Business

Tocvan Ventures Drills 29 meters of 0.71 g/t Au and 24.4 meters of 0.56 g/t Au in Hole JES-21-38 from Surface in Expansion Drilling at Pilar

Releases Phase II Results for the First Three Drill Holes TheNewswire - May 27, 2021 - Tocvan Ventures Corp. (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pl

articleTocvan Ventures Corp.May 27, 20214/company/tocvan-ventures/news/tocvan-ventures-drills-29-meters-of-071-gt-au-and-244-meters-of-056-gt-au-in-hole-jes-21-38-from-surface-in-expansion-drilling-at-pilar
Tocvan Ventures Drills 29 meters of 0.71 g/t Au and 24.4 meters of 0.56 g/t Au in Hole JES-21-38 from Surface in Expansion Drilling at Pilar

About this update from Tocvan Ventures Corp.

[{"type":"text","content":"Releases Phase II Results for the First Three Drill Holes TheNewswire - May 27, 2021 - Tocvan Ventures Corp. (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results for the first three holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program is currently in progress with 2,900 meters of reverse circulation (RC) drilling in seventeen (17) drill holes completed to date. Results for the first three drill holes are included in this release. Fourteen (14) drill holes are pending assay results. Drill Result Highlights JES-21-38 (Figure 1) 29.0 meters at 0.71 g/t Au from surface to 29.0 meters Including 3.1 meters at 2.6 g/t Au from surface to 3.1 meters Also, Including 6.1 meters at 1.9 g/t Au from 22.9 to 29.0 meters And, 24.4 meters at 0.56 g/t Au from 67.1 to 91.5 meters Including 9.2 meters at 1.3 g/t Au and 14 g/t Ag from 79.3 to 88.5 meters JES-21-37 6.1 meters at 0.48 g/t Au and 4 g/t Ag (0.52 g/t AuEq) from 59.5 to 65.6 meters And, 4.6 meters at 0.50 g/t Au and 11 g/t Ag (0.62 g/t AuEq) from 71.7 to 76.3 meters Including 1.5 meters at 1.13 g/t Au and 24 g/t Ag (1.4 g/t AuEq) from 71.7 to 73.2 meters “We are extremely pleased with these early stage results”, commented VP Exploration, Brodie Sutherland. “As we advance north of the Main Zone we are finding significant mineralization. We are especially excited to see the continuation of mineralization 30m on strike with our previous drill hole JES-20-36, which intersected 24.2m at 2.5 g/t Au and 73 g/t Ag. Pending assay results for the remaining drill holes will largely focus on our new target areas as we continue to unlock the potential of Pilar.” Results Discussion JES-21-37 – The hole was planned to test a CSAMT resistivity anomaly that correlated with surface quartz veins. A 6.1m zone was intersected with 0.52 g/t AuEq (see Table 1). Followed by a second zone of 4.6m at 0.62 g/t AuEq. Consistent with surface observations and other drill holes in the area, copper values were elevated in this hole with one interval returning 1.5m at 1.1 g/t Au, 24 g/t Ag and 1.2% Cu. JES-21-38 – The hole was planned to test the continuation of mineralization intersected in drill hole JES-20-36 and to test 25m up dip and further east of historic drill hole R-8, which intersected 40.4m at 1.4 g/t Au, inc...

More updates from Tocvan Ventures Corp.