Business
Monument Announces First 16 Drill Hole Results Of Selinsing Mine Expansion Drilling Program
VANCOUVER, British Columbia, Dec. 03, 2025 (GLOBE NEWSWIRE) -- Monument Mining Limited (TSX-V: MM...

About this update from Monument Mining Limited
[{"type":"text","content":"Monument Announces First 16 Drill Hole Results Of Selinsing Mine Expansion Drilling Program\n\n\n\n VANCOUVER, British Columbia, Dec. 03, 2025 (GLOBE NEWSWIRE) -- Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)(\"Monument\" or the \"Company\") is pleased to announce the first 16 drill hole results from its first BR/Felda mine expansion drilling program and update mine expansion drilling activities at the Selinsing Gold Mine including Selinsing and Buffalo Reef gold projects, located in Pahang State on the Central Gold Belt of Western Malaysia.\n \n\n Ms. Cathy Zhai, President and CEO of Monument Mining commented: \"We are encouraged by the first 16 drill hole assay results from the exploration drill program within targeted potential mine expansion areas, including both outside of Buffalo Reef/Felda pit shells (“BR/Felda mine expansion drilling”) and Selinsing pit shells (“Selinsing mine expansion drilling”) with boundary covering all existing defined resources (www.SedarPlus.ca: NI43-101 Technical Report “Selinsing Gold Sulphide Project”, January 31, 2019) (the “targeting mine expansion areas”). Objective of expansion drilling is aimed to increase gold resources and potentially expanded the life of mine at Selinsing Gold Mine.”\n \n\n BR/Felda mine expansion target Area covers 115 acres of land, laying the foundation to evaluate the potential to extend the currently defined Mineral Resources, which may inform future LOM planning subject to further studies (\n \n Figure 1)\n \n . Success of the current drilling would have the potential to support the pit expansion at Buffalo Reef/Felda.\n \n\n Buffalo Reef/Felda expansion drilling started on May 7\n \n th\n \n , 2025. To date 27 drill holes have been completed for 2,952m.\n \n\n\n Figure 1. Plan view of Buffalo Reef Central\n \n\n depicting LOM pit shells the footprint of the Expanded Pit Shell.\n \n\n\n\n\n\n\n\n DRILL PROGRAM HIGHLIGHTS\n \n\n\n The first twenty-seven (27) drill holes of the Buffalo Reef/Felda Mine Expansion Drilling Program have been completed, with high gold assay results returned.\n \n\n\n Assay results for sixteen (16) drill holes have been received; results from eleven (11) holes are outstanding.\n \n\n\n Significant highlights include:\n \n\n\n\n\n\n\n MBRRC579:\n \n\n 22m @ 0.86g/t from 2m...