Business
Piramal Pharma Achieves Notable Score Increase on 2025 S&P Global Corporate Sustainability Assessment (CSA)
PPL proudly announces it has achieved an impressive score of 63 on the 2025 S&P Global CSA. This marks a substantial 15% improvement over last year's score of 55, reflecting the Company's ongoing commitment to sustainability and responsible operations.
About this update from Piramal Pharma Limited
[{"type":"list","items":[{"val":[{"type":"text","content":"The S&P Global CSA is an annual test that evaluates the sustainability practices of thousands of companies; it is one of the most respected global sustainability benchmarking frameworks.","length":190,"tagName":"p"}]},{"val":[{"type":"text","content":"Piramal Pharma Limited (PPL), which encompasses, inter alia, both Piramal Pharma Solutions – a leading global Contract Development and Manufacturing Organization (CDMO) – and Piramal Critical Care, earned a 63 on the 2025 S&P Global CSA, placing the Company in the 91st percentile within the pharmaceutical industry. ","length":320,"tagName":"p"}]},{"val":[{"type":"text","content":"This score represents a 15% year-over-year improvement.","length":55,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":565,"olType":false},{"type":"text","content":"MUMBAI, India, Jan. 9, 2026 /PRNewswire/ -- PPL proudly announces it has achieved an impressive score of 63 on the 2025 S&P Global CSA. This marks a substantial 15% improvement over last year's score of 55, reflecting the Company's ongoing commitment to sustainability and responsible operations.","length":308,"tagName":"p"},{"type":"image","alt":"Digwal (Installation of Rooftop Solar System): A 240 kWp rooftop solar system was installed in April 2024 to support on-site renewable energy generation. In FY2025, the system generated approximately 607 GJ of renewable power, contributing to a reduction of 123 tCO₂e emissions. This initiative strengthens our efforts to expand clean energy use within our operations.","displaySize":"","headline":null,"caption":"Digwal (Installation of Rooftop Solar System): A 240 kWp rooftop solar system was installed in April 2024 to support on-site renewable energy generation. In FY2025, the system generated approximately 607 GJ of renewable power, contributing to a reduction of 123 tCO₂e emissions. This initiative strengthens our efforts to expand clean energy use within our operations.","className":"","disableSlideshowImg":false,"size":{"original":{"width":400,"height":165,"url":"https://media.zenfs.com/en/prnewswire.com/abd357ae9ef3a390a7ee667842a4885b"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/nn01W4Sq0jSMSx_WfMxhQQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTcwNTtoPTI5MTtjZj13ZWJw/https://media.zenfs.com/en/prnewswire.com/abd357ae9ef3a390a7ee6678...