Contango Silver & Gold Inc. · AMEX:CTGO

Contango Silver & Gold — Contango ORE — Technical Presentation (June 2023)

9 slides from Contango Silver & Gold's technical presentation, Jun 16, 2023

  1. Slide 1: Long Section view of Coleman segment Au composites vs. block model

    Figure 1 Long Section view of Coleman segment Au composites vs. block model

  2. Slide 2: Drill Location Map of Lucky Shot and Coleman segments of the Lucky Shot Project

    Figure 2 Drill Location Map of Lucky Shot and Coleman segments of the Lucky Shot Project

  3. Slide 3: Cross Section of Coleman segment Domain Codes, Looking East

    Figure 3 Cross Section of Coleman segment Domain Codes, Looking East

  4. Slide 4: Oblique Section of Lucky Shot segment Domain Codes Looking SE

    Figure 4 Oblique Section of Lucky Shot segment Domain Codes Looking SE

  5. Slide 5: Location of Contango drill holes in the Lucky Shot segment

    Figure 5 Location of Contango drill holes in the Lucky Shot segment completed in 2022

  6. Slide 6: Fan holes drilled in the West Drift segment showing results

    Figure 6 Fan holes drilled in the West Drift of the Lucky Shot segment showing results (meters and gold grades in g/t)

  7. Slide 7: Block model grades of the Coleman and Lucky Shot segments vein structure

    Figure 7 Block model grades of the Coleman and Lucky Shot segments of the Lucky Shot vein structure showing drilling density, distribution of higher-grade ore shoots and exploration upside.

  8. Slide 8: Block model of the Coleman and Lucky Shot segments vein structure

    Figure 8 Block model of the Coleman and Lucky Shot segments of the Lucky Shot vein structure showing distribution of Indicated and Inferred blocks – red blocks depict areas that require confirmation drilling by Contango to be considered measured resource category.

  9. Slide 9: Significant Drill Intercepts for LSU22001-LSU22029

    TABLE 5 SIGNIFICANT DRILL INTERCEPTS FOR LSU22001-LSU22029 Drillhole Name From (m) To (m) Interval (m) Gold (g/t) LSU22001 192.63 197.97 5.34 2.49 LSU22001 243.26 246.86 3.6 1.18 LSU22002 164.82 177.93 13.11 1.64 LSU22002 221.67 222.86 1.19 5.44 LSU22002 236.22 237.44 1.22 11.35 LSU22003 163.98 166.

Contango ORE — Technical Presentation (June 2023) on 6ix