Lincoln Minerals Limited · ASX:LML

Lincoln Minerals — Shareholder Meeting (November 2010)

19 slides from Lincoln Minerals's shareholder meeting presentation, Nov 24, 2010

  1. Slide 1: 2010 Annual General Meeting

    For personal use only 2010 Annual General Meeting Dr A. John Parker Managing Director 24 November 2010

  2. Slide 2: Disclaimer & Competent Person's Statement

    LINCOLN MINERALS LIMITED Disclaimer & Competent Person’s Statement This presentation has been prepared by Lincoln Minerals Limited (“LML") as an aid to a spoken For personal use only explanation. The information contained in this presentation is a professional opinion only and is given in good faith

  3. Slide 3: Lincoln Minerals Limited overview

    LINCOLN MINERALS LIMITED  Listed on ASX March 2007  116,959,938 Shares + 4,760,000 unlisted Options For personal use only  Market capitalisation (November 2010 @ 19 cents/share) $22.2 million  Cash on hand October 2010 $2.5 million  Located in world class mineral belts (Gawler Craton & Indonesi

  4. Slide 4: Gawler Craton – Location-Location

    LINCOLN MINERALS LIMITED Gawler Craton For personal use only “Location-Location” • Portfolio of quality iron ore, uranium, nickel-cobalt, lead-zinc-copper-silver, vanadium and gold projects • 4,610 km2 tenement area • On Eyre Peninsula in the Gawler Craton • A world-class mineral belt • Historically

  5. Slide 5: Gum Flat Iron Ore resources and approvals

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Lincoln Minerals (100%) For personal use only  20km from Port Lincoln (or 80km from proposed new Sheep Hill deep sea bulk commodities port)  103+ million tonne (Mt) iron ore resource  Indicated Hematite-Goethite Resource: 1.8 Mt at 51% Fe (54% calcined F

  6. Slide 6: Development Options

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Development Options  Hematite For personal use only  Stage 1 – Mine & export 0.5 million tonnes per annum (Mtpa) DSO fines (55% Fe) from Port Lincoln  Stage 1b – Mine 1 Mtpa and process to produce ~0.35 Mtpa upgraded fines (55% Fe)  Magnetite  Stage 2

  7. Slide 7: Stage 1 Option – Hematite DSO

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Stage 1 Option – Hematite DSO For personal use only Mine & export 0.5 Mtpa DSO fines (~55% Fe) from Port Lincoln  Road transport to Port Lincoln via B-Doubles – 4 trucks/hour, 12 hours a day, 5.5 days/week (1,920 t/day or 10,500 t/week)  Upgrade Duck Pond

  8. Slide 8: Gum Flat Iron Ore – Stage 1 Hematite DSO

    Gum Flat Iron Ore LINCOLN MINERALS LIMITED Stage 1 – Hematite DSO For personal use only

  9. Slide 9: Stage 1b – Hematite Beneficiation

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Stage 1b – Hematite Beneficiation For personal use only  Current defined resources have a planned mine life of only two years based on DSO > 55%  Metallurgical testwork – can beneficiate lower grade material (45-55% Fe) to produce a >55% DSO product with

  10. Slide 10: Stage 2 – Magnetite Process Flow Sheet

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Stage 2 – Magnetite Process Flow Sheet For personal use only 10 Mtpa ROM • Mine & export magnetite concentrate (67% Fe) 26% Fe 44% SiO2 from Port Lincoln Crushing Crushing • Transport by either road, rail or slurry pipeline to Port Lincoln Coarse Dry Cobbin

  11. Slide 11: Opex & Capex

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Opex & Capex For personal use only Hematite DSO High Grade Magnetite Concentrate (67% Fe) 0.5 Mtpa 2 Mtpa concentrate Concentrate 55% Fe 67% Fe Grade Slurry Pipeline to Transport Road to PL Road to PL Rail to PL PL Capex A$50 million A$235 million A$250 mil

  12. Slide 12: Timeline

    LINCOLN MINERALS LIMITED Timeline Stage 1 DSO Hematite For personal use only 2010 2011 2012 2013 2014 Stage 1 • Drill out • Evaluate Barns DSO • Baseline Studies • Mining Lease • MARP Application • DFS (Stage 1) • Purchase • Groundwater Land Approvals Plant Construction Upgrade Road Remove Overburde

  13. Slide 13: Barns Prospect – Exploration Upside

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore For personal use only Barns Prospect Exploration Upside  Drilling has focused on central hematite DSO and magnetite  Several additional hematite targets  Scope for expanded DSO operation Exploration Targets  150-250 Mt magnetite ore @ 22-28% Fe (20-25%

  14. Slide 14: Offtake Agreement – Jiangyin Huaxi Steel

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Offtake Agreement Jiangyin Huaxi Steel Co., Ltd For personal use only  Memorandum of Understanding (MOU) signed April 2010  Direct investment at 55 cents per share ($8.25 million for 15 million shares)  Negotiating an Off-take Agreement for at least 50%

  15. Slide 15: Eurilla Iron Ore & Uranium

    LINCOLN MINERALS LIMITED Eurilla Iron Ore & Uranium For personal use only Lincoln Minerals (100%) Eurilla South Iron Ore (Wilcherry)  Outcrop or shallow cover over Proterozoic BIF  Inferred Resource (hematite & magnetite) 21.7 Mt @ 33.3% Fe  Manganese up to 17.5% Mn  Priority exploration targets

  16. Slide 16: Cockabidnie Nickel Cobalt

    LINCOLN MINERALS LIMITED Cockabidnie Nickel Cobalt For personal use only (all minerals except iron ore)  Drilling at Cockabidnie (Campoona Syncline) has identified up to 1.15% Ni & 0.33% Co within saprolitic clay above weathered gabbro  Lateritic-saprolite style mineralisation  Up to 2.4% Pb+Zn,

  17. Slide 17: Lincoln Minerals Asia-Pacific Limited – Indonesia

    LINCOLN MINERALS LIMITED LINCOLN ASIA-PACIFIC For personal use only LIMITED Lincoln Minerals (100%)  Looking at numerous opportunities in Indonesia  Manganese in western Timor (up to 55% Mn)  Iron ore and iron sands in Flores  Iron ore in Kalimantan  Heads of Agreement signed on 4 projects  Ha

  18. Slide 18: Western Timor manganese reconnaissance

    LINCOLN MINERALS LIMITED LINCOLN ASIA-PACIFIC For personal use only LIMITED Lincoln Minerals (100%)  Reconnaissance mapping and sampling in western Timor  Up to 55% Mn along a 4km long zone of mineralisation  Shallow surface outcrops

  19. Slide 19: Summary

    Summary LINCOLN MINERALS LIMITED Lincoln Minerals Limited For personal use only Focussing on development of initial hematite-goethite DSO mine at Gum Flat within 2 years Potential to be a low operating cost DSO operation $50-$60 per tonne margin Lowest Opex in SA Off-take Agreement with Chinese Stee

Lincoln Minerals — Shareholder Meeting (November 2010) on 6ix