Company news

Max Resource Corp (TSXV:MAX) news

Max Resource Corp news releases on 6ix. Latest, Mar 13, 2015: MAX to Voluntarily Terminate Its Share Registration in U.S.

View Max Resource Corp →

Press releases — page 5

MAX to Voluntarily Terminate Its Share Registration in U.S.

March 13, 2015

MAX Completes Share Consolidation

February 24, 2015

MAX Announces Effective Date for Share Consolidation

February 23, 2015

MAX Announces Positive Metallurgical Results from Majuba Hill, Nevada, with Leach Recoveries of 84.6% for Copper and 73.4% for Silver

March 4, 2013

MAX agrees to acquire 100% of Majuba Hill Silver/Copper/Gold Property in Nevada

December 4, 2012

MAX step-out drilling extends mineralized oxide zone at DeSoto discovery, Majuba Hill, Nevada; highlights include 6.4 m @ 38.8 g/t Ag and 0.70% copper (105.1 g/t AgEq) and 7.8 m of 28 g/t Ag and 0.57% Cu (81.5 g/t AgEq)

October 2, 2012

MAX drills 4.6 m @ 58.0 g/t Ag and 7.6 m @ 0.80% copper within an overall mineralized intercept of 332 m @ 12.0 g/t Ag and 0.13% Cu (23.9 g/t AgEq) in oxides at Majuba Hill, Nevada; new historic data confirms extension of high-grade mineralized system 500 m to the southeast of Majuba Hill mine and to a depth of 350 m from surface

September 11, 2012

MAX completes eight drill holes at Majuba Hill silver/copper/gold project in Nevada

June 14, 2012

MAX begins Phase III drill program at Majuba Hill copper/silver/gold oxide project in Nevada.

May 3, 2012

MAX acquires additional 560 acres to cover the northwest extension of high grade copper/silver mineralization identified in soils at Majuba Hill, Nevada; drilling scheduled to resume in May

April 26, 2012

MAX files drill permit for 5,000 metre Phase III drill program to test extension of high grade copper/silver/gold oxide mineralization at Majuba Hill, Nevada in May 2012.

April 3, 2012

MAX drills 293 m of 5.49 g/t silver, 0.10 g/t gold and 0.09% copper in porphyry-style alteration zone with significant sulfides at Majuba Hill, Nevada

March 15, 2012

MAX appoints Ian Smith, F.AusIMM, as Director

February 22, 2012

MAX drills 29.2 m of 30.5 g/t Ag and 0.69% Cu in step-out drilling at DeSoto discovery, Majuba Hill, Nevada

February 7, 2012

MAX completes Phase II drill program Majuba Hill copper/silver project in Nevada; additional soil sampling completed at newly discovered DeSoto zone

December 14, 2011

MAX commences Phase II drill program at Majuba Hill copper/silver project in Nevada to follow up on recent high-grade drill results

October 31, 2011

MAX drills 44.2 m of 71.0 g/t (2.28 oz/t) Silver and 1.14% Copper at Majuba Hill, Nevada

October 25, 2011

MAX drills 13.7 m of 30 g/t (0.96 oz/t) silver and 0.47% copper in fourth hole at Majuba Hill, Nevada; additional assay results pending

October 12, 2011

MAX drills 42.7 m of 37.5 g/t (1.21 oz/t) Ag and 0.38% Cu at Majuba Hill; includes 10.7 m of 90.2 g/t (2.90 oz/t) Ag and 0.93% Cu

September 27, 2011

MAX samples up to 1.53% Cu and 209 g/t Ag in soils at Majuba copper/silver project in Nevada; permitting underway for additional drilling

September 15, 2011

MAX completes soil sampling and additional drilling at Majuba Hill copper/silver project in Nevada

August 8, 2011

MAX commences drill program at Majuba Hill copper/silver project in Nevada

June 9, 2011

MAX drills 9.6 metres of 1.04 g/t Au at Table Top in Nevada, extends strike of mineralization by 244 metres

May 31, 2011

AllPennyStocks.com Announces Corporate Write-Up on MAX Resource Corp. (TSX-Venture:MXR) (OTCBB:MXROF)

April 12, 2011

MAX completes six core drill holes at Table Top gold project in Nevada; drilling to begin at Majuba Hill copper/silver project in April

April 12, 2011

MAX completes six core drill holes at Table Top gold project in Nevada; drilling to begin at Majuba Hill copper/silver project in April.

April 12, 2011

MAX begins exploration at historic Majuba Hill Copper/Gold/Silver Property in Nevada; excavation underway for April drill program

March 30, 2011

MAX resumes drilling at Table Top gold project in Nevada, immediately south of the Newmont/Fronteer Sandman gold project

March 17, 2011

MAX acquires interest in Majuba Hill Copper/Gold/Silver Property in Nevada; exploration to focus on high-grade silver and copper potential

March 4, 2011

MAX to resume drilling at Table Top gold project in Nevada, immediately south of Fronteer Gold's Sandman gold property. Sandman is one of three Nevada properties being acquired by Newmont Mining Corp.

February 17, 2011

MAX extends mineralized drill interval to 12.1 m of 0.91 g/t Au at Table Top, Nevada

January 18, 2011

AllPennyStocks.com News: Vancouver-Based Junior Exploration Company Sees Volume Increase on Assay Results

November 26, 2010

MAX assays 7.62 meters of 0.588 g/t gold, including 1.359 g/t gold over 1.52 m, in drill core at Diamond Peak gold/silver/zinc property in Nevada; MAX samples 53.5 g/t silver in outcrop.

November 24, 2010

MAX to drill East Manhattan Wash, Nevada in October; additional soil samples of up to 1.27 g/t gold

September 27, 2010

Max completes soil sampling at Diamond Peak gold/silver/zinc property in Nevada; drill permit granted

September 22, 2010

MAX begins drilling to test mineralized structure at depth at Table Top gold project in Nevada.

September 7, 2010

Eastfield Resources Update on Iron Lake Project, BC

July 22, 2010

Max to begin exploration at its Diamond Peak Gold/Zinc Property, Nevada; adds additional 96 claims

June 29, 2010

MAX drills 27.4 meters of 0.467 g/t gold and 3 meters of 1.79 g/t gold at Table Top, Nevada; deeper drilling planned

June 22, 2010

Eastfield Resources Update on Kilometre 26 Gold Nickel Project, BC

June 7, 2010

MAX completes drill program at Table Top gold project; Drilling commences at Diamond Peak gold/zinc project in Nevada

May 19, 2010

Eastfield Signs Agreement to Option Out Indata Gold-Copper Project, BC

May 18, 2010

Eastfield Resources Announces the Return of the Zymo Copper Gold Project

May 3, 2010

MAX drills 0.823 g/t gold over 4.6 meters in silicified breccia at Table Top, Nevada; intersects potential Carlin style lamprophyre feeder system

May 3, 2010

MAX intersects mineralized zone of silicified breccia during drilling at Table Top gold project in Nevada.

April 19, 2010

MAX begins drilling at Table Top gold project in Nevada.

April 7, 2010

MAX receives drill permit for Table Top gold project in Nevada

March 8, 2010

Eastfield Resources Responds to the BC Government No Mining in the Flathead Valley Will Seek Compensation

February 10, 2010

B.C. Provincial Government halts mineral exploration in Flathead Valley

February 10, 2010

MAX stakes additional 139 claims at Table Top gold project in Nevada; Kokanee to drill MAX's Diamond Peak gold/zinc project in 2010

January 18, 2010

← Newer · Older →