Business

Osisko Intersects 738 Metres Averaging 0.31% Cu at Gaspé

MONTRÉAL, Jan. 22, 2026 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the " Company " or "...

articleOsisko Metals IncorporatedJanuary 22, 20263/company/osisko-metals-incorporated/news/osisko-intersects-738-metres-averaging-031percent-cu-at-gaspandxe9
Osisko Intersects 738 Metres Averaging 0.31% Cu at Gaspé

About this update from Osisko Metals Incorporated

[{"type":"text","content":"Osisko Intersects 738 Metres Averaging 0.31% Cu at Gaspé\nMONTRÉAL, Jan. 22, 2026 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the \"Company\" or \"Osisko Metals\") (TSX: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce new drill results from the Gaspé Copper Project, located in the Gaspé Peninsula of Eastern Québec. New analytical results are presented below (see Table 1), including 29 mineralized intercepts from ten new drill holes. Infill intercepts are located inside the 2024 MRE model (see November 14, 2024 news release), and are focused on upgrading inferred mineral resources to measured or indicated categories, as applicable. Expansion intercepts are located outside the 2024 MRE model and may potentially lead to additional resources that will be classified appropriately within the next MRE update. Some of the reported intercepts have contiguous shallower infill as well as deeper expansion (noted on Table 1 below as “Both”). Maps showing hole locations are available at www.osiskometals.com. Highlights: Drill hole 30-1155 738.0 metres averaging 0.31% Cu (0.41% CuEq – infill and expansion) Drill hole 30-1156 760.5 metres averaging 0.26% Cu (0.35% CuEq – infill and expansion) Drill hole 30-1154 726.0 metres averaging 0.21% Cu (0.31% CuEq – infill and expansion) Drill hole 30-1148 613.5 metres averaging 0.22% Cu (0.32% CuEq – infill and expansion) Drill hole 30-1151 484.5 metres averaging 0.27% Cu (0.41% CuEq – infill and expansion) Drill hole 30-1149 395.0 metres averaging 0.26% Cu (0.30% CuEq – infill) Drill hole 30-1150 340.5 metres averaging 0.21% Cu (0.30% CuEq – infill and expansion) Drill hole 30-1153 310.0 metres averaging 0.26% Cu (0.31% CuEq – infill) Drill hole 30-1147 228.0 metres averaging 0.26% Cu (0.31% CuEq – expansion) Table 1: Infill and Expansion Drilling Results DDH No.From (m)To (m)Length (m)Cu %Ag g/tMo %CuEq* %Type**30-114711.3174.0162.70.171.08<0.0050.19InfillAnd217.5271.554.00.131.710.0110.18InfillAnd355.5601.5246.00.181.030.0130.24Both(including)355.5528.7173.20.201.080.0130.25Infill(including)528.7601.572.80.130.900.0150.19ExpansionAnd627.0687.060.00.130.780.0270.24ExpansionAnd718.5946.5228.00.261.090.0120.31Expansion30-114872.5241.5169.00.171.52<0.0050.19InfillAnd345.0958.5613.50.2...

More updates from Osisko Metals Incorporated