Business
Volcanic reports high grade gold-silver results in initial holes at Holly Project, Guatemala
(TheNewswire) Vancouver, British Columbia – TheNewswire - July 7, ...

About this update from Volcanic Gold Mines Inc.
[{"type":"text","content":"Volcanic reports high grade gold-silver results in initial holes at Holly Project, Guatemala\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n Vancouver, British Columbia –\n \n \n TheNewswire - July 7,\n2021\n \n \n – Volcanic Gold Mines\nInc. (TSXV:VG)\n \n is pleased to report results from the initial\nthree drill holes on La Peña target at the Holly project and provide\nan update on the ongoing drill program.\n \n \n Highlights:\n \n \n - 16 holes completed to date testing three distinct vein sets cutting\nthe Jocotan fault zone.\n \n \n - Drilling confirms the re-interpretation of vein orientation.\n \n \n - Veins appear to be increasing in size with depth.\n \n \n Simon Ridgway, Volcanic’s President and CEO commented: “Historic\ndrilling at the Holly property in 2002-2003 identified several veins\nwith very high grade gold-silver mineralization.  Shallow and limited\nfollow up drilling during the same period returned inconclusive\nresults.  In our 2021 exploration campaign, Volcanic Gold’s strong\ntreasury allowed for a systematic approach with detailed mapping and\nclosely spaced drilling, leading to new discoveries and a greater\nunderstanding of controls on mineralization with predictable vein\nintercepts on a number of the targets.  Initial results from the\nfirst three holes at La Peña confirm high grade gold-silver continues\nto depth and we have commenced step out drilling along strike north\nand south and extending to depth.”\n \n \n \n Table 1. Diamond drill significant\nresults from Holly Project HDD-21-001 to 003 (Drilled intervals are\nshown with true widths estimated to be 88% of drilled\ninterval.)\n \n \n \n \n \n \n DrillHole\n \n \n \n \n From\n \n \n \n \n To\n \n \n \n \n Interval (m)\n \n \n \n \n Au (g/t)\n \n \n \n \n Ag (g/t)\n \n \n \n \n \n \n HDD-21-001\n \n \n \n \n 46.10\n \n \n \n \n 47.70\n \n \n \n \n 1.6\n \n \n \n \n 24.10\n \n \n \n \n 568\n \n \n \n \n \n \n HDD-21-001\n \n \n \n \n 53.70\n \n \n \n \n 60.60\n \n \n \n \n 6.9\n \n \n \n \n 4.90\n \n \n \n \n 85\n \n \n \n \n \n \n HDD-21-002\n \n \n \n \n 95.15\n \n \n \n \n 106.27\n \n \n \n \n 11.12\n \n \n \n \n 6.29\n \n \n \n \n 282\n \n \n \n \n \n \n including\n \n \n \n \n 95.15\n \n \n \n \n 98\n \n \n \n \n 2.85\n \n \n \n \n 15.50\n \n \n \n \n 342\n \n \n \n \n \...