Business

Tocvan Ventures Drills 116.9-meters of 1.2 g/t Au and 7 g/t Ag, including 10.2-meters of 12 g/t Au and 23 g/t Ag at Pilar.

Calgary, Alberta – TheNewswire - April 14, 2022 Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce drill results fr

articleTocvan Ventures Corp.April 14, 20225/company/tocvan-ventures/news/tocvan-ventures-drills-1169-meters-of-12-gt-au-and-7-gt-ag-including-102-meters-of-12-gt-au-and-23-gt-ag-at-pilar
Tocvan Ventures Drills 116.9-meters of 1.2 g/t Au and 7 g/t Ag, including 10.2-meters of 12 g/t Au and 23 g/t Ag at Pilar.

About this update from Tocvan Ventures Corp.

[{"type":"text","content":"Calgary, Alberta –  TheNewswire - April 14, 2022 Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce drill results from its Pilar Au-Ag Project in Sonora, Mexico. Results for drill hole JES-22-59 are provided in this release, a core twin of RC drill hole JES-20-32 which returned 94.6-meters at 1.6 g/t Au (see Figure 1). Drill hole JES-22-59 was previously mentioned in a news release (see NR February 15, 2022) where a mineralized breccia host was observed in drill core correlating to the Main Zone at Pilar. JES-22-59 returned 116.9-meters at 1.2 g/t Au and 7 g/t Ag, including an impressive 48.1-meters at 2.8 g/t Au and 9 g/t Ag. High-grade gold-silver mineralization was recorded adjacent to a heavily faulted and altered zone returning 10.2-meters at 12.0 g/t Au and 23 g/t Ag, including 4.2-meters at 28.3 g/t Au and 49 g/t Ag. A total of 1,562 meters of Phase III drilling has been completed in nine drill holes providing key information across the Main Zone and 4-T Trend. Results for five drill holes are pending. Drill Highlights JES-22-59 (Core) 116.9m at 1.2 g/t Au and 7 g/t Ag  Including 48.1m at 2.8 g/t Au and 9 g/t Ag  Including 10.2m at 12.0 g/t Au and 23 g/t Ag  Including 4.2m at 28.3 g/t Au and 49 g/t Ag  “Once again core drilling has confirmed the significant grade and distribution of gold-silver mineralization at Pilar”, commented Brodie Sutherland, CEO. “This further validates the strength of the shallow mineralized system at Pilar, especially in regard to the significant high-grade mineralization adjacent to controlling structures. We look forward to reviewing the remaining results that test the extension of these controlling faults to the southeast.”   Discussion of Significant Results As part of the Phase III program, nine drill holes have been completed totalling over 1,562 meters (Figure 1). Drilling looked to expand the Main Zone through 25, 50 and 100-meter step-outs to the southeast in a gap zone that has seen little drilling focused on the main trend between hole JES-20-32 (94.6m at 1.6 g/t Au) and hole JES-21-50 (39.7m at 0.96 g/t Au). Drilling also covered the 4-T Trend testing below trench T-21-3, which returned 19.5 meters at 0.61 g/t Au. Confirmation of host rock and structure through the Main Zone was completed with core drilling, ta...

More updates from Tocvan Ventures Corp.