Business

Orezone’s Ongoing Grade Control Program Returns Consistent High-Grade Intercepts in the A2 Starter Pit at the Bomboré Gold Project

VANCOUVER, British Columbia, June 09, 2022 (GLOBE NEWSWIRE) -- Orezone Gold Corporation (TSX: ORE, OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to repo

articleOrezone Gold CorporationJune 9, 20224/company/orezone-gold/news/orezones-ongoing-grade-control-program-returns-consistent-high-grade-intercepts-in-the-a2-starter-pit-at-the-bombore-gold-project
Orezone’s Ongoing Grade Control Program Returns Consistent High-Grade Intercepts in the A2 Starter Pit at the Bomboré Gold Project

About this update from Orezone Gold Corporation

[{"type":"text","content":" VANCOUVER, British Columbia, June 09, 2022 (GLOBE NEWSWIRE) -- Orezone Gold Corporation (TSX: ORE, OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to report further assay results from the maiden grade control (“GC”) reverse circulation (“RC”) drill program at the Bomboré Gold Project, located in Burkina Faso. GC drilling to-date is focused on near-surface oxide mineralization within the starter pits located in the northern portion of the mining lease. These starter pits will be the source of higher-grade oxide mill feed for the first year of production and are denoted as A1, A2, A3, H1, H2, and H3 (see Figure 1 below). GC results for Pit A2 are now available and similar to Pit A1 (see news release dated April 7, 2022 for A1 Pit GC results), are very encouraging. Results have returned several significant thicker high-grade intervals where localized zones of higher grades were intersected in several holes which collared or ended in mineralization. Some of these zones reported remain open in several areas (see Figures 2 and 3). Drilling Highlights 4.00 m of 22.42 g/t Au from 27.00 m 31.00 m of 2.30 g/t Au from 0.00 m 31.00 m of 2.17 g/t Au from 0.00 m 20.00 m of 2.43 g/t Au from 11.00 m 18.00 m of 2.61 g/t Au from 13.00 m 26.00 m of 1.79 g/t Au from 5.00 m 31.00 m of 1.49 g/t Au from 0.00 m 31.00 m of 1.48 g/t Au from 0.00 m 31.00 m of 1.47 g/t Au from 0.00 m 27.00 m of 1.68 g/t Au from 0.00 m 2.00 m of 21.98 g/t Au from 10.00 m 24.00 m of 1.83 g/t Au from 0.00 m 25.00 m of 1.74 g/t Au from 6.00 m 11.00 m of 3.79 g/t Au from 17.00 m 24.00 m of 1.61 g/t Au from 7.00 m 28.00 m of 1.37 g/t Au from 3.00 m 18.00 m of 2.08 g/t Au from 13.00 m 20.00 m of 1.77 g/t Au from 0.00 m 7.00 m of 4.76 g/t Au from 5.00 m 17.00 m of 1.92 g/t Au from 0.00 m 17.00 m of 1.84 g/t Au from 13.00 m 18.00 m of 1.68 g/t Au from 8.00 m 18.00 m of 1.63 g/t Au from 13.00 m 11.00 m of 2.67 g/t Au from 7.00 m 9.00 m of 3.22 g/t Au from 14.00 m 18.00 m of 1.53 g/t Au from 3.00 m 9.00 m of 2.90 g/t Au from 19.00 m 15.00 m of 1.74 g/t Au from 10.00 m 10.00 m of 2.56 g/t Au from 21.00 m 12.00 m of 2.07 g/t Au from 4.00 m 12.00 m of 2.05 g/t Au from 9.00 m 10.00 m of 2.40 g/t Au from 21.00 m 5.00 m of 4.73 g/t Au from 6.00 m 7.00 m of 3.19 g/t Au from 8.00 m 5.00 m of 3.60 g/t Au from 0.00 m 9.00 m of 1.92 g/t Au from 22.00 m 11.00 m of 1.52 g/t Au from 0.00 m ...

More updates from Orezone Gold Corporation