Business
Trident Intersects 5.73 g/t Au over 15.0m including 9.35 g/t Au over 7.0m and 15.05 g/t Au over 2.0m Below Historical Mining Infrastructure at the Contact Lake Gold Project in Northern Saskatchewan
Vancouver, BC, Jan. 20, 2026 (GLOBE NEWSWIRE) -- Trident Resources Corp. (TSXV:  ROCK ...

About this update from Trident Resources Corp.
[{"type":"text","content":"Trident Intersects 5.73 g/t Au over 15.0m including 9.35 g/t Au over 7.0m and 15.05 g/t Au over 2.0m Below Historical Mining Infrastructure at the Contact Lake Gold Project in Northern Saskatchewan\nVancouver, BC, Jan. 20, 2026 (GLOBE NEWSWIRE) -- Trident Resources Corp. (TSXV: ROCK) (OTCQB: TRDTF) (“Trident” or the “Company”) is pleased to announce the results of the remaining six (6) diamond drill holes from the 19-hole 2025 drill program at the Contact Lake Project. These are the final holes to be reported from the 2025 fall program and were designed to test for the down-dip extension of gold mineralization below the historically defined Main Zone of the Bakos Shear Zone, the main host to gold mineralization. Based on the very successful results of the 2025 drill program (6,838m drilled in 19 holes), a fully-funded 10,000m winter 2026 drill program at Contact Lake is underway. Trident’s Regional Project Location Map:https://www.tridentresourcescorp.com/projects/contact-lake-gold-project/#&gid=1&pid=1 Highlights: - The final six holes from Trident’s inaugural drill program at Contact Lake all intersected substantial gold mineralization within, above and below the Bakos Shear zone – the main host of gold at Contact Lake. These holes targeted gold mineralization in areas below the historical mining infrastructure, which highlights the tremendous depth-potential of the orogenic gold system present at Contact Lake. - Hole CL25017 returned 5.73 g/t gold (Au) over 15.0m from 472.0m including 9.35 g/t Au over 7.0m from 480.0m and 15.05 g/t Au over 2.0m from 481.0m. - Hole CL25016 returned 2.62 g/t Au over 37.44m from 465.6m including 5.70 g/t gold over 9.0m from 469.8m and 11.53 g/t Au over 2.3m from 476.5m. - A 2026 winter phase of drilling consisting of approximately 10,000 metres in up to 40 drill holes with two drill rigs has commenced. Jon Wiesblatt, CEO of Trident Resources, commented: “These results are very important for Trident as they clearly demonstrate the potential to significantly expand gold mineralization at depth, well below the historical mine workings developed by Cameco in the 1990’s. These first few deeper holes illustrate the discovery potential beneath the old infrastructure and reinforce our belief that Contact Lake is a large, robust ...