Business

Volcanic Gold Mines Drills 6.52m @ 16.31 g/t Au at Holly Project in Guatemala

September 9, 2021 - TheNewswire - Vancouver, British Columbia - Volcanic Gold Mines Inc. (TSXV:VG) is pleased to report further high grade drill results from st

articleVolcanic Gold Mines Inc.September 9, 20215/company/volcanic-gold-mines/news/volcanic-gold-mines-drills-652m-1631-gt-au-at-holly-project-in-guatemala
Volcanic Gold Mines Drills 6.52m @ 16.31 g/t Au at Holly Project in Guatemala

About this update from Volcanic Gold Mines Inc.

[{"type":"text","content":"September 9, 2021 - TheNewswire - Vancouver, British Columbia - Volcanic Gold Mines Inc. (TSXV:VG) is pleased to report further high grade drill results from step out drilling from La Peña vein at the Holly Project in Guatemala. Highlights: HDD-21-017 from 134.25 to 139.00 returns 8.83m @ 8.81 g/t Au and 355 g/t Ag HDD-21-019 from 171.90 to 178.42 returns 6.52m @ 16.31 g/t Au and 55* g/t Ag HDD-21-020 from 61.70 to 67.10 returns 5.40m @ 5.91 g/t Au and 70* g/t Ag Results from the Holly project drilling have been received for holes up to HDD-21-020 and consistently, the deeper holes return better results, with mineralization open to the south/north and down dip. A table of 2021 holes drilled at La Peña is set out below: DRILLHOLE FROM (m) TO (m) INTERVAL (m) GOLD (g/t) SILVER (g/t) HDD-21-001 46.10 47.70 1.60 24.10 568 and 53.70 60.60 6.90 4.90 85 HDD-21-002 95.15 106.27 11.12 6.29 282 including   95.15 98.00 2.85 15.50 342 including   102.35 105.22 2.87 8.08 633 HDD-21-003 101.85 112.50 10.65 5.29 256 HDD-21-004 119.5 143.50 24 3.10 694 including   131.40 133.67 2.27 9.79 2035 including   136.00 137.85 1.85 5.60 2801 HDD-21-004 154.02 163.17 9.15 - 380 HDD-21-14 52.22 54.75 2.53 2.90 108 including 57.70 59.80 2.10 3.60 92 HDD-21-015 108.65 124.20 15.55 7.67 615 including 108.65 115.90 7.25 16.20 848 HDD-21-016 77.00 79.00 2.00 4.15 154 HDD-21-017 134.25 143.08 8.83 8.81 355 HDD-21-018 71.67 73.20 1.53 1.81 57 HDD-21-019 28.97 30.50 1.53 100* 100* and 171.90 178.42 6.52 16.31 55* including 172.90 176.60 3.70 28.31 73* HDD-21-020 61.70 67.10 5.40 5.91 70* including 63.00 64.00 1.00 29.41 100* and 131.00 134.20 3.20 - 100* Note: As indicated by * symbols, some samples from HDD-21-019 and HDD-21-020 are still pending final results that returned over 100 g/t silver and or 100 g/t gold . Final gold and silver assay results are expected soon and will likely increase the weighted averages for these intercepts. Reported intervals are drilled width. True width is estimated at 80% of true width. To date the La Peña vein has been tested over a strike length of 220m and a vertical depth up to 200m.  Drilling has encountered variable grades within the vein although most holes that intercept the vein deeper return high grades.  The drill will be turning again on the 15th of September and the focus of the program w...

More updates from Volcanic Gold Mines Inc.