Business
Osisko Metals Launches Fall 2019 Exploration Program at Pine Point
MONTREAL, Aug. 27, 2019 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased

About this update from Osisko Metals Incorporated
[{"type":"text","content":" MONTREAL, Aug. 27, 2019 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce it has launched its fall 2019 exploration drilling program at the Pine Point Project in the Northwest Territories, Canada. Highlights: Airborne gravity gradiometry survey completed and awaiting data processing Prioritized drill-ready targets defined from compilation of previous work 5000-meter drill program starting this week Jeff Hussey, P. Geo., Osisko Metals President and CEO, commented: “We are excited to initiate our exploration program focused on new near-surface lead-zinc targets at Pine Point. Following extensive compilation work and advanced geological modelling, our exploration team has a better understanding of the structural controls associated to the distribution of lead-zinc mineralization in the 60-km long system. We have identified several high priority targets that were not explored by previous operators.” “The exploration upside is quite substantial across the entire property. We strongly believe there remains multiple opportunities to significantly increase the resource base beyond our current Mineral Resource Estimate of 38.4 Mt grading 6.58% ZnEq (see note below).” Exploration Targets at Pine Point Orphan Drill Holes: A compilation of the historical drill hole data into a new database identified over 100 drill holes with significant mineralization, indicative of near-surface mineralizing systems that were not pursued by previous operators (See Table 1 below for partial list). These holes are located outside of the current resource model. Deeper Mineralization: The camp also hosts potential for mineralization in the deeper underlying Pine Point Formation (approximately 50-70 meters thick), which has seen less historical exploration. Analysis of the new drillhole database and resultant 3D modeling shows dolomite alteration, sulphide development and controlling structures to be present in this poorly explored formation that hosted the large, and previously mined X-15 deposit (historical production of 17,474,260 at 6.2% Zn, 2.00% Pb, Cominco Limited 1988). Table 1: Highlighted Intersections in Exploration Target Areas Hole Number Trend Zone AreaProximity Width Zinc Lead Zi...