · Sep 17, 2026
QEC Investment Showcase 20239 slides · May 2, 2023
Investor Presentation (October 2022)11 slides · October 2022
Investor Presentation (May 2022)18 slides · May 2022
Investor Presentation (February 2022)23 slides · Feb 11, 2022
Shareholder Meeting (September 2021)23 slides · Sep 28, 2021