Business

Revival Gold Expands Drilling Program After Intersecting 6.4 G/T Gold Over 19 Meters At Beartrack-Arnett

TORONTO, ON / ACCESS Newswire / April 20, 2026 / Revival Gold Inc. (TSXV:RVG) (OTCQX:RVLGF) ("Revival Gold" or the "Company") is pleased to provide initial

articleRevival Gold IncApril 21, 20263/company/revival-gold-inc/news/revival-gold-expands-drilling-program-after-intersecting-64-gt-gold-over-19-meters-at-beartrack-arnett
Revival Gold Expands Drilling Program After Intersecting 6.4 G/T Gold Over 19 Meters At Beartrack-Arnett

About this update from Revival Gold Inc

[{"type":"text","content":" TORONTO, ON / ACCESS Newswire / April 20, 2026 / Revival Gold Inc. (TSXV:RVG) (OTCQX:RVLGF) (\"Revival Gold\" or the \"Company\") is pleased to provide initial drill results from the Joss area at the Company's Beartrack-Arnett Project (\"Beartrack-Arnett\" or the \"Project\") located in Idaho. Highlights Hole BT26-252D intercepted high-grades in a 100-meter step-out to the south with: 5.4 g/T gold over 32.6 meters drilled width at 568 meters downhole; including 6.4 g/T gold over 19.1 meters drilled width at 573 meters downhole; and, 8.0 g/T gold over 4.3 meters drilled width at 596 meters downhole. Two other completed holes, BT26-251DA and BT26-253D, are also confirmed to have intercepted the target shear zone. Assay results are pending. Drilling targeted the expansion of the high-grade underground Mineral Resources in the Joss area, last drilled in 2022. On these results, Revival Gold has extended the drilling program to 4,900 meters of planned core drilling with two rigs turning. Additional extensions are being considered. \"The underground target at Beartrack-Arnett is shaping up to be one of the most promising gold exploration opportunities in the United States. Already a Top 10 new discovery this decade1, step-out holes in the current drilling program at Joss have extended the mineralized zone and highlight the impressive scale of this deposit over 1.2 km of known strike and 700 meters of vertical elevation to-date\", said Hugh Agro, President & CEO. Mr. Agro continued, \"The near vertical dip, together with true widths of 12-16 meters in the mineralized zone in BT26-252D, present the possibility for lower cost underground mining techniques. Adding an underground study to the Beartrack-Arnett open pit heap leach restart project would create a third phase of development for Revival Gold and move the company closer to our target of 300,000 gold ounces per year of gold production from our current assets\". About Joss Target Area The Beartrack-Arnett gold project is a structurally controlled orogenic gold deposit running north-south on the Panther Creek Shear Zone (\"PCSZ\"). In the Joss area, the project hosts an underground Inferred Mineral Resource of 6,745,000 tonnes grading 4.05 grams gold per tonne for 877,000 ounces of gold that is not included in the 2023 first phase open pit, heap leach PFS economics (see \"Prelim...

More updates from Revival Gold Inc