Austral Gold Limited · ASX:AGD
Austral Gold — Shareholder Meeting (November 2010)
27 slides from Austral Gold's shareholder meeting presentation, Nov 29, 2010
Slide 1: Annual General Meeting
For personal use only ANNUAL GENERAL MEETING 29 November 2010 www.australgold.com.au
Slide 2: Argentinean Exploration Areas – San Juan Province
For personal use only Argentinean Exploration Areas – San Juan Province Earn In Agreement with ArgentinaMinera SA (AMINSA) to explore 227,000 hectares tenements in San Juan Located near Xstrata’s advanced copper project El Pachón in Argentina and Los Pelambres owned by Antofagasta Minerals in Chile.
Slide 3: Argentinean Exploration Areas – Santa Cruz Province
For personal use only Argentinean Exploration Areas – Santa Cruz Province Austral Gold has nine tenement applications in Santa Cruz, southern Patagonia Area totals almost 85,000 hectares
Slide 4: Strategic Location
For personal use only Strategic Location
Slide 5: GEYCE Power (Assemble of Power Room)
For personal use only PLANT: GEYCE Power (Assemble of Power Room)
Slide 6: ESCO – 95% achievement to date
For personal use only PLANT: ESCO – 95% achievement to date
Slide 7: ESCO – 95% Achievement to date
For personal use only PLANT: ESCO – 95% Achievement to date
Slide 8: Plant
For personal use only PLANT: Plant
Slide 9: CEYGE, Power – Cable rack
For personal use only PLANT: CEYGE, Power – Cable rack
Slide 10: Heap Leach Pad - Excavations in Emergency Pool
For personal use only PLANT: Heap Leach Pad - Excavations in Emergency Pool
Slide 11: Plant
For personal use only PLANT: Plant
Slide 12: Plant
For personal use only PLANT: Plant
Slide 13: Plant
For personal use only PLANT: Plant
Slide 14: ADMINISTRATION: Camp
For personal use only ADMINISTRATION: Camp
Slide 15: Heap Leach Pad
For personal use only PLANT: Heap Leach Pad
Slide 16: Crushing Plant
For personal use only PLANT: Crushing Plant
Slide 17: CEYGE Power
For personal use only PLANT: CEYGE Power
Slide 18: Crushing Plant - ESCO – 80% general advance
For personal use only PLANT: Crushing Plant - ESCO – 80% general advance
Slide 19: Moved pump VOGT for installation
For personal use only PLANT: Moved pump VOGT 660 for installation
Slide 20: Surface of secondary crusher position #3 repaired
For personal use only PLANT: Surface of secondary crusher position #3 repaired and prepared volts for installation
Slide 21: Heap Leach Pad phase III, section to completed
For personal use only PLANT: Heap Leach Pad phase III, section 1 to 15 completed, section 16 a 27 welding and patches pending
Slide 22: CV-07, installed Access, handrails, grating, and walkway pending
For personal use only PLANT: CV-07, installed Access, handrails, grating, and walkway pending
Slide 23: CV-02, completed accesses
For personal use only PLANT: CV-02, completed accesses
Slide 24: Installation of cyanide preparation tank
For personal use only PLANT: Installation of cyanide preparation tank
Slide 25: MINE: Cachinalito Portal
For personal use only MINE: Cachinalito Portal
Slide 26: MINE: Cachinalito Decline
For personal use only MINE: Cachinalito Decline
Slide 27: Proxies
For personal use only Proxies Resolution Total Proxies Proxies Proxies Proxies At the received FOR AGAINST ABSTAINING Proxies eligible to Discretion vote RESOLUTION 1 Adoption of Financial Statements and 148,333,392 148,310,922 - - 22,470 Directors Report RESOLUTION 2 148,333,392 148,309,152 3,810 2