Business
NUVVE JAPAN to Launch 2MW/8MWh Grid-Scale Battery Storage Project in Mino City, Gifu, Japan
SAN DIEGO & TOKYO, January 06, 2026--NUVVE JAPAN K.K. (Headquarters: Minato-ku, Tokyo; ("Nuvve Japan") today announced it has secured the rights to install and operate a grid-scale battery energy storage system (BESS) in Oyada, Mino City, Gifu Prefecture. The project will feature a rated output of 2MW and a storage capacity of 8MWh (4-hour duration), with operations scheduled to commence in November 2026.
About this update from Nuvve Holding Corp.
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":960,"height":375,"url":"https://media.zenfs.com/en/business-wire.com/96499c36f52f4263036e3f98b67a5307"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/uC70uk_bAoLGLZn6PE5epA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTM3NTtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/96499c36f52f4263036e3f98b67a5307","width":960,"height":375},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/eDTV9MXQS4p0mO6kLxDhHg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTE5MjA7aD03NTA7Y2Y9d2VicA--/https://media.zenfs.com/en/business-wire.com/96499c36f52f4263036e3f98b67a5307","width":960,"height":375}},"lazy":false},{"type":"text","content":"— Leveraging Non-Firm Connection Benefits and the Globally-Proven "Nuvve Platform" to Maximize Profitability —","length":120,"tagName":"p"},{"type":"text","content":"— Total Contract Capacity Reaches 6MW —","length":39,"tagName":"p"},{"type":"text","content":"SAN DIEGO & TOKYO, January 06, 2026--(BUSINESS WIRE)--NUVVE JAPAN K.K. (Headquarters: Minato-ku, Tokyo; ("Nuvve Japan") today announced it has secured the rights to install and operate a grid-scale battery energy storage system (BESS) in Oyada, Mino City, Gifu Prefecture. The project will feature a rated output of 2MW and a storage capacity of 8MWh (4-hour duration), with operations scheduled to commence in November 2026.","length":439,"tagName":"p"},{"type":"text","content":"With the acquisition of this project, Nuvve Japan's total contract capacity has reached 6MW. This project serves as another milestone for NUVVE JAPAN as it expands deployments and capacity across Japan.","length":206,"tagName":"p"},{"type":"text","content":"Project Features and Strategic Advantages Include:","length":50,"tagName":"p"},{"type":"text","content":"1. Advanced Market Operation via the Globally Proven "Nuvve Platform": The project will be powered by the "Nuvve Platform," which has a track record of aggregating diverse EVs and stationary batteries across North America and Europe.","length":253,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"High-Precision Forecasting and Bidding: By the start of operations in November 2026, the Company will further refine its Japan-specific market data. The pr...