Business
STAR DIAMOND CORPORATION ANNOUNCES ENGAGEMENT WITH MISTY CLIFTON AND SGS FOR A PRE-FEASIBILITY STUDY ON THE STAR - ORION SOUTH DIAMOND PROJECT
STAR DIAMOND CORPORATION ANNOUNCES ENGAGEMENT WITH MISTY CLIFTON AND SGS FOR A PRE-FEASIBILITY ST...

About this update from Star Diamond Corporation
[{"type":"text","content":"\n\n\n\n STAR DIAMOND CORPORATION ANNOUNCES ENGAGEMENT WITH MISTY CLIFTON AND SGS FOR A PRE-FEASIBILITY STUDY ON THE STAR - ORION SOUTH DIAMOND PROJECT\n \n\n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntal{\nTEXT-ALIGN: LEFT\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n \n\n\n\n\n\n Canada NewsWire\n \n\n\n\n\n /NOT FOR DISSEMINATION IN\n \n THE UNITED STATES\n \n OR THROUGH U.S. NEWSWIRES/\n \n\n\n\n TSX: DIAM\n \n\n\n\n\n SASKATOON, SK\n \n\n ,\n \n\n Sept. 9, 2025\n \n\n /CNW/ - Star Diamond Corporation (the \"Company\") (TSX: DIAM) is pleased to announce the engagement of Misty Clifton Engineering LP (MCLP) and SGS Canada Inc (SGS) for a Pre-Feasibility Study (PFS) on the Star – Orion South Diamond Project (the \"Project\").\n \n\n\n\n\n\n\n\n\n The PFS will build on the revised Mineral Resource estimate, which was completed in 2024 and the technical work completed for and since the 2018 Preliminary Economic assessment (PEA). Significant parts of the work completed for the 2018 PEA, including the mining method, process plant design, site layout and infrastructure, can be updated and incorporated into the updated PFS. The consultants have estimated the PFS will be completed during Q4 2026.\n \n\n MCLP is a majority-Indigenous-owned entity (67%) formed with Kineepik Métis Local and Mistawasis Nêhiyawak, co-owned and operated by Clifton Engineering Group Inc. MCLP has a long history of delivering engineering solutions for the Star and Orion South project sites, completing numerous foundation, groundwater and slope stability assessments in support of the project for more than 15 years. MCLP has a local team of principal level technical experts in hydrogeology, hydrology, rock mechanics and regulatory approvals. MCLP will provide PFS level geotechnical, hydrogeological, tailing management and environmental engineering services in support of the Project.\n \n\n SGS has been involved with the project for over 20 years and were the lead consultants in the completion of the 2018 PEA. They have an experienced engineering division that can complete all the min...