Business
Energy Vault Begins Construction of 150 MW SOSA Energy Center in Texas’ ERCOT Market in Q4 2025, Bringing Total Asset Vault Portfolio Under Operation & Construction to Over 340 MW While Growing Cash in the Quarter by ~65% to Over $100 Million
WESTLAKE VILLAGE, Calif., January 05, 2026--Energy Vault Holdings, Inc. (NYSE: NRGV) ("Energy Vault"), a leader in sustainable, grid-scale energy storage solutions, today announced the start of construction of the SOSA Energy Center, a 150 MW/300 MWh battery energy storage system (BESS) located in Madison County, Texas. The project, originally developed by Savion, a subsidiary of Shell plc, was formally acquired by Energy Vault in Q4 2025 under its Asset Vault platform, and is expected to achiev
About this update from Shell Plc
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":462,"url":"https://media.zenfs.com/en/business-wire.com/49ed04900e394017205220b28944df4d"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/jOziBdlMI8N0li9Jn5wldw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTkyNDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/49ed04900e394017205220b28944df4d","width":480,"height":462}},"lazy":false},{"type":"text","content":"Major milestone of fourth Asset Vault project now under construction, ‘safe harbored’ and FEOC compliant as part of broader investment program executed in Q4 2025 for multiple projects","length":184,"tagName":"p","attribs":{}},{"type":"text","content":"Previously acquired from Royal Dutch Shell’s subsidiary Savion, SOSA Energy Center estimates commercial operation by Q2 2027 with expected total revenue of $350M+ over the technical life, or ~$17-20 million of recurring annual, high margin revenues","length":248,"tagName":"p","attribs":{}},{"type":"text","content":"Asset Vault successfully commenced off-site construction in Q4 2025 of three additional projects in its near-term pipeline with expected commercial operation between Q4 2027 and Q4 2028","length":185,"tagName":"p","attribs":{}},{"type":"text","content":"Increased cash and liquidity ~65% in Q4 2025 to over $100 million -- above the high end of the guidance range – well positioned to execute on the Company’s energy asset management strategy","length":188,"tagName":"p","attribs":{}},{"type":"text","content":"WESTLAKE VILLAGE, Calif., January 05, 2026--(BUSINESS WIRE)--Energy Vault Holdings, Inc. (NYSE: NRGV) ("Energy Vault"), a leader in sustainable, grid-scale energy storage solutions, today announced the start of construction of the SOSA Energy Center, a 150 MW/300 MWh battery energy storage system (BESS) located in Madison County, Texas. The project, originally developed by Savion, a subsidiary of Shell plc, was formally acquired by Energy Vault in Q4 2025 under its Asset Vault platform, and is expected to achieve commercial operation by Q2 2027.","length":561,"tagName":"p"},{"type":"text","content":"The construction milestone represents a significant advancement in Energy Vault's "Own & Operate" asset management strategy and demonstrates the com...