Business
Moon River Moly Ltd. Announces Filing of Technical Report for the Endako Mine Restart Preliminary Economic Assessment
Toronto, Ontario--(Newsfile Corp. - January 5, 2026) - Moon River Moly Ltd. (TSXV: MOO) (OTCQB: MRIVF) ("Moon River" or the "Company") announces that the Company has filed an independent technical report entitled the National Instrument NI 43-101 Technical Report for the Endako Mine Restart Preliminary Economic Assessment ("PEA") (the "Endako Mine Restart Technical Report") dated January 5, 2026 with an effective date of November 21, 2025.The Endako mine complex in British Columbia (the "Endako.
About this update from Sojitz Corp.
[{"type":"text","content":"Toronto, Ontario--(Newsfile Corp. - January 5, 2026) - Moon River Moly Ltd. (TSXV: MOO) (OTCQB: MRIVF) ("Moon River" or the "Company") announces that the Company has filed an independent technical report entitled the National Instrument NI 43-101 Technical Report for the Endako Mine Restart Preliminary Economic Assessment ("PEA") (the "Endako Mine Restart Technical Report") dated January 5, 2026 with an effective date of November 21, 2025.","length":488,"tagName":"p"},{"type":"text","content":"The Endako mine complex in British Columbia (the "Endako Mine"), currently on care and maintenance, is comprised of an open-pit molybdenum mine, concentrator, and roaster, located approximately 190 kilometres west of Prince George, British Columbia. The PEA examines the potential restart of operations at the Endako Mine.","length":332,"tagName":"p"},{"type":"text","content":"On May 30, 2024, Moon River completed the indirect acquisition of a 25% interest in the Endako Mine from Sojitz Corporation ("Sojitz"), a Japanese multi-national company. The Endako Mine is jointly owned by Moon River (25%) and Centerra Gold Inc. ("Centerra") (75%) and operates through a joint venture company. While Centerra is aware that this PEA was being prepared for Moon River, it has neither participated in nor endorsed the work.","length":458,"tagName":"p"},{"type":"text","content":"The Endako Mine Restart Technical Report is available under the Company's profile on SEDAR+ at www.sedarplus.ca and on the Company's website at www.moonrivermoly.com.","length":174,"tagName":"p"},{"type":"text","content":"There are no material differences in the Endako Mine Restart Technical Report from the disclosure in the Company's news release dated November 21, 2025. The Report is dated January 5, 2025, with an effective date of November 21, 2025.","length":238,"tagName":"p"},{"type":"text","content":"The Report was prepared by A-Z Mining Professionals Ltd. ("AMPL").","length":76,"tagName":"p"},{"type":"text","content":"Qualified Person(s)","length":19,"tagName":"p"},{"type":"text","content":"The scientific and technical content of this news release was reviewed, verified, and approved by Mr. Brian LeBlanc, P. Eng., President of AMPL, and a "Qualified Person" ("QP"...