Business

Myriad Uranium Announces Filing of Comprehensive Technical Report on Copper Mountain, Provides Details of Planned Phase II Drill Program

Vancouver, British Columbia--(Newsfile Corp. - April 20, 2026) - Myriad Uranium Corp. (CSE: M) (OTCQB: MYRUF) (FSE: C3Q) ("Myriad" or the "Company") is pleased to announce that it has voluntarily filed a Technical Report having an effective date of March 31, 2026 and a report date of April 15, 2026 (the "Technical Report") for the Copper Mountain Uranium Project in Fremont County, Wyoming, USA. The Technical Report was prepared in accordance with National Instrument 43-101 - Standards of...

articleMyriad Uranium CorpApril 20, 20268/company/myriad-uranium-corp-formerly-was-mmcmyriad-metals-corp-until-2022-12-13/news/myriad-uranium-announces-filing-of-comprehensive-technical-report-on-copper-mountain-provides-details-of-planned-phase-ii-drill-program
Myriad Uranium Announces Filing of Comprehensive Technical Report on Copper Mountain, Provides Details of Planned Phase II Drill Program

About this update from Myriad Uranium Corp

[{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - April 20, 2026) - Myriad Uranium Corp. (CSE: M) (OTCQB: MYRUF) (FSE: C3Q) ("Myriad" or the "Company") is pleased to announce that it has voluntarily filed a Technical Report having an effective date of March 31, 2026 and a report date of April 15, 2026 (the "Technical Report") for the Copper Mountain Uranium Project in Fremont County, Wyoming, USA. The Technical Report was prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects and is available under the Company's SEDAR+ profile at www.sedarplus.ca and can also be accessed here. Myriad also announces a Phase II drill campaign for Copper Mountain.","length":730,"tagName":"p"},{"type":"text","content":"Myriad Plans Phase II Drilling","length":30,"tagName":"p"},{"type":"text","content":"The Company launched a successful maiden drill program in November 2024. It then reported strong drill results (reported here) and follow-up assays throughout 2025 which highlighted and confirmed extensive positive disequilibrium at Copper Mountain (reported here). It also announced the continued review and analysis of historical data and information, including the 1982 Bendix exploration targeting study reports conducted for the US Department of Energy (reported here), and finally the completion of high-resolution airborne geophysics in December 2025 (reported here).","length":574,"tagName":"p"},{"type":"text","content":"This in-depth work over the last 15 months has provided an array of high priority target areas which have been identified for follow-up exploration drilling. This plan calls for an initial 4,500 metres (15,000 feet) with contingent increases to between 7,000 m to 10,000 m (23,000 ft and 33,000 ft) and beyond, subject to results and funding conditions. The drilling will initially focus on confirmation drilling at a selection of known historical targets and extend to drilling at new targets identified through the Bendix studies and corroborated by the recent geophysical surveys completed over Copper Mountain.","length":614,"tagName":"p"},{"type":"text","content":"Myriad's CEO, Thomas Lamb, commented: "We are entering Phase II with a high level of conviction. Our maiden drill program surpassed expectations by a significant margin, confirming extensive...

More updates from Myriad Uranium Corp

Copper Mountain Uranium ProjectMyriad Uranium Corp.historical datathe CompanyNational Instrument 43-101Technical ReportMyriadCompanyMineral Resources