Business

NexGold Intersects 9.30 g/t Gold Over 11.0 Metres and 2.31 g/t Gold Over 21.5 Metres at the Goldlund Deposit, Ontario

TORONTO, Feb. 25, 2026 (GLOBE NEWSWIRE) -- NexGold Mining Corp. ( TSXV: NEXG; OTCQX: NXGCF) ...

articleNexgold Mining Corp.February 25, 20263/company/nexgold-mining-corp/news/nexgold-intersects-930-gt-gold-over-110-metres-and-231-gt-gold-over-215-metres-at-the-goldlund-deposit-ontario
NexGold Intersects 9.30 g/t Gold Over 11.0 Metres and 2.31 g/t Gold Over 21.5 Metres at the Goldlund Deposit, Ontario

About this update from Nexgold Mining Corp.

[{"type":"text","content":"NexGold Intersects 9.30 g/t Gold Over 11.0 Metres and 2.31 g/t Gold Over 21.5 Metres at the Goldlund Deposit, Ontario\nTORONTO, Feb. 25, 2026 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide additional results from the recently-announced diamond drilling program, which comprises up to 25,000 metres at the Goliath Gold Complex (comprised of the Goliath, Goldlund and Miller Deposits). The drill program is focused on the Goldlund Deposit, with holes designed to infill and potentially expand open pit mineral resources. The results presented in this news release include 1,883 metres of diamond drilling in five drill holes (GL-25-009 to GL-25-011, GL-25-013 and GL-25-014) that specifically infill mineralization areas located within, or near the base of, the open pit Mineral Resource and generally within the current Inferred category within Zone 4 mineralization (Figure 1; Table 2). Selected drill intercepts from diamond drill holes at the Goldlund Deposit in this news release are further detailed in Table 1 and include: 9.30 g/t gold over 11.0 metres (from 232.0 to 243.0 metres), including 64.10 g/t gold over 0.9 metres and 39.70 g/t gold over 1.0 metres in drill hole GL-25-010;2.31 g/t gold over 21.5 metres (from 238.6 to 260.1 metres), including 30.10 g/t gold over 0.7 metres, 24.5 g/t gold over 0.5 metres and 7.64 g/t gold over 0.9 metres in drill hole GL-25-011;1.18 g/t gold over 33.5 metres (from 183.5 to 217.0 metres), including 18.00 g/t gold over 1.0 metres and 7.99 g/t gold over 1.0 metres; additionally, 62.30 g/t gold was intersected over 1.0 metres (from 226.0 to 227.0 metres), in drill hole GL-25-009;2.34 g/t gold over 10.2 metres (from 199.3 to 209.5 metres), including 15.8 g/t gold over 0.7 metres and 5.08 g/t gold over 0.8 metres in drill hole GL-25-013; and1.03 g/t gold over 16.5 metres (from 350.5 to 367.0 metres), including 5.25 g/t gold over 0.8 metres and 4.34 g/t gold over 2.0 metres in drill hole GL-25-014; additionally 28.9 g/t gold was intersected over 1.5 metres (from 129.5 to 131.0 metres) in the same drill hole. Kevin Bullock, President and CEO of NexGold, commented: “These additional drill results from the infill drill program at Goldlund demonstrate a strong tenor of gold mineralization at dee...

More updates from Nexgold Mining Corp.