Athena Gold Corporation · CSE:ATHA
Athena Gold — Investor Presentation (April 2021)
18 slides from Athena Gold's investor presentation, Apr 21, 2021
Slide 1: The Resurgence of the Walker Lane Trend
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 1 The Resurgence of the Walker Lane Trend APRIL 2021 : AHNR
Slide 2: Disclaimer
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 2 DISCLAIMER This presentation of Athena Gold Corporation (the "Company") is for information only and shall not constitute an invitation or o ffer to buy, sell, issue or subscribe for, or the solicitation of an offer to buy, sell or issue, or sub
Slide 3: Qualified Person and Cautionary Note to United States Investors
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 3 QUALIFIED PERSON Ken Brook, RPG , is a Qualified Person as defined by National Instrument 43 - 101 Standards of Disclosure for Mineral Projects ("NI 43 - 101"), has approved the scientific and technical information concerning the Company discus
Slide 4: Nevada is the world's #1 gold mining jurisdiction
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 4 Nevada is the world’s #1 gold mining jurisdiction in terms of investment attractiveness. ~ Fraser Institute, 2020 Mining Survey OTCQB : AHNR Map of Walker Lane Gold Trend, Athena 2021
Slide 5: A junior gold explorer advancing the Excelsior Springs Project
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 5 A JUNIOR GOLD EXPLORER CURRENTLY ADVANCING THE EXCELSIOR SPRINGS PROJECT IN THE HEART OF NEVADA’S WALKER LANE GOLD DISTRICT ABOUT US Top Tier Exploration & Mining Jurisdiction Comprehensive Exploration Strategy Committed & Experienced Team Sign
Slide 6: Each operator has advanced the project and drilled extensions
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 6 EACH OPERATOR HAS ADVANCED THE PROJECT AND DRILLED EXTENSIONS OF THE KNOWN GOLD MINERALIZATION. Unverified, historic production, reported to be 19,200 oz Au (18,000 tons containing 1.2 oz Au/ton (37.3g Au/T) Efforts to re - timber the shafts an
Slide 7: Excelsior Springs - Flagship Project
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 7 • Advanced exploration stage • Prestigious Walker Lane • 2 Patented lode claims & 140 BLM lode claims (2,884 acres / 1,167 hct ) • Good location in mining friendly Esmeralda County • Significant prior exploration creates solid foundation • Intr
Slide 8: Building on a history of success
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 8 BUILDING ON A HISTORY OF SUCCESS THE WALKER LANE DISTRICT IS KNOWN FOR SEVERAL GOLD PROJECTS THAT PRODUCED MORE THAN 1 MILLION OUNCES. BASED ON PREVIOUS DRILL RESULTS, IT IS BELIEVED THAT EXCELSIOR SPRINGS HAS POTENTIAL TO JOIN THIS PRESTIGIOUS
Slide 9: Significant mineralization: historic drill holes
9 OTCQB : AHNR OTCQB : AHNR © 2021 Athena Gold. All rights reserved. 9 SIGNIFICANT MINERALIZATION HISTORIC DRILL HOLES WITH SIGNIFICANT GOLD GRADES AND THICKNESSES: Hole No. Interval Meters Gold G/T Depth From Meters To TA - 03 16.8 1.47 1.5 18.3 TA - 11 15.2 1.68 0.0 15.2 88 - 06 27.4 2.74 0.0 27.4
Slide 10: Fundamental growth & value strategy
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 10 FUNDAMENTAL GROWTH & VALUE STRATEGY BUILD VALUE BY DELIVERING ON 3 KEY EXPLORATION PROGRAMS Oriented Core Drill Program Q3 - 2021 RC Drill Program Q4 - 2021 Geophysics Program Q2 - 2021 1 2 3
Slide 11: 1. Geophysics program
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 11 • Results of the prior IP survey in 2011 indicated shallow, high - chargeability anomaly. • As outlined in our 43 - 101, the new IP survey will provide a greater depth penetration and better definition of the southwestern anomaly. • Favorable
Slide 12: 2. Oriented core drill program
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 12 • Tremendous opportunity to better understand the structural geology. • No historic core drilling. • Structure is poorly understood. • Oriented Core drilling is necessary to understand the structural controls of mineralization on the project b
Slide 13: 3. RC drill program
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 13 The objective of the RC program is to confirm the attitude of the mineralized structures and to significantly expand the number of mineralized intercepts by utilizing proper orientation of the RC drill holes. Eighty five percent of the mapped
Slide 14: A risk-managed approach to resource definition
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 14 A RISK - MANAGED APPROACH TO RESOURCE DEFINITION LEVERAGING THE LATEST EXPLORATION TECHNOLOGIES TO ADVANCE EXCELSIOR SPRINGS PROJECT. Target date Q2 - 2021 • IP Survey to better define the Southwestern Anomaly to a depth of 900 ft (274m). • Es
Slide 15: : AHNR • Past President of Redwood Microcap Fund, Inc.(1985 - 2005). Increased shareholder
© 2021 Athena Gold. All rights reserved. OTCQB : AHNR 15 • Past President of Redwood Microcap Fund, Inc.(1985 - 2005). Increased shareholder value by 6X under his stewardship. • Lead investor of Airsoft, Inc. Returned 20X to investment group • President of Athena Silver since 2010 - managed Langtry
Slide 16: Capital structure
16 OTCQB : AHNR OTCQB : AHNR © 2021 Athena Gold. All rights reserved. 16 CAPITAL STRUCTURE 15 February 2021 Millions Issued Shares 60.2 Float 17.7 Option/Warrants None Nubian Resources (Future Issuance) 45 Fully Diluted Common Shares 108.7 Market Capitalization US$7m Current Price US$0.11 52 - Week
Slide 17: © 2021 Athena Gold. All rights reserved. 17 17
© 2021 Athena Gold. All rights reserved. 17 17
Slide 18: Athena Gold Corporation contact
Athena Gold Corporation 2010 - A Harbison Dr., PMB #312, Vacaville, CA USA 95687 For more information: John Power Athena CEO T: +1 (707) 291 6198 E: johncaseypower@gmail.com OTCQB : AHNR