Company news
Max Resource Corp (TSXV:MAX) news
Max Resource Corp news releases on 6ix. Latest, Mar 13, 2015: MAX to Voluntarily Terminate Its Share Registration in U.S.
Press releases — page 5
MAX to Voluntarily Terminate Its Share Registration in U.S.
March 13, 2015
MAX Completes Share Consolidation
February 24, 2015
MAX Announces Effective Date for Share Consolidation
February 23, 2015
MAX Announces Positive Metallurgical Results from Majuba Hill, Nevada, with Leach Recoveries of 84.6% for Copper and 73.4% for Silver
March 4, 2013
MAX agrees to acquire 100% of Majuba Hill Silver/Copper/Gold Property in Nevada
December 4, 2012
MAX step-out drilling extends mineralized oxide zone at DeSoto discovery, Majuba Hill, Nevada; highlights include 6.4 m @ 38.8 g/t Ag and 0.70% copper (105.1 g/t AgEq) and 7.8 m of 28 g/t Ag and 0.57% Cu (81.5 g/t AgEq)
October 2, 2012
MAX drills 4.6 m @ 58.0 g/t Ag and 7.6 m @ 0.80% copper within an overall mineralized intercept of 332 m @ 12.0 g/t Ag and 0.13% Cu (23.9 g/t AgEq) in oxides at Majuba Hill, Nevada; new historic data confirms extension of high-grade mineralized system 500 m to the southeast of Majuba Hill mine and to a depth of 350 m from surface
September 11, 2012
MAX completes eight drill holes at Majuba Hill silver/copper/gold project in Nevada
June 14, 2012
MAX begins Phase III drill program at Majuba Hill copper/silver/gold oxide project in Nevada.
May 3, 2012
MAX acquires additional 560 acres to cover the northwest extension of high grade copper/silver mineralization identified in soils at Majuba Hill, Nevada; drilling scheduled to resume in May
April 26, 2012
MAX files drill permit for 5,000 metre Phase III drill program to test extension of high grade copper/silver/gold oxide mineralization at Majuba Hill, Nevada in May 2012.
April 3, 2012
MAX drills 293 m of 5.49 g/t silver, 0.10 g/t gold and 0.09% copper in porphyry-style alteration zone with significant sulfides at Majuba Hill, Nevada
March 15, 2012
MAX appoints Ian Smith, F.AusIMM, as Director
February 22, 2012
MAX drills 29.2 m of 30.5 g/t Ag and 0.69% Cu in step-out drilling at DeSoto discovery, Majuba Hill, Nevada
February 7, 2012
MAX completes Phase II drill program Majuba Hill copper/silver project in Nevada; additional soil sampling completed at newly discovered DeSoto zone
December 14, 2011
MAX commences Phase II drill program at Majuba Hill copper/silver project in Nevada to follow up on recent high-grade drill results
October 31, 2011
MAX drills 44.2 m of 71.0 g/t (2.28 oz/t) Silver and 1.14% Copper at Majuba Hill, Nevada
October 25, 2011
MAX drills 13.7 m of 30 g/t (0.96 oz/t) silver and 0.47% copper in fourth hole at Majuba Hill, Nevada; additional assay results pending
October 12, 2011
MAX drills 42.7 m of 37.5 g/t (1.21 oz/t) Ag and 0.38% Cu at Majuba Hill; includes 10.7 m of 90.2 g/t (2.90 oz/t) Ag and 0.93% Cu
September 27, 2011
MAX samples up to 1.53% Cu and 209 g/t Ag in soils at Majuba copper/silver project in Nevada; permitting underway for additional drilling
September 15, 2011
MAX completes soil sampling and additional drilling at Majuba Hill copper/silver project in Nevada
August 8, 2011
MAX commences drill program at Majuba Hill copper/silver project in Nevada
June 9, 2011
MAX drills 9.6 metres of 1.04 g/t Au at Table Top in Nevada, extends strike of mineralization by 244 metres
May 31, 2011
AllPennyStocks.com Announces Corporate Write-Up on MAX Resource Corp. (TSX-Venture:MXR) (OTCBB:MXROF)
April 12, 2011
MAX completes six core drill holes at Table Top gold project in Nevada; drilling to begin at Majuba Hill copper/silver project in April
April 12, 2011
MAX completes six core drill holes at Table Top gold project in Nevada; drilling to begin at Majuba Hill copper/silver project in April.
April 12, 2011
MAX begins exploration at historic Majuba Hill Copper/Gold/Silver Property in Nevada; excavation underway for April drill program
March 30, 2011
MAX resumes drilling at Table Top gold project in Nevada, immediately south of the Newmont/Fronteer Sandman gold project
March 17, 2011
MAX acquires interest in Majuba Hill Copper/Gold/Silver Property in Nevada; exploration to focus on high-grade silver and copper potential
March 4, 2011
MAX to resume drilling at Table Top gold project in Nevada, immediately south of Fronteer Gold's Sandman gold property. Sandman is one of three Nevada properties being acquired by Newmont Mining Corp.
February 17, 2011
MAX extends mineralized drill interval to 12.1 m of 0.91 g/t Au at Table Top, Nevada
January 18, 2011
AllPennyStocks.com News: Vancouver-Based Junior Exploration Company Sees Volume Increase on Assay Results
November 26, 2010
MAX assays 7.62 meters of 0.588 g/t gold, including 1.359 g/t gold over 1.52 m, in drill core at Diamond Peak gold/silver/zinc property in Nevada; MAX samples 53.5 g/t silver in outcrop.
November 24, 2010
MAX to drill East Manhattan Wash, Nevada in October; additional soil samples of up to 1.27 g/t gold
September 27, 2010
Max completes soil sampling at Diamond Peak gold/silver/zinc property in Nevada; drill permit granted
September 22, 2010
MAX begins drilling to test mineralized structure at depth at Table Top gold project in Nevada.
September 7, 2010
Eastfield Resources Update on Iron Lake Project, BC
July 22, 2010
Max to begin exploration at its Diamond Peak Gold/Zinc Property, Nevada; adds additional 96 claims
June 29, 2010
MAX drills 27.4 meters of 0.467 g/t gold and 3 meters of 1.79 g/t gold at Table Top, Nevada; deeper drilling planned
June 22, 2010
Eastfield Resources Update on Kilometre 26 Gold Nickel Project, BC
June 7, 2010
MAX completes drill program at Table Top gold project; Drilling commences at Diamond Peak gold/zinc project in Nevada
May 19, 2010
Eastfield Signs Agreement to Option Out Indata Gold-Copper Project, BC
May 18, 2010
Eastfield Resources Announces the Return of the Zymo Copper Gold Project
May 3, 2010
MAX drills 0.823 g/t gold over 4.6 meters in silicified breccia at Table Top, Nevada; intersects potential Carlin style lamprophyre feeder system
May 3, 2010
MAX intersects mineralized zone of silicified breccia during drilling at Table Top gold project in Nevada.
April 19, 2010
MAX begins drilling at Table Top gold project in Nevada.
April 7, 2010
MAX receives drill permit for Table Top gold project in Nevada
March 8, 2010
Eastfield Resources Responds to the BC Government No Mining in the Flathead Valley Will Seek Compensation
February 10, 2010
B.C. Provincial Government halts mineral exploration in Flathead Valley
February 10, 2010
MAX stakes additional 139 claims at Table Top gold project in Nevada; Kokanee to drill MAX's Diamond Peak gold/zinc project in 2010
January 18, 2010