Business

Pan Global Resources Commences 3,500m Drill Program at Escacena Project, Spain

Phase 3 drill program commenced at La Romana Up to 25 drill holes, approximately 3,500 me...

articlePan Global Resources Inc.August 10, 20203/company/pan-global-resources-inc/news/pan-global-resources-commences-3500m-drill-program-at-escacena-project-spain
Pan Global Resources Commences 3,500m Drill Program at Escacena Project, Spain

About this update from Pan Global Resources Inc.

[{"type":"text","content":"Pan Global Resources Commences 3,500m Drill Program at Escacena Project, SpainPhase 3 drill program commenced at La RomanaUp to 25 drill holes, approximately 3,500 meters, to significantly expand the copper mineralizationFully funded for expanded drill programVancouver, British Columbia--(Newsfile Corp. - August 10, 2020) - Pan Global Resources Inc. (TSXV: PGZ) (OTC: PGNRF) (the \"Company\") is pleased to announce follow-up drilling has now commenced at the La Romana copper target in the Escacena Project, Iberian Pyrite Belt, southern Spain. Tim Moody, President and CEO of Pan Global commented: \"We are excited to once again be drilling at the La Romana target. The aim of this drill phase is to start defining the geometry and significantly expand the copper mineralization over approximately 800 meters of strike. The planned drill holes will also test the multi-layer potential and help to define vectors to areas of stronger mineralization.\"The Phase 3 drill program includes up to twenty-five core holes for a total of approximately 3,500 meters. The planned drilling includes step-out holes testing strike and dip extensions of the copper mineralization intersected in the previous drill holes. The drilling will progress on approximately 50-meter centers in all directions from the previous drill holes and also include several step-out holes beyond 50 meters. This program will also further test two large down-hole EM conductor plate anomalies and multi-layer copper potential. The down-hole EM conductor plates coincide with the copper mineralization in two separate layers and indicate potential for the mineralization to extend along strike, up and down dip. The drill hole sequence will be adjusted as the program advances according to results. One drill rig is currently operating with the potential to add a second rig as the program advances. Pan Global is fully funded for an expanded drill program. Previous highlights include drill hole LRD-02[1] which intersected 20.55m at 1.5% CuEq (1.02% Cu, 0.11% Sn, 4.7g/t Ag) from 37m, including 7m at 3.43% CuEq and hole LRD-05[2] which intersected 21m at 1.55% CuEq (1.19% Cu, 0.07% Sn, 5.8g/t Ag) from 16m down-hole depth. The copper mineralization occurs in at least three shallow north dipping (approximately 30-35 degrees) copper layers extending from near surface. Historical mise-a-la-masse an...

More updates from Pan Global Resources Inc.