Business

Tocvan Builds Momentum at Gran Pilar: Six Exploration Holes Drilled, Drone Mag Survey and Water Monitoring Wells for Pilot Completed

HERMOSILLO, MX / ACCESS Newswire / February 25, 2026 / Tocvan Ventures Corp. (the "Company" or "Tocvan") (CSE:TOC)(OTCQB:TCVNF)(WKN:TV3/ A2PE64) is pleased to provide an update on its active exploration drilling program at the flagship Gran Pilar ...

articleTocvan Ventures Corp.February 25, 20269/company/tocvan-ventures/news/tocvan-builds-momentum-at-gran-pilar-six-exploration-holes-drilled-drone-mag-survey-and-water-monitoring-wells-for-pilot-completed
Tocvan Builds Momentum at Gran Pilar: Six Exploration Holes Drilled, Drone Mag Survey and Water Monitoring Wells for Pilot Completed

About this update from Tocvan Ventures Corp.

[{"type":"text","content":"HERMOSILLO, MX / ACCESS Newswire / February 25, 2026 / Tocvan Ventures Corp. (the "Company" or "Tocvan") (CSE:TOC)(OTCQB:TCVNF)(WKN:TV3/ A2PE64) is pleased to provide an update on its active exploration drilling program at the flagship Gran Pilar Gold-Silver Project in Sonora, Mexico.","length":305,"tagName":"p"},{"type":"text","content":"Drilling continues to advance efficiently in the South Block following the restart announced earlier this month. Six exploration holes have now been completed across four new high-priority target areas, testing previously un-drilled structural and geochemical corridors with strong potential for gold-silver mineralization.","length":323,"tagName":"p"},{"type":"text","content":"In parallel, the Company has completed a high-resolution drone magnetic survey over the principal target zones, delivering detailed geophysical data that is already being integrated with surface geochemistry and structural mapping to optimize follow-up drilling and trenching. Two water monitoring wells have also been successfully completed as part of the ongoing environmental baseline program in support of the fully permitted Pilot Mine development. All operations are being conducted safely and efficiently at the Gran Pilar project, which is located in a stable mining district of Sonora, far removed from recent conflicts elsewhere in Mexico.","length":649,"tagName":"p"},{"type":"text","content":""This is excellent operational momentum," stated Brodie Sutherland, CEO of Tocvan. "Completing six holes across four new targets in such a short time highlights the team's execution capability and drive to cover as many new targets as quickly as possible. The finished drone magnetic survey adds another layer of high-confidence data, while the water monitoring wells ensure we continue to meet the highest environmental standards as we move toward pilot production. We are eager to receive assay results from these first holes and to keep the drill turning as we unlock the potential of the South Block."","length":629,"tagName":"p"},{"type":"text","content":"The current program is focused on expanding the known mineralized footprint in the South Block, which represents a direct extension of the historic Main Zone. All holes are reverse-circulation (RC) and were drilled to planned depths. Sample...

More updates from Tocvan Ventures Corp.

Tocvan Ventures Corp.South BlockAu