Business

Avangrid Achieves Commercial Operation at Two Solar Projects in Oregon

PORTLAND, Ore., February 03, 2026--Avangrid, Inc., a leading energy company and member of the Iberdrola Group, today announced it has achieved commercial operations at two new solar projects in Wasco County, Oregon – Daybreak Solar and Bakeoven Solar – both of which will deliver energy to the Portland General Electric (PGE) power grid. Daybreak Solar, with a capacity of 189 Megawatts DC (140 MWac), and Bakeoven Solar, with a capacity of 80 MWdc (60 MWac), represent new, domestic capacity that wi

articlePge Polska Grupa Energetyczna S.a.February 3, 20265/company/pge-polska-grupa-energetyczna-sa/news/avangrid-achieves-commercial-operation-at-two-solar-projects-in-oregon-2
Avangrid Achieves Commercial Operation at Two Solar Projects in Oregon

About this update from Pge Polska Grupa Energetyczna S.a.

[{"type":"image","alt":"Bakeoven Solar with Oregon’s Mt. Hood in the background","displaySize":"","headline":null,"caption":"Bakeoven Solar with Oregon’s Mt. Hood in the background","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":360,"url":"https://media.zenfs.com/en/business-wire.com/749c7598aba079b6dad2b753deb59101"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/42iZoD1t12LuSxVtagNlpQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTcyMDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/749c7598aba079b6dad2b753deb59101","width":480,"height":360}},"lazy":false},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":233,"url":"https://media.zenfs.com/en/business-wire.com/08dd625201098dac3c8a82ef8e667458"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/8LgtjUrgg.b1yvcO2.rAuQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ2NjtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/08dd625201098dac3c8a82ef8e667458","width":480,"height":233}}},{"type":"text","content":"Daybreak Solar and Bakeoven Solar, first commercial-scale solar projects in Wasco County, Oregon, deliver combined capacity of 269 MWdc (200 MWac)","length":146,"tagName":"p","attribs":{}},{"type":"text","content":"Projects deliver energy to Portland General Electric through Green Future Impact program, a voluntary program designed to support large industrial customers like Intel","length":167,"tagName":"p","attribs":{}},{"type":"text","content":"PORTLAND, Ore., February 03, 2026--(BUSINESS WIRE)--Avangrid, Inc., a leading energy company and member of the Iberdrola Group, today announced it has achieved commercial operations at two new solar projects in Wasco County, Oregon – Daybreak Solar and Bakeoven Solar – both of which will deliver energy to the Portland General Electric (PGE) power grid. Daybreak Solar, with a capacity of 189 Megawatts DC (140 MWac), and Bakeoven Solar, with a capacity of 80 MWdc (60 MWac), represent new, domestic capacity that will support growing demand for electricity and bolster the region’s energy availability and reliability.","length":620,"tagName":"p"},{"type":"text","content":""Completing these two projects marks the latest milestone in a pivotal investment in Wasco County, bringing new jobs, mo...

More updates from Pge Polska Grupa Energetyczna S.a.

Wasco CountyBakeovenpower gridOregonPortland General Electricsolar projectsAvangridsolar panelsPGEAvangrid, Inc.clean energy